ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SOHAM SRUSHTI

Registered No litigation declared Residential / Group Housing project

SOHAM SRUSHTI

By SOHAM DEVELOPERS

RG-MH-53395 · RERA P52100055288 · Last updated on MahaRERA portal: 5 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Staircases, 95%
35 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

SOHAM SRUSHTI is a Residential / Group Housing project by SOHAM DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100055288 on 14 Mar 2024. Possession is promised by 31 Dec 2026. 21 of the 56 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSOHAM SRUSHTI
  • TypeResidential / Group Housing
  • Location
    • Near Raghunandan Mangal Karyalay
    • Behind Raman Stellar
    • TATHAWADE
    • Pimpri Chinchawad (M Corp.)
    • Tathwade
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055288
  • ReraGenie IDRG-MH-53395

Builder

  • NameSOHAM DEVELOPERS
  • Entity typePartnership
  • PartnerYOGITA MAHESH BARNE
  • Other registrations8 more →
  • Completed4 of 9
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredMar 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Mar 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed80 files

Current status

38%21 of 56 units booked
55.9%Work done, per cost certificate

Figures as on 5 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA9756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

WING A: 62% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises64%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.89%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.4%

Progress on shared amenities15

As on 5 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed109

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots109
Closed/Covered43
Open Space66

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Jul 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI4159.09
Proposed, not sanctioned3,907 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 2, G O SQUARE, S NO 249, 250, 251, WAKAD, PUNE 411057
Estimated costRs 8.00 cr
Cost incurredRs 4.48 cr
Work done55.94%
BuildingWingEstimatedIncurred
WING ANARs 8.00 crRs 4.48 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGIRISH GUPTE GEM ASSOCIATES GUPTE
EngineerSURAJ B WAGHDARIKAR
EngineerAMOL NIRMAL
EngineerNITTEN N TAANTAK
Chartered AccountantABHINANDAN JAIN N P S R AND ASSOCIATES
Chartered AccountantARTI JAIN
Chartered AccountantPANKAJ PATIL
Chartered AccountantManatu Kumbhar
PartnerRole in project
SOHAM DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Sep 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A FY 25 26 SOHAM SHRUSHIT1.pdf5 Jun 2026
Form 5 (FY 2025-2026)File: Form 5 soham shrusti 2025-26 final 1.pdf24 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf20 Apr 2026
Withdrawal Update Form 2File: form 2.pdf20 Apr 2026
Withdrawal Update Form 2File: form 2.pdf20 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf20 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf20 Apr 2026
Form 2A (FY 2023-2024)File: FORM 2A SOAHAM SHRUSHTI F Y 23 24 FINAL.pdf4 Apr 2026
Form 2A (FY 2024-2025)File: FORM 2A FY 24 25 SOHAM SHRUSHIT.pdf4 Apr 2026
Form 5 (FY 2023-2024)File: Soham Dev 23-24 FORM 5 COPY.pdf16 Feb 2026
Form 5 (FY 2024-2025)File: New soham shrushti form 5 (soham developers).pdf16 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf20 Jan 2026
Withdrawal Update Form 2File: form 2.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3.pdf20 Jan 2026
Withdrawal Update Form 1File: form 1.pdf18 Oct 2025
Withdrawal Update Form 2File: form 2.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf18 Oct 2025
Layout approvalFile: 1 SANCTION PLAN .pdf4 Sep 2025
Building plan approvalFile: 2 SANCTION PLAN.pdf4 Sep 2025
Building plan approvalFile: 3 SANCTION PLAN .pdf4 Sep 2025
Building plan approvalFile: Revised CC.pdf4 Sep 2025
Withdrawal Update Form 1File: Form 1.pdf19 Jul 2025
Withdrawal Update Form 1File: Form 1.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2_11zon.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2_11zon.pdf19 Jul 2025
Withdrawal Update Form 3File: FORM 3 ( SOHAM SRUSHTI).pdf19 Jul 2025
Withdrawal Update Form 3File: FORM 3 ( SOHAM SRUSHTI).pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: soham developers form 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SOHAM SRUSHTI FORM 3.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SOHAM SRUSHTI FORM 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SOHAM SRUSHTI form 2.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: final All sold unsold shops history - Copy.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SOHAM SRUSHTI.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SOHAM DEVELOPERS.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 2.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: final All sold unsold shops history.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Soham Dev 23-24 FORM 5 COPY.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 soham srushti Q 2.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SOHAM SRUSHTI.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SOHAM SRUSHTI.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: sold unsold.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A SOHAM SRUSHTI.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SOHAM SRUSHTI.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SOHAM SRUSHTI.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: final All sold unsold shops history - Copy.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3soham developers SOHAM SRUSHTI.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS ASSOCIATES (3).pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SOHAM SRUSHTI_11zon.pdf20 Apr 2024
Other - TechnicalFile: 6 formatformat D for declaration about commencement revised.pdf6 Mar 2024
Other - LegalFile: partnership deed soham developers notorized .pdf26 Feb 2024
Other - TechnicalFile: Yahoo Mail Fwd Commencement Certificate Verification For RERA Application No REA521001530626 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 9 seperate bank account ORDER 34 BANK DETAILS.pdf22 Feb 2024
Other - LegalFile: declaration cum undertaking one plot one rera circular 50.pdf22 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 7 MAHESH N BARNE Disclosure of Interest in Other Real Estate Organizations Order No 39 - C11 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: YOGITA BARNE Disclosure of Interest in Other Real Estate Organizations Order No 39 - Copy.11 Feb 2024
Declaration in FORM BFile: form B.pdf5 Feb 2024
Layout approvalFile: 1.pdf4 Feb 2024
Building plan approvalFile: 2.pdf4 Feb 2024
Building plan approvalFile: 3.pdf4 Feb 2024
PAN CardFile: PAN SOHAM DEVELOPERS (1).pdf4 Feb 2024
Copy of the legal title reportFile: search report merged.pdf4 Feb 2024
Copy of the legal title reportFile: 42 2 Satbara.pdf4 Feb 2024
Details of encumbrances concerned to FinanceFile: 1 DETAILS OF ENCUMBRANCES.pdf4 Feb 2024
Details of encumbrances concerned to FinanceFile: No total encumbrances letter draft soham developers.pdf4 Feb 2024
Details of encumbrances concerned to LegalFile: 1 DETAILS OF ENCUMBRANCES.pdf4 Feb 2024
Details of encumbrances concerned to LegalFile: No total encumbrances letter draft soham developers.pdf4 Feb 2024
Copy of Layout Approval (in case of layout)File: 1.pdf4 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf4 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf4 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf4 Feb 2024
Declaration about Commencement CertificateFile: format D for declaration about commencement revised.pdf4 Feb 2024
CERSAI detailsFile: CERSAI_Search_Report_200294995580_For_Asset_Based_Search_29_01_2024_19_37_26_789.pdf4 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Shoma srushti.pdf4 Feb 2024
Proforma of Agreement for saleFile: RERA Draft (2).pdf4 Feb 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf4 Feb 2024
Deviation Report with respect to Allotment letterFile: ALLOTMENT LETTER letter draft soham developers.pdf4 Feb 2024
Deviation Report with respect to model copy of AgreementFile: AGREEMENT COPY letter draft soham shivam developers.pdf4 Feb 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
OMEGA COMMERCIAL COMPLEX - SOHAM ICONWAKAD TAL MULSHI PUNE 4110571OngoingDec 2025Dec 2025

How this compares with Pune

38%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SOHAM SRUSHTI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TATHAWADE, Pimpri Chinchawad (M Corp.),13,700+ in Pune

2 kmSOHAM SRUSHTICompleted 92Lapsed / revoked 42Other 65Dot size: filed unitsN

Filed coordinates, straight-line distance. 199 registered projects within 2 km.

Builder: SOHAM DEVELOPERS

Soham Developers has 9 registrations on MahaRERA, including OMEGA COMMERCIAL COMPLEX - SOHAM ICON and SONAL CO-OP HOUSING SOCIETY. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SOHAM SRUSHTI is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SOHAM SRUSHTI?

The registered promoter entity is SOHAM DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SOHAM SRUSHTI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SOHAM SRUSHTI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SOHAM SRUSHTI?

The professionals named in the filing: Architect: GIRISH GUPTE GEM ASSOCIATES GUPTE; Engineer: SURAJ B WAGHDARIKAR; Engineer: AMOL NIRMAL; Engineer: NITTEN N TAANTAK; Chartered Accountant: ABHINANDAN JAIN N P S R AND ASSOCIATES; Chartered Accountant: ARTI JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SOHAM SRUSHTI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SOHAM SRUSHTI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SOHAM SRUSHTI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.