ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SOMANI CENTRE

Registered No litigation declared Commercial project

SOMANI CENTRE

By SOMANI DEVELOPERS

RG-MH-39889 · RERA P52100052857 · Last updated on MahaRERA portal: 24 Dec 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 39%
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

SOMANI CENTRE is a Commercial project by SOMANI DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100052857 on 5 Oct 2023. Possession is promised by 30 Dec 2027.

At a glance

Project

  • NameSOMANI CENTRE
  • TypeCommercial
  • Location
    • MULASHI
    • PUNE
    • Tathwade
    • Mulshi
    • 411033
  • Pincode411033
  • RERA no.P52100052857
  • ReraGenie IDRG-MH-39889

Builder

  • NameSOMANI DEVELOPERS
  • Entity typeOthers
  • GSTIN27AAEPS5182P1ZX
  • Named personNITIN PRABHUDAS SOMANI

Key dates

this monthRegisteredOct 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2023
  • Promised completion30 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SOMANI CENTRENA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 39%.

SOMANI CENTRE: 34% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure39%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks34%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed269

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots269
Closed/Covered1
Open Space268

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,097 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1519.17
Proposed, not sanctioned488 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO M N GROUND FLOOR

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGIRISH AND MONITA GUPTE
EngineerMANOJ BAPU PAWAR
Chartered AccountantSANDEEP RATHI AND ASSOCIATED CHARTERED ACCOUNTANTS
Chartered AccountantA Q SHAIKH & CO LLP
PartnerRole in project
SOMANI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2027

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf24 Dec 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf24 Dec 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOUSER OF SOLD AND UNSOLD.pdf24 Dec 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf24 Dec 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf24 Dec 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOUSER OF SOLD AND UNSOLD.pdf24 Dec 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf24 Dec 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf24 Dec 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOUSER OF SOLD AND UNSOLD.pdf24 Dec 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf24 Dec 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf24 Dec 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOUSER OF SOLD AND UNSOLD.pdf24 Dec 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31-12-23.pdf28 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER 31-12-23.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A-ENG-2023-24.pdf10 Mar 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD.pdf7 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31-12-23.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31-3-24.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 30-6-24.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 30-9-24.pdf4 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER 31-12-23.pdf4 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER 31-3-24.pdf4 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER 30-6-24.pdf4 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER 30-9-24.pdf4 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SOMANI CENTRE-ARCHITECT.pdf3 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 (1).pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT 1.pdf30 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT 2.pdf30 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT 3.pdf30 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT 4.pdf30 Nov 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report Somani Center- (2) (2).pdf25 Sep 2023
Proforma of Allotment letterFile: MODEL DRAFT RERA ALLOTMENT LETTER (2).pdf8 Sep 2023
Other - LegalFile: TATHHAWADE 99 AGRIMENT_1-25.pdf8 Sep 2023
Other - LegalFile: TATHHAWADE 99 AGRIMENT_26-50.pdf8 Sep 2023
Other - LegalFile: TATHHAWADE 99 AGRIMENT_51-75.pdf8 Sep 2023
Other - LegalFile: TATHHAWADE 99 AGRIMENT_76-100.pdf8 Sep 2023
Other - LegalFile: TATHHAWADE 99 AGRIMENT_101-end.pdf8 Sep 2023
Proforma of Agreement for saleFile: Agreement To Sale new (1).pdf6 Sep 2023
Layout approvalFile: PLAN HIGHLIGHT.pdf29 Aug 2023
Building plan approvalFile: 1 Commencement Certificates _ NA Order for plotted development (3).pdf29 Aug 2023
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development (5).pdf29 Aug 2023
Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development (3).pdf29 Aug 2023
Building plan approvalFile: 3 Building Plan Approval _ NA Order for plotted development (1).pdf29 Aug 2023
Building plan approvalFile: 4 Building Plan Approval _ NA Order for plotted development (1).pdf29 Aug 2023
PAN CardFile: 1 PAN Card (1).pdf29 Aug 2023
Copy of the legal title reportFile: ilovepdf_merged (67).pdf29 Aug 2023
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf29 Aug 2023
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance.pdf29 Aug 2023
Copy of Layout Approval (in case of layout)File: PLAN HIGHLIGHT.pdf29 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development (3).pdf29 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development (5).pdf29 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval _ NA Order for plotted development (3).pdf29 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 3 Building Plan Approval _ NA Order for plotted development (1).pdf29 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 4 Building Plan Approval _ NA Order for plotted development (1).pdf29 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development (3).pdf29 Aug 2023
Declaration about Commencement CertificateFile: Decleration About CC-FINAL.pdf29 Aug 2023
Declaration in FORM BFile: 1 Declaration in FORM B (1).pdf29 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-FINAL-ENGINEER.pdf29 Aug 2023
CERSAI detailsFile: 1 CERSAI details (10).pdf29 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf29 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (6).pdf29 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow29 Aug 2023
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter (3).pdf29 Aug 2023

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SOMANI CENTRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

Builder: SOMANI DEVELOPERS

SOMANI DEVELOPERS has 1 registration on MahaRERA, including SOMANI CENTRE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SOMANI CENTRE is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SOMANI CENTRE?

The registered promoter entity is SOMANI DEVELOPERS, an others as per the filing. Its GSTIN 27AAEPS5182P1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SOMANI CENTRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SOMANI CENTRE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SOMANI CENTRE?

The professionals named in the filing: Architect: GIRISH AND MONITA GUPTE; Engineer: MANOJ BAPU PAWAR; Chartered Accountant: SANDEEP RATHI AND ASSOCIATED CHARTERED ACCOUNTANTS; Chartered Accountant: A Q SHAIKH & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SOMANI CENTRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SOMANI CENTRE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SOMANI CENTRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.