Registered No litigation declared Mixed project

Skyrena

By M.D Developers

RG-MH-31434 · RERA P52100079769 · Last updated on MahaRERA portal: 20 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Feb 2028Possession promisedno revision filed
1 of 11Construction stages doneacross 2 buildings; furthest along: Basement (if any), 50%
19 of 23Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 50 documents Report an error

Skyrena is a Mixed project by M.D Developers in Pune, Maharashtra, registered with MahaRERA as P52100079769 on 26 Mar 2025. Possession is promised by 29 Feb 2028. 4 of the 23 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSkyrena
  • TypeMixed
  • Location
    • Pune Solapur Road
    • Manjari Bk
    • Haveli
    • Pune
    • 412307
  • Pincode412307
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100079769
  • ReraGenie IDRG-MH-31434

Builder

  • NameM.D Developers
  • Entity typePartnership
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2025PromisedFeb 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Mar 2025
  • Promised completion29 Feb 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed50 files

Current status

17%4 of 23 units booked
17.3%Work done, per cost certificate

Figures as on 20 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SkyrenaNA5415722

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 50%.

Skyrena14%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed79

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots79
Closed/Covered20
Open Space59

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,714 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jul 2025

Approvals and building plan

Sanctioning authorityPune metropolitan Region Development Authority, Pune
Permissible FSI2290.52
Proposed, not sanctioned1,995 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPAWAR BLDG, J.M.ROAD, SHIVAJINAGAR, PUNE
Estimated costRs 9.75 cr
Cost incurredRs 1.69 cr
Work done17.28%
BuildingWingEstimatedIncurred
SkyrenaNARs 9.75 crRs 1.69 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArpan Architects
EngineerMK Construction
EngineerMayur Gangaram More
Chartered AccountantR H Pothiwal & Associates
Chartered AccountantGSKM & Associates
Chartered AccountantPravin Pise
PartnerRole in project
M.D Developers-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12600895Amol Baburao AlmanM.D Developers18/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Mar 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 29 Feb 2028

Documents filed50

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate.pdf20 May 2026
Withdrawal Update Form 2File: Engineer Certificate mar 26.pdf20 May 2026
Withdrawal Update Form 3File: F3-SKYRENA mar 26.pdf20 May 2026
Withdrawal Update Form 1File: Architect Certificate (1).pdf21 Feb 2026
Withdrawal Update Form 1File: Architect Certificate (1).pdf21 Feb 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate.pdf21 Feb 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate.pdf21 Feb 2026
Withdrawal Update Form 3File: F3-SKYRENA-SEPT-25_compressed.pdf21 Feb 2026
Withdrawal Update Form 3File: F3-SKYRENA.pdf21 Feb 2026
Withdrawal Update Form 1File: FM_1_Sep_2025.pdf12 Jan 2026
Withdrawal Update Form 2File: Enginner Certificate.pdf12 Jan 2026
Withdrawal Update Form 3File: F3-SKYRENA-SEPT-25_compressed.pdf12 Jan 2026
Withdrawal Update Form 1File: Form 1_June 25.pdf5 Aug 2025
Withdrawal Update Form 2File: Form 2_June 25.pdf5 Aug 2025
Withdrawal Update Form 3File: Form 3_June 25.pdf5 Aug 2025
Copy of the legal title reportFile: Title Report.pdf22 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate (1)_page-0001.pdf15 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf15 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B_page-0001 (1).pdf15 Mar 2025
Details of encumbrances concerned to FinanceFile: EC - Fin.pdf14 Mar 2025
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal.pdf14 Mar 2025
Declaration in FORM BFile: Form B_1.pdf14 Mar 2025
Declaration about Commencement CertificateFile: Form D.pdf14 Mar 2025
CERSAI detailsFile: CERSAI details (1).pdf14 Mar 2025
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal.pdf14 Mar 2025
Details of encumbrances concerned to LegalFile: EC - Fin.pdf14 Mar 2025
Other - TechnicalFile: One Plot One Registration.pdf14 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: Secaused.pdf13 Mar 2025
Other - LegalFile: PARTNERSHIP DEED NEW.pdf5 Mar 2025
Deviation Report with respect to model copy of AgreementFile: DECLARATION FOR DEVIATION IN AGREEMENT FOR SALE.pdf5 Mar 2025
Proforma of Agreement for saleFile: AGREEMENT TO SALE NEW.pdf5 Mar 2025
Proforma of Agreement for saleFile: Annexure 1 NEW.pdf5 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE-A-DISCLOSURE OF INTEREST-MANGESH MORE.pdf5 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE-A-DISCLOSURE OF INTEREST- RAMESH DANDALE.pdf5 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-ARCHITECT CERTIFICATE.pdf24 Feb 2025
Other - LegalFile: PARTNERSHIP DEED.pdf24 Feb 2025
Layout approvalFile: PLAN-1.pdf22 Feb 2025
Layout approvalFile: PARKING PLAN.pdf22 Feb 2025
Copy of Layout Approval (in case of layout)File: PLAN-1.pdf22 Feb 2025
Copy of Layout Approval (in case of layout)File: PARKING PLAN.pdf22 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE-PMRDA.pdf17 Feb 2025
Other - LegalFile: FERFAR.pdf17 Feb 2025
Other - LegalFile: FERFAR-2.pdf17 Feb 2025
Other - LegalFile: KHAREDI KHAT AND INDEX II.pdf17 Feb 2025
Building plan approval or NA orderFile: PLAN-1.pdf7 Feb 2025
PAN CardFile: PAN-FOIRM- MD DEVELOPERS.pdf7 Feb 2025
Proforma of Allotment letterFile: PROFORMA ALLOTMENT LETTER.pdf7 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-1.pdf7 Feb 2025
Deviation Report with respect to Allotment letterFile: DECLARATION FOR DEVIATION IN ALLOTMENT.pdf7 Feb 2025

How this compares with Pune

17%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Skyrena on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Manjari Bk13,700+ in Pune

2 kmSkyrenaCompleted 36Lapsed / revoked 14Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 88 registered projects within 2 km.

Builder: M.D Developers

M.D. DEVELOPERS has 4 registrations on MahaRERA, including MADHUBAN A AND A1 WING and NAWAJISH PARK. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Skyrena is delayed beyond 29 Feb 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Skyrena?

The registered promoter entity is M.D Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Skyrena?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Skyrena?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Skyrena?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Skyrena?

The professionals named in the filing: Architect: Arpan Architects; Engineer: MK Construction; Engineer: Mayur Gangaram More; Chartered Accountant: R H Pothiwal & Associates; Chartered Accountant: GSKM & Associates; Chartered Accountant: Pravin Pise. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Skyrena?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Skyrena. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Skyrena to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.