Home / Browse projects / Mumbai Suburban, Maharashtra / SOLITAIRE
SOLITAIRE
RG-MH-26463 · RERA P51800008101 · Last updated on MahaRERA portal: 28 Nov 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
- 1 complaint at MahaRERA
- Completion date moved by 93 months
- 4 extensions taken
Clear
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SOLITAIRE is a Others project by SOLITAIRE CONSTRUCTIONS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008101 on 18 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 93 months from the original filing. 114 of the 156 units on this registration are recorded sold or booked, and 19 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameSOLITAIRE
- TypeOthers
- Location
- N.L. Cross Road
- Somwari Bazar
- Borivali
- Mumbai Suburban
- 400064
- Pincode400064
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800008101
- ReraGenie IDRG-MH-26463
Builder
- NameSOLITAIRE CONSTRUCTIONS
- Entity typePartnership
- PartnersABDUL RAHIM VALIMOHAMMED BILAKHYA, ARVIND VALLABHDAS SHAH, IRFAN ABDULRAHIM BILAKHYA
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on18 Aug 2017
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Mar 2019)
- Buildings2 building records
- Documents filed247 files
Current status
Figures as on 28 Nov 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| OM DATTA KRUPA WELFARE SRA SAHAKARI GRUHANIRMAN SANSTHA MARYADIT | NA | 21 | 20 | 48 | 6 | 54 |
| SOLITAIRE HEIGHTS | NA | 26 | 21 | 98 | 4 | 102 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 28 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
19 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 98%.
OM DATTA KRUPA WELFARE SRA SAHAKARI GRUHANIRMAN SANSTHA MARYADIT91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 98% |
SOLITAIRE HEIGHTS100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 98% |
Progress on shared amenities15
As on 28 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed42
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| OM DATTA KRUPA WELFARE SRA SAHAKARI GRUHANIRMAN SANSTHA MARYADIT | NA | Rs 71.96 cr | Rs 71.96 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MS DADDY & ASSOCIATES |
| Engineer | JAYESH SHAH |
| Engineer | ALTAF A HINGORA |
| Engineer | SHAH STRUCTURALS PVT. LTD. |
| Chartered Accountant | HIMANSHU TREVADIYA |
| Chartered Accountant | JIGAR ZATAKIA |
| Chartered Accountant | AMAR JUGALKISHOR PAREKH |
| Partner | Role in project |
|---|---|
| SOLITAIRE CONSTRUCTIONS | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterINITIAL DELAY DUE TO LOCKDOWN NO SUPPLY OF MATERIALS, SERVICES OF CONTRACTOR, ECONOMICAL CONDITION OF REAL ESTATE SECTOR MARKET SLOWDOWN AND PROLONGED DELAY IN OBTAINING NECESSARY APPROVAL OF THE AUTHORITY FOR THE AMENDED PLAN FOR UTILIAING BALANCE FSI INC CHANGE SCHEME AFTER OBTAINING CONSENT OF 60 FLAT OWNERS OUT OF TOTAL 82 OWNERS.
Reason as filed by the promoterEXTENDED DUE DATE WAS 30TH SEPTEMBER 2020 , PROMOTER COULD NOT COMPLETE THE PENDING WORK DUE TO VARIETY OF FACTORS MAINLY DUE TO NON-AVAILABILITY OF LABOUR BECAUSE OF COVID SITUATIONS, SHORTAGE OF MATERIALS ETC AND AS STATED IN DECLARATION CUM APPROVAL OF ALLOTTEES LETTER ATTACHED HEREWITH. ALSO PROMOTER FAMILY MEMBERS WERE HOSPITALISED AND TEAM WERE WORKING REMOTELY DUE TO WHICH IT WAS DIFFICULT IN OBTAINING APPROVAL OF ALLOTTEES , SAME HAS BEEN OBTAINED NOW AND ATTACHED HEREWITH. PROMOTER PRAYS HUMBLY THAT EXTENTION FOR 1 YEAR SHOULD BE GIVEN TO COMPLETE THE BALANCE WORK AND HANDOVER THE POS
Reason as filed by the promoterATTACHED IN OTHER AS PER OTHER ATTACHMENT
Reason as filed by the promoterWe, Solitaire Construnctions, hereby declare the following with respect to the project “SOLITAIRE” bearing registration number P51800008101 registered under MahaRERA 1. Status of Work Completed: We are pleased to inform you that we have completed the 100% of RCC (Reinforced Cement Concrete) work for the building. Currently, we are undertaking the finishing work, which includes plastering, flooring, electrical fittings, and other essential internal and external works. 2. Expected Timeline for Completion: We are committed to completing all balance works and applying for the Occupation Certificat
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 1317/2014 | CITY CIVIL COURT DINDOSHI | PENDING |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000196049 | Namrata Shinde | Solitaire Construction | 19/02/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Feb 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed247
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 247 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2017-2018)File: 1 Certificates of CA (Form 5) FY 17-18.pdf | 28 Nov 2025 |
| Form 5 (FY 2018-2019)File: FORM 5 FY 2018-19.pdf | 28 Nov 2025 |
| Form 5 (FY 2019-2020)File: FORM 5 FY 2019-20.pdf | 28 Nov 2025 |
| Form 5 (FY 2020-2021)File: Form 5 FY 2020-21 final.pdf | 28 Nov 2025 |
| Form 5 (FY 2022-2023)File: FORM 5-Annual Audit Report of Statutory CA FY 2022-23.pdf | 28 Nov 2025 |
| Form 5 (FY 2023-2024)File: New Form-5 FY 2023-24.pdf | 28 Nov 2025 |
| Form 5 (FY 2024-2025)File: New Form-5 FY 2024-25.pdf | 28 Nov 2025 |
| Form 2A (FY 2017-2018)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2018-19).pdf | 29 Oct 2025 |
| Form 2A (FY 2018-2019)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2018-19).pdf | 29 Oct 2025 |
| Form 2A (FY 2019-2020)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20).pdf | 29 Oct 2025 |
| Form 2A (FY 2020-2021)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21).pdf | 29 Oct 2025 |
| Form 2A (FY 2021-2022)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) .pdf | 29 Oct 2025 |
| Form 2A (FY 2022-2023)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf | 29 Oct 2025 |
| Form 2A (FY 2023-2024)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf | 29 Oct 2025 |
| Form 2A (FY 2024-2025)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2024-25).pdf | 29 Oct 2025 |
| Withdrawal Update Form 1File: FORM 1 Architect Certificate Apr to June-25.pdf | 27 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 APR TO JUNE-25.pdf | 27 Oct 2025 |
| Withdrawal Update Form 3File: Form-3.pdf | 27 Oct 2025 |
| Form 1File: Certificates of Architect (Form 1) OCT TO DEC-22.pdf | 16 Oct 2025 |
| Form 2File: Certificates of Engineer (Form 2) OCT TO DEC-22.pdf | 16 Oct 2025 |
| Form 3File: FORM 3 OCT TO DEC-22 FINAL.pdf | 16 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOUSER-OCT TO DEC-2022.pdf | 16 Oct 2025 |
| Form 1File: Certificates of Architect (Form 1) JAN TO MARCH-25.pdf | 16 Oct 2025 |
| Form 2File: Certificates of Engineer (Form 2) JAN TO MARCH-25.pdf | 16 Oct 2025 |
| Form 3File: FORM 3 JAN TO MAR-25 FINAL.pdf | 16 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOUSER-JAN TO MAR-2025.pdf | 16 Oct 2025 |
| Form 1File: FORM 1-APR TO JUNE-22.pdf | 13 Oct 2025 |
| Form 2File: Certificates of Engineer (Form 2) APR TO JUN-22.pdf | 13 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOUSER-APR TO JUN-2022.pdf | 13 Oct 2025 |
| Form 3File: FORM 3 APR TO JUN-22 FINAL.pdf | 13 Oct 2025 |
| Form 1File: FORM 1-JUL TO SEPT-22.pdf | 13 Oct 2025 |
| Form 2File: Certificates of Engineer (Form 2) JUL TO SEP-22.pdf | 13 Oct 2025 |
| Form 3File: FORM 3 JUL TO SEPT-22 FINAL.pdf | 13 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOUSER-JUL TO SEPT-2022.pdf | 13 Oct 2025 |
| Form 1File: Certificates of Architect (Form 1) JAN TO MAR-23.pdf | 13 Oct 2025 |
| Form 2File: Certificates of Engineer (Form 2) JAN TO MAR-23.pdf | 13 Oct 2025 |
| Form 3File: FORM 3 JAN TO MAR 23 FINAL.pdf | 13 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOUSER-JAN TO MAR-2023.pdf | 13 Oct 2025 |
| Form 1File: FORM 1-APR TO JUN-2023.pdf | 13 Oct 2025 |
| Form 2File: Certificates of Engineer (Form 2) APR TO JUNE-23.pdf | 13 Oct 2025 |
| Form 3File: FORM 3 APR TO JUN-23 FINAL.pdf | 13 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOUSER-APR TO JUN-2023.pdf | 13 Oct 2025 |
| Form 1File: FORM 1-JUL TO SEPT-2023.pdf | 13 Oct 2025 |
| Form 2File: Certificates of Engineer (Form 2) JUL TO SEPT-23.pdf | 13 Oct 2025 |
| Form 3File: FORM 3 JUL TO SEP-23 FINAL.pdf | 13 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOUSER-JUL TO SEPT-2023.pdf | 13 Oct 2025 |
| Form 1File: FORM 1-OCT TO DEC-2023.pdf | 13 Oct 2025 |
| Form 2File: Certificates of Engineer (Form 2) OCT TO DEC-23.pdf | 13 Oct 2025 |
| Form 3File: FORM 3 OCT TO DEC-23 FINAL.pdf | 13 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOUSER-OCT TO DEC-2023.pdf | 13 Oct 2025 |
| Form 1File: FORM 1-JAN TO MAR-2024.pdf | 13 Oct 2025 |
| Form 2File: Certificates of Engineer (Form 2) JAN TO MARCH-24.pdf | 13 Oct 2025 |
| Form 3File: FORM 3 JAN TO MAR-24 FINAL.pdf | 13 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOUSER-JAN TO MAR-2024.pdf | 13 Oct 2025 |
| Form 1File: Certificates of Architect (Form 1) APR TO JUNE-24.pdf | 13 Oct 2025 |
| Form 2File: Certificates of Engineer (Form 2) APR TO JUNE-24.pdf | 13 Oct 2025 |
| Form 3File: FORM 3 APR TO JUN-24 FINAL.pdf | 13 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOUSER-APR TO JUN-2024.pdf | 13 Oct 2025 |
| Form 1File: Certificates of Architect (Form 1) JUL TO SEPT-24.pdf | 13 Oct 2025 |
| Form 2File: Certificates of Engineer (Form 2) JUL TO SEPT-24.pdf | 13 Oct 2025 |
| Form 3File: FORM 3 JUL TO SEPT-24 FINAL.pdf | 13 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOUSER-JUL TO SEPT-2024.pdf | 13 Oct 2025 |
| Form 1File: Certificates of Architect (Form 1) OCT TO DEC-24.pdf | 13 Oct 2025 |
| Form 2File: Certificates of Engineer (Form 2) OCT TO DEC-24.pdf | 13 Oct 2025 |
| Form 3File: FORM 3 OCT TO DEC-24 FINAL.pdf | 13 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOUSER-OCT TO DEC-2024.pdf | 13 Oct 2025 |
| Form 1File: 1 Certificates of Architect (Form 1) OCT TO DEC-17.pdf | 13 Oct 2025 |
| Form 2File: 3 Certificates of Engineer (Form 2) OCT TO DEC-17.pdf | 13 Oct 2025 |
| Form 3File: 4 Certificates of CA (Form 3) OCT TO DEC-17.pdf | 13 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Oct-Dec- 2017.pdf | 13 Oct 2025 |
| Form 1File: APR TO JUN-2020.pdf | 11 Oct 2025 |
| Form 2File: Certificates of Engineer (Form 2) APR TO JUN-20.pdf | 11 Oct 2025 |
| Form 3File: FORM 3 APR TO JUN-2020 FINAL.pdf | 11 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Apr to Jun-2020.pdf | 11 Oct 2025 |
| Form 1File: JUL TO SEPT-2020.pdf | 11 Oct 2025 |
| Form 2File: Certificates of Engineer (Form 2) JUL TO SEP-20..pdf | 11 Oct 2025 |
| Form 3File: FORM 3 JUL TO SEPT-2020 FINAL.pdf | 11 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Jul to Sep-2020.pdf | 11 Oct 2025 |
| Form 1File: OCT TO DEC-2020.pdf | 11 Oct 2025 |
| Form 2File: Certificates of Engineer (Form 2) OCT TO DEC-20..pdf | 11 Oct 2025 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SOLITAIRE STAR | SOLITAIRE STAR OM DATTA MANDIR MARG N L CROSS ROAD NEAR SOMVARI BAZAR MUMBAI 400064 | 42 | Completed | Jul 2012 | Jul 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 247 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SOLITAIRE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Somwari Bazar6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 364 registered projects within 2 km.
Ruparel Stardom
AMI MODISPACES LLP
Chandak Treesourus
CHANDAK REALTORS PRIVATE LIMITED
ANCHORPOINT AVIARA
YUKTI INFRAPROJECTS LLP
AURIS ILARIA TOWER A
TRANSCON-SHETH CREATORS PRIVATE LIMITED
ADHRIT
MUNDARA DEVELOPERS
IRENE WING B PHASE 1
Sheth Creators and Sunvision Private Limit
See every Mumbai Suburban project, with the district possession charts
Builder: SOLITAIRE CONSTRUCTIONS
SOLITAIRE CONSTRUCTIONS has 1 registration on MahaRERA, including SOLITAIRE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if SOLITAIRE is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SOLITAIRE?
The registered promoter entity is SOLITAIRE CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SOLITAIRE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SOLITAIRE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SOLITAIRE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SOLITAIRE?
The professionals named in the filing: Architect: MS DADDY & ASSOCIATES; Engineer: JAYESH SHAH; Engineer: ALTAF A HINGORA; Engineer: SHAH STRUCTURALS PVT. LTD.; Chartered Accountant: HIMANSHU TREVADIYA; Chartered Accountant: JIGAR ZATAKIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SOLITAIRE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.