SOHAM HEIGHTS

By MetroDevelopers

RG-MH-09774 · RERA P52600002103 · Last updated on MahaRERA portal: 6 Dec 2019

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 78 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 40%
0Complaints at MahaRERAon this registration
Jump to the 17 documents Report an error

SOHAM HEIGHTS is a Residential / Group Housing project by MetroDevelopers in Solapur, Maharashtra, registered with MahaRERA as P52600002103 on 31 Jul 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 78 months from the original filing.

At a glance

Project

  • NameSOHAM HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • Barshi
    • Solapur
    • 413401
  • Pincode413401
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52600002103
  • ReraGenie IDRG-MH-09774

Builder

  • NameMetroDevelopers
  • Entity typePartnership
  • PartnersMOIZE HUSSENI BHORI, SANDIPKUMAR NAMDEV RAUT, BHUSHAN BHUJANGRAO KADAM, RAMCHANDRA LAXMANRAO BABLADKAR

Key dates

10 months past promisethis monthRegisteredJul 2017First promiseJun 2019Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Jul 2017
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 Jun 2019)
  • Buildings1 building record
  • Documents filed17 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SOHAM HEIGHTSNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Dec 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 40%.

SOHAM HEIGHTS: 34% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Dec 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed5

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots5
Open Space5

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,285 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
LAXMAN ANANT DEKHMUKHBarshiSolapur

Approvals and building plan

Permissible FSI1641.92
Proposed, not sanctioned1,642 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBarshi Road Shaha Chambers CTS No 2511 Tel Girni Chowk Barshi

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManohar Yeravar
EngineerDhairyasheel Khaire Patil
PartnerRole in project
MetroDevelopers-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52600002607Jun 2019 → Jun 2020

Reason as filed by the promoterTo, Maharashtra Real Estate Regulatory Authority 3 rd Floor, A-Wing, Slum Rehabilitation Authority, Administrative Building , Anant Kanekar Marg, Bandra(E), Mumbai-400051 Subject - Application for extension of project “Soham Heights”. Dear Sir /Ma’am We wish to apply for extension under section 7 of the act to the following project: Project Name- Soham Heights registered with MAHARERA vide project registration certificate bearing number-P52600002103. Our project registration certificate expired on 30/06/2019.The final date of completion is 29/06/2020.We want extension for one year as the proje

EXT52600027995Jun 2019 → Dec 2025

Reason as filed by the promoterSir, We, Metro Developers, hereby apply for extension u/s 7(3) of the registered project Soham Heights bearing vide no P52600002103. As prescribed under circular no 07/2019 dated 08 Feb 2019, the consent of 51% of the allottees is enclosed herewith.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed17

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
OtherFile: CREDAI - Certificate.pdf6 Dec 2019
Declaration in FORM BFile: Form B_.pdf4 Nov 2019
OtherFile: Part OC.pdf4 Nov 2019
Certificates of CA (Form 3)File: CAFORM.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHI FORM.pdf26 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG FORM.pdf26 Jul 2017
Proforma of Allotment letterFile: AgreementOfSale.pdf26 Jul 2017
Proforma of Allotment letterFile: ALLOTMENT.pdf26 Jul 2017
Copy of the legal title reportFile: SEARCH REPORT.pdf25 Jul 2017
Declaration in FORM BFile: FORM B.pdf25 Jul 2017
Layout approvalFile: LAYOUT.pdf21 Jul 2017
Building plan approvalFile: FLOORPLAN_compressed.pdf21 Jul 2017
Details of encumbrancesFile: SEARCH REPORT.pdf21 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf21 Jul 2017
Building Plan Approval (IOD)File: FLOORPLAN_compressed.pdf21 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CONSTRUCTION PERMISSION.pdf21 Jul 2017
PAN CardFile: PANCARD.pdf17 Jul 2017

How this compares with Solapur

15%of Solapur projects moved their completion datethis one moved by 78 months
39%of Solapur registrations have lapsed or been cancelledthis one is among them

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep SOHAM HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Barshi550+ in Solapur

Builder: MetroDevelopers

MetroDevelopers has 1 registration on MahaRERA, including SOHAM HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What does it mean that SOHAM HEIGHTS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SOHAM HEIGHTS is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SOHAM HEIGHTS?

The registered promoter entity is MetroDevelopers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SOHAM HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SOHAM HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SOHAM HEIGHTS?

The professionals named in the filing: Architect: Manohar Yeravar; Engineer: Dhairyasheel Khaire Patil. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SOHAM HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SOHAM HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SOHAM HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.