Home / Browse projects / Nagpur, Maharashtra / SKYLINE TOWER
SKYLINE TOWER
RG-MH-57451 · RERA P50500052872 · Last updated on MahaRERA portal: 25 Mar 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SKYLINE TOWER is a Others project by M/S. METRO INFRA in Nagpur, Maharashtra, registered with MahaRERA as P50500052872 on 5 Oct 2023. Possession is promised by 31 Dec 2028.
At a glance
Project
- NameSKYLINE TOWER
- TypeOthers
- Location
- KH NO. 275 CTS NO 248
- CENTRAL AVENUE
- AMBEDKAR SQUARE NAGPUR
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440008
- Pincode440008
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500052872
- ReraGenie IDRG-MH-57451
Builder
- NameM/S. METRO INFRA
- Entity typePartnership
- PartnersHEMANT PANJABRAO GAWANDE, SUJATA HEMANT GAWANDE, PRADIP DIGAMBAR BANTE, ARUN NAMDEORAO HARODE, NILESH NAMDEORAO KARWATKAR
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Oct 2023
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed74 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SKYLINE TOWER | NA | 13 | 11 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 20%.
SKYLINE TOWER: 48% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 25 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| GYMNASIUM | Yes | 0% |
Parking filed95
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| M/s KHATUSHYAM DEVELOPERS | Nagpur (M Corp.) | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VARSHA CREATIONS |
| Engineer | Varsha Creations |
| Chartered Accountant | SUMIT R CHANDWANI |
| Chartered Accountant | ASHISH AGARWAL |
| Partner | Role in project |
|---|---|
| M/S. METRO INFRA | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Aug 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed74
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 Architect certificate March 25.pdf | 25 Mar 2026 |
| Form 2File: Form 2 Engineer certificate March 25.pdf | 25 Mar 2026 |
| Form 3File: Form 3 CA certificate MArch 2025.pdf | 25 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Book Inventory Skyline Tower March 25.pdf | 25 Mar 2026 |
| Form 1File: Form 1 Architect certificate June 25.pdf | 25 Mar 2026 |
| Form 2File: Form 2 Engineer certificate June 25.pdf | 25 Mar 2026 |
| Form 3File: Form 3 CA Certificate June 2025.pdf | 25 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Book Inventory - Skyline Tower - june2025.pdf | 25 Mar 2026 |
| Form 1File: Form 1 Architect Certificate Sept 25.pdf | 25 Mar 2026 |
| Form 2File: Form 2 Engineer Certificate Sept 25.pdf | 25 Mar 2026 |
| Form 3File: Form 3 CA Certificate Sept 25.pdf | 25 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Book Inventory - Skyline Tower - sept2025.pdf | 25 Mar 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Maha Rera1.pdf | 21 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Maha Rera 2.pdf | 21 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Maha Rera3.pdf | 21 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Skyline Tower - Developer - Sep 24.pdf | 13 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Skyline Tower - Developer - Dec 24.pdf | 13 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - Skyline Tower - Developer - June 24.pdf | 13 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - Skyline Tower - Developer - Sep 24.pdf | 13 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - Skyline Tower - Developer - Dec 24.pdf | 13 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Skyline Tower - Developer - Sep 24.pdf | 13 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Skyline Tower - Developer - Dec 24.pdf | 13 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Skyline Tower - June 24.pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Skyline Tower - June 24.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Skyline Tower - June 24.pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Skyline Tower - June 24.pdf | 7 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - Skyline Tower - Dec 23.pdf | 2 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - Skyline Tower (Landowner) - Dec 23.pdf | 2 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - Skyline Tower - March 24.pdf | 2 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - Skyline Tower (Landowner) - March 24.pdf | 2 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Skyline Tower - Dec 23.pdf | 25 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Skyline Tower - March 24.pdf | 25 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Skyline Tower - Dec 23.pdf | 25 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Skyline Tower - March 24.pdf | 25 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: 4 Sold Booked Inv - Skyline Tower - Dec 23.pdf | 6 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: 4 Sold Booked Inv - Skyline Tower - March 24.pdf | 6 Jun 2024 |
| Other - LegalFile: METRO INFRA.pdf | 27 Sep 2023 |
| Other - LegalFile: Sale deed ( khatushyam developers )-1-12.pdf | 26 Sep 2023 |
| Other - LegalFile: Sale deed ( khatushyam developers )-13-24.pdf | 26 Sep 2023 |
| Layout approvalFile: Map 1.pdf | 8 Aug 2023 |
| Layout approvalFile: Map 2.pdf | 8 Aug 2023 |
| Layout approvalFile: Map 3.pdf | 8 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: Map 1.pdf | 8 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: Map 2.pdf | 8 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: Map 3.pdf | 8 Aug 2023 |
| Declaration in FORM BFile: Form B Metro Infra.pdf | 8 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Metro Infra.pdf | 8 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Khatushyam Developers.pdf | 8 Aug 2023 |
| Proforma of Allotment letterFile: Allotment Letter Metro Infra.pdf | 8 Aug 2023 |
| Building plan approvalFile: Map 1.pdf | 7 Aug 2023 |
| Building plan approvalFile: Map 2.pdf | 7 Aug 2023 |
| Building plan approvalFile: Map 3.pdf | 7 Aug 2023 |
| PAN CardFile: MetroInfra Pan Card.pdf | 7 Aug 2023 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 7 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: financial encumbrance.pdf | 7 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: legal encumbrance.pdf | 7 Aug 2023 |
| Details of encumbrances concerned to LegalFile: financial encumbrance.pdf | 7 Aug 2023 |
| Details of encumbrances concerned to LegalFile: legal encumbrance.pdf | 7 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Map 1.pdf | 7 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Map 2.pdf | 7 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Map 3.pdf | 7 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 7 Aug 2023 |
| Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf | 7 Aug 2023 |
| CERSAI detailsFile: Cersai.pdf | 7 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Annexure A Vishal AnilRao Wadibhasme.pdf | 7 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Annuxure A Hemant punjabrao Gawande.pdf | 7 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 3 Annuxure A Sujata hemant Gawande.pdf | 7 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 4 annuxure A Pradip Digambar Bante.pdf | 7 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 5 Annuxure A Arun NamdevRao Harode.pdf | 7 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 6 annuxure A Nilesh NamdevRao karwatkar.pdf | 7 Aug 2023 |
| Proforma of Agreement for saleFile: AGREEMENT TO SELL FINAL DRAFT.pdf | 7 Aug 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration about separate bank.pdf | 7 Aug 2023 |
| Deviation Report with respect to Allotment letterFile: declaration about deviation report in allotment letter.pdf | 7 Aug 2023 |
| Deviation Report with respect to model copy of AgreementFile: declaration about deviation report in agreement for sale.pdf | 7 Aug 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 74 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SKYLINE TOWER on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near AMBEDKAR SQUARE NAGPUR2,800+ in Nagpur
Filed coordinates, straight-line distance. 37 registered projects within 2 km.
KUKREJA PARIS CITY-WING C & D
KUKREJA INFRASTRUCTURES
kASTURI HEIGHT
SKY DEVELOPERS AND PROMOTERS INDIA PVT. LT
EASTORIA GRACE
EASTORIA BUILDERS AND DEVLOPERS LLP
SDPL Om
SANDEEP DWELLERS PVT. LTD.
UDYOG VIHAR
ALLIANCE REALITIES
KUKREJA INFINITY EAST
KUKREJA INFRASTRUCTURES
See every Nagpur project, with the district possession charts
Builder: M/S. METRO INFRA
M/S. METRO INFRA has 1 registration on MahaRERA, including SKYLINE TOWER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if SKYLINE TOWER is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SKYLINE TOWER?
The registered promoter entity is M/S. METRO INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SKYLINE TOWER?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SKYLINE TOWER?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SKYLINE TOWER?
The professionals named in the filing: Architect: VARSHA CREATIONS; Engineer: Varsha Creations; Chartered Accountant: SUMIT R CHANDWANI; Chartered Accountant: ASHISH AGARWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SKYLINE TOWER?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback