ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / SOLITAIRE AAWAS

Registration lapsed No litigation declared Residential / Group Housing project

SOLITAIRE AAWAS

By SANKET REALTORS

RG-MH-29081 · RERA P51800027732 · Last updated on MahaRERA portal: 21 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 95%
1Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

SOLITAIRE AAWAS is a Residential / Group Housing project by SANKET REALTORS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800027732 on 3 Jan 2021. Possession was promised by 30 Dec 2024 and is now 22 months past that date. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSOLITAIRE AAWAS
  • TypeResidential / Group Housing
  • Location
    • CHEMBUR
    • Kurla
    • Mumbai Suburban
    • 400089
  • Pincode400089
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800027732
  • ReraGenie IDRG-MH-29081

Builder

  • NameSANKET REALTORS
  • Entity typePartnership
  • GSTIN27ACFFS5001G1ZE
  • PartnerARUN SATYANARYAN KARWA

Key dates

22 months past promisethis monthRegisteredJan 2021PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on3 Jan 2021
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed107 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SOLITAIRE AAWAS C WINGNA1818000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

SOLITAIRE AAWAS C WING: 89% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 21 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes98%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes95%
Street LightingYes90%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed58

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots58
Closed/Covered58

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,406 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI7250.96
Proposed, not sanctioned7,251 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch163 5th floor HT Parekh Marg Backbay Reclamation Churchgate Mumbai 400021

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN RAKSHE
EngineerMANDEEP DESAI AND ASSOCIATES
Chartered AccountantNEHALI DOSHI
PartnerRole in project
SANKET REALTORS-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000198014MR. SHASHIKANT GOPAL BHAVSAR AND MRS VIJAYA SHASHIKANT BHAVSARSANKET REALTORS14/09/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Jan 2025

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Final Architect form 4.pdf21 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCC (1).pdf21 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5-CA 23-24.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5-CA 23-24.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf16 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 2024 (1).pdf16 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf16 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 2024 (1).pdf16 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA certificate- Solitaire Awaas Sept '24 (1).pdf15 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf8 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 new Mar 2024 SOLITAIRE AWAAS.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A MARCH.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Solitaire Awaas mar'24.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form_1 for rera dated 04 24.pdf9 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer form 2 sept 2023 Final.pdf9 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer form 2 Dec 2023 Final.pdf9 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_CA Certificate - Solitaire Awaas sep'23 Final.pdf9 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_CA Certificate - Solitaire Awaas Dec'23 Final.pdf9 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate May 2023.pdf31 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate July 2023.pdf31 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 March 23.pdf31 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 New June 23.pdf31 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Form 2A 22-23.pdf31 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate - Solitaire Awaas mar'23 (1).pdf31 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate - Solitaire Awaas June'23 (1).pdf31 Jul 2023
Building plan approvalFile: AMENDED IOD 27 Jan 2023.pdf24 Feb 2023
Layout approvalFile: PG 1.pdf24 Feb 2023
Layout approvalFile: PG 2.pdf24 Feb 2023
Layout approvalFile: PG 3.pdf24 Feb 2023
Layout approvalFile: PG 4.pdf24 Feb 2023
Layout approvalFile: PG 5.pdf24 Feb 2023
Layout approvalFile: PG 6.pdf24 Feb 2023
Layout approvalFile: PG 7.pdf24 Feb 2023
Copy of Layout Approval (in case of layout)File: PG 1.pdf24 Feb 2023
Copy of Layout Approval (in case of layout)File: PG 2.pdf24 Feb 2023
Copy of Layout Approval (in case of layout)File: PG 3.pdf24 Feb 2023
Copy of Layout Approval (in case of layout)File: PG 4.pdf24 Feb 2023
Copy of Layout Approval (in case of layout)File: PG 5.pdf24 Feb 2023
Copy of Layout Approval (in case of layout)File: PG 6.pdf24 Feb 2023
Copy of Layout Approval (in case of layout)File: PG 7.pdf24 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: AMENDED IOD 27 Jan 2023.pdf24 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: Full CC Date 23-02-2023.pdf24 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 march 21.pdf22 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 december 22.pdf22 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 march 21.pdf22 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 march 22.pdf22 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 sept 22.pdf22 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 december 22.pdf22 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A 21-22.pdf22 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 march 21.pdf22 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 march 22.pdf22 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 septemebr 22.pdf22 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 december 22.pdf22 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 20-21.pdf22 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 21-22.pdf22 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf21 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf18 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer form 2.pdf18 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca form 3.pdf18 Aug 2022
Details of encumbrancesFile: Details of Encumbrance.pdf13 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1.pdf13 Jun 2022
Proforma of Allotment letterFile: Final Draft Agreement C L P.pdf13 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: Full CC upto 16th (PT) Floor.pdf9 Feb 2022
Building plan approvalFile: Amended IOD Dtd.pdf27 Jan 2022
Layout approvalFile: plan 1.pdf27 Jan 2022
Layout approvalFile: plan 2.pdf27 Jan 2022
Layout approvalFile: plan 3.pdf27 Jan 2022
Layout approvalFile: plan 4.pdf27 Jan 2022
Layout approvalFile: plan 5.pdf27 Jan 2022
Layout approvalFile: plan 6.pdf27 Jan 2022
Layout approvalFile: plan 7.pdf27 Jan 2022
Copy of Layout Approval (in case of layout)File: plan 1.pdf27 Jan 2022
Copy of Layout Approval (in case of layout)File: plan 2.pdf27 Jan 2022
Copy of Layout Approval (in case of layout)File: plan 3.pdf27 Jan 2022
Copy of Layout Approval (in case of layout)File: plan 4.pdf27 Jan 2022
Copy of Layout Approval (in case of layout)File: plan 5.pdf27 Jan 2022
Copy of Layout Approval (in case of layout)File: plan 6.pdf27 Jan 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SOLITAIRE AAWAS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHEMBUR6,700+ in Mumbai Suburban

2 kmSOLITAIRE AAWASCompleted 166Lapsed / revoked 124Other 186Dot size: filed unitsN

Filed coordinates, straight-line distance. 476 registered projects within 2 km.

Builder: SANKET REALTORS

SANKET REALTORS has 1 registration on MahaRERA, including SOLITAIRE AAWAS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that SOLITAIRE AAWAS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SOLITAIRE AAWAS is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SOLITAIRE AAWAS?

The registered promoter entity is SANKET REALTORS, a partnership as per the filing. Its GSTIN 27ACFFS5001G1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SOLITAIRE AAWAS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SOLITAIRE AAWAS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SOLITAIRE AAWAS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SOLITAIRE AAWAS?

The professionals named in the filing: Architect: SACHIN RAKSHE; Engineer: MANDEEP DESAI AND ASSOCIATES; Chartered Accountant: NEHALI DOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SOLITAIRE AAWAS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SOLITAIRE AAWAS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SOLITAIRE AAWAS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.