ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SkyHigh Towers D4

Registered No litigation declared Residential / Group Housing project

SkyHigh Towers D4

By New World Landmark LLP

RG-MH-62484 · RERA P52100048403 · Last updated on MahaRERA portal: 2 May 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedmoved 12 months from the original
1 of 11Construction stages donefurthest along: Basement (if any), 40%
160 of 160Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

SkyHigh Towers D4 is a Residential / Group Housing project by New World Landmark LLP in Pune, Maharashtra, registered with MahaRERA as P52100048403 on 3 Jan 2023. Possession is promised by 30 Dec 2029. The completion date has moved by 12 months from the original filing. 0 of the 160 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameSkyHigh Towers D4
  • TypeResidential / Group Housing
  • Location
    • Near Hinjewadi Phase 2
    • Hinjewadi
    • Man
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • RERA no.P52100048403
  • ReraGenie IDRG-MH-62484

Builder

  • NameNew World Landmark LLP
  • Entity typePartnership
  • PartnerSunil Mittal
  • Other registrations3 more →
  • Completed1 of 4
  • Declared earlier projects3 →

Key dates

this monthRegisteredJan 2023First promiseDec 2028Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jan 2023
  • Promised completion30 Dec 2029
  • Revised completionRevised to 30 Dec 2029 (originally 31 Dec 2028)
  • Buildings1 building record
  • Documents filed69 files

Current status

0%0 of 160 units booked

Figures as on 2 May 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D4NA26231600160

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 40%.

D4: 17% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)40%
Podiums (if any)0%
Plinth40%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks2%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities17

As on 2 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Underground Water TankYes0%
Compound WallYes0%

Parking filed104

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots104
Closed/Covered104

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area239 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI15231.86
Proposed, not sanctioned5,232 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShivajinagar Pune

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVKa architechture
EngineerManjiri Desai
Chartered AccountantSAC & Co LLP
Chartered AccountantPriyanka Chordiya and Associates
PartnerRole in project
New World Landmark LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100019113Dec 2028 → Dec 2029

Reason as filed by the promoterDue to financial liquidity concerns and NIL bookings till date, hence requesting the grace period extension from 31.12.2028 to 30.12.2029

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2029

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 SkyHigh D4 Mar 2025.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AS Skyhigh D4 30032025_compressed.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 SkyHigh D4 Mar 2025.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: SKY HIGH TOWERS D4 Inventory.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Inventory D4_P52100048403.pdf7 Apr 2025
Disclosure of sold/ booked inventoryFile: Inventory_SkyHigh Towers D4 for Sep.pdf7 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SkyHigh Towers D4.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 SkyHigh Towers D4 31-12-2024_compressed.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SkyHigh Towers D4.pdf29 Jan 2025
Disclosure of sold/ booked inventoryFile: Sky High D4.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 D4.pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 2_SkyHigh Towers D4.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2_SkyHigh Towers D4.pdf12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 SkyHigh Towers D4 31-03-2024.pdf8 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM_2A_SkyHigh Towers D4.pdf13 Aug 2024
Declaration in FORM BFile: FORM_B.pdf10 Jun 2024
Disclosure of sold/ booked inventoryFile: d4 q1.pdf4 May 2024
Disclosure of sold/ booked inventoryFile: d4 q2.pdf4 May 2024
Disclosure of sold/ booked inventoryFile: d4 q4.pdf4 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 D4.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 D4.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 SkyHigh Towers D4 31-03-2024_compressed.pdf29 Apr 2024
Declaration in FORM BFile: 0_Form B New.pdf29 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest- SM for NWL.pdf29 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_DM for NWL.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SKY HIGH TOWER D4.pdf17 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_Sky High Towers D4.pdf17 Feb 2024
Disclosure of sold/ booked inventoryFile: Inventory_SkyHigh Towers D.pdf17 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AS Skyhigh D4 31122023-both sign_compressed.pdf17 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SKY HIGH TOWERS D4.pdf7 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SkyHigh Towers D4.pdf7 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Sky High Towers D4 30092023_compressed.pdf7 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AS Skyhigh D4 30062023-both sign_compressed.pdf7 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 PC FY 22_23 SkyHigh Towers D4_Both sign_compressed.pdf7 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 SKY HIGH D4 ARCHITECT CERTIFICATE.pdf31 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 SKY HIGH D4 ENGINEERING CERTIFICATE.pdf31 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A SKY HIGH D4 QUALITY ASSURANCE CERTIFICATE.pdf31 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 D4 March 2023.pdf17 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Skyhigh D 4 March 2023.pdf17 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AS Skyhigh D4 30032023 both sign_compressed.pdf17 Jul 2023
Proforma of Agreement for saleFile: 2 Proforma of Agreement to sale.pdf27 Jun 2023
Proforma of Agreement for saleFile: 2 Proforma of Agreement to sale.pdf3 May 2023
Details of encumbrances concerned to FinanceFile: 0_Emccumbrance update D4.pdf21 Feb 2023
Details of encumbrances concerned to LegalFile: 0_Emccumbrance update D4.pdf21 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: AC no update D4.pdf21 Feb 2023
CERSAI detailsFile: CERSAI_Search_Report.pdf23 Dec 2022
Proforma of Agreement for saleFile: 2- Agreement to Sale for SkyHigh Tower D4.pdf20 Dec 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report for ATS for D4.pdf20 Dec 2022
Layout approvalFile: 0_layout_Model.pdf10 Dec 2022
Copy of Layout Approval (in case of layout)File: 0_layout_Model.pdf10 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 sky high tower D4 signed.pdf10 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: D4 Declaration for AC.pdf9 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: CC 15_11_2022.pdf30 Nov 2022
Layout approvalFile: Layout 15-11-22-compressed.pdf29 Nov 2022
Building plan approvalFile: D4 Floor Plan-34-compressed.pdf29 Nov 2022
PAN CardFile: PAN Card.pdf29 Nov 2022
Copy of the legal title reportFile: Legal Title Report with Annexure part 1.pdf29 Nov 2022
Copy of the legal title reportFile: Legal Title Report with Annexure part 2.pdf29 Nov 2022
Details of encumbrances concerned to FinanceFile: Declaration for finance Encumbrance D4.pdf29 Nov 2022
Details of encumbrances concerned to FinanceFile: Encrumbrance Certificate for LEGAL TITLE D4.pdf29 Nov 2022
Details of encumbrances concerned to LegalFile: Declaration for finance Encumbrance D4.pdf29 Nov 2022
Details of encumbrances concerned to LegalFile: Encrumbrance Certificate for LEGAL TITLE D4.pdf29 Nov 2022
Copy of Layout Approval (in case of layout)File: Layout 15-11-22-compressed.pdf29 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: D4 Floor Plan-34-compressed.pdf29 Nov 2022
Declaration about Commencement CertificateFile: DECLARATION FOR CC - D4.pdf29 Nov 2022
Declaration in FORM BFile: Form B for D4.pdf29 Nov 2022
CERSAI detailsFile: UNDERTAKING for CERSAI D4.pdf29 Nov 2022
Proforma of Allotment letterFile: Allotment letter draft for D4.pdf29 Nov 2022
Deviation Report with respect to Allotment letterFile: Deviation Report for Allottment Letter.pdf29 Nov 2022

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SkyHigh Towers D4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hinjewadi13,700+ in Pune

Builder: New World Landmark LLP

New World Landmark LLP has 4 registrations on MahaRERA, including Pebbles-HighMont Phase-1 and SkyHigh Towers - D1D2. Its filings disclose 3 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SkyHigh Towers D4 is delayed beyond 30 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SkyHigh Towers D4?

The registered promoter entity is New World Landmark LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SkyHigh Towers D4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SkyHigh Towers D4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SkyHigh Towers D4?

The professionals named in the filing: Architect: VKa architechture; Engineer: Manjiri Desai; Chartered Accountant: SAC & Co LLP; Chartered Accountant: Priyanka Chordiya and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SkyHigh Towers D4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SkyHigh Towers D4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SkyHigh Towers D4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.