SkyHigh Towers D3
RG-MH-86961 · RERA P52100048413 · Last updated on MahaRERA portal: 15 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SkyHigh Towers D3 is a Residential / Group Housing project by New World Landmark LLP in Pune, Maharashtra, registered with MahaRERA as P52100048413 on 3 Jan 2023. Possession is promised by 31 Dec 2027. 84 of the 136 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.
At a glance
Project
- NameSkyHigh Towers D3
- TypeResidential / Group Housing
- Location
- Near Hinewadi Phase II
- Hinjewadi
- Man
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100048413
- ReraGenie IDRG-MH-86961
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Jan 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed105 files
Current status
Figures as on 15 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| D3 | NA | 38 | 34 | 136 | 0 | 136 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 80%.
D3: 53% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 80% |
| Plinth | 100% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 75% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 24% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 47% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed170
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| D3 | NA | Rs 30.00 cr | Rs 16.16 cr |
| - | NA | Rs 3.50 cr | Rs 70.22 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VKa architecture |
| Architect | VK a architecture |
| Engineer | Manjiri Desai |
| Chartered Accountant | SAC & Co LLp |
| Chartered Accountant | Priyanka Chordiya and Associates |
| Partner | Role in project |
|---|---|
| New World Landmark LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Nov 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Dec 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Nov 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed105
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 D3 31032026 sign.pdf | 15 May 2026 |
| Withdrawal Update Form 2File: Form 2 D3 31032026 sign.pdf | 15 May 2026 |
| Withdrawal Update Form 3File: Form 3 AS Sky High D3 30032026 F sign_compressed.pdf | 15 May 2026 |
| Withdrawal Update Form 1File: Form 1 SkyHigh Towers D3 31122025.pdf | 19 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 NWLLLP D3 31122025.pdf | 19 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 AS Sky High D3 31122025 Sign.pdf | 19 Feb 2026 |
| Layout approvalFile: 01-21 - Plot Area and BUA Highlighted.pdf | 29 Dec 2025 |
| Layout approvalFile: 01-21 - Highlighted.pdf | 19 Nov 2025 |
| Layout approvalFile: 02-21.pdf | 19 Nov 2025 |
| Layout approvalFile: 03-21.pdf | 19 Nov 2025 |
| Layout approvalFile: 04-21.pdf | 19 Nov 2025 |
| Layout approvalFile: 05-21.pdf | 19 Nov 2025 |
| Layout approvalFile: 06-21.pdf | 19 Nov 2025 |
| Layout approvalFile: 07-21.pdf | 19 Nov 2025 |
| Building plan approvalFile: 14-21_D3.pdf | 19 Nov 2025 |
| Building plan approvalFile: 15-21_D3.pdf | 19 Nov 2025 |
| Building plan approvalFile: 14-21_D3 - Parking Highlighted.pdf | 19 Nov 2025 |
| Withdrawal Update Form 1File: FORM 1 SKY HIGH TOWERS D3.pdf | 15 Nov 2025 |
| Withdrawal Update Form 1File: FORM 1 SKY HIGH TOWER D3-Sept 2025.pdf | 15 Nov 2025 |
| Withdrawal Update Form 1File: FORM 1 SKY HIGH TOWER D3-Sept 2025.pdf | 15 Nov 2025 |
| Withdrawal Update Form 1File: FORM 1 SKY HIGH TOWER D3-Sept 2025.pdf | 15 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 - Jun 2025.pdf | 15 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 - Jun 2025.pdf | 15 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 - Jun 2025.pdf | 15 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Sky High Tower D3 - Sep 2025.pdf | 15 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 - Jun 2025_compressed (7).pdf | 15 Nov 2025 |
| Withdrawal Update Form 3File: Revised Form 3 AS Sky High D3.pdf | 15 Nov 2025 |
| Withdrawal Update Form 3File: Revised Form 3 AS Sky High D3.pdf | 15 Nov 2025 |
| Withdrawal Update Form 3File: Revised Form 3 AS Sky High D3.pdf | 15 Nov 2025 |
| Withdrawal Update Form 1File: FORM 1 SKY HIGH TOWER D3-Sept 2025.pdf | 11 Nov 2025 |
| Withdrawal Update Form 1File: FORM 1 SKY HIGH TOWERS D3.pdf | 11 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Sky High Tower D3 - Sep 2025.pdf | 11 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 - Jun 2025.pdf | 11 Nov 2025 |
| Withdrawal Update Form 3File: Revised Form 3 AS Sky High D3 06112025 F sign.pdf | 11 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 - Jun 2025_compressed (7).pdf | 11 Nov 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 SkyHigh D3 Mar 2025.pdf | 2 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AS Sky High D3 30032025_compressed.pdf | 2 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 SkyHigh D3 Mar 2025.pdf | 2 May 2025 |
| Disclosure of sold/ booked inventoryFile: SKY High - D3 Wing Inventory till 31032025.pdf | 2 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SkyHigh Towers D3.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 SkyHigh Towers D3 31-12-2024_compressed.pdf | 29 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SkyHigh Towers D3.pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sky High D3.pdf | 29 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 D3.pdf | 12 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Sky High Towers D3 compressed.pdf | 12 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_SkyHigh Towers D3.pdf | 12 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 SkyHigh Towers D3 31-03-2024.pdf | 8 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM_2A_SkyHigh Towers D3.pdf | 13 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_SkyHigh Towers D3.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_SkyHigh Towers D4.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_SkyHigh Towers D3.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2_SkyHigh Towers D4.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 SkyHigh Towers D3 30-06-2024_compressed.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 SkyHigh Towers D4 30-06-2024_compressed.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: d3 q1.pdf | 4 May 2024 |
| Disclosure of sold/ booked inventoryFile: d3 q2.pdf | 4 May 2024 |
| Disclosure of sold/ booked inventoryFile: d3 q3.pdf | 4 May 2024 |
| Disclosure of sold/ booked inventoryFile: d3 q4.pdf | 4 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 D3.pdf | 29 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 D3.pdf | 29 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 SkyHigh Towers D3 31-03-2024_compressed.pdf | 29 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 SKY HIGH TOWER D3.pdf | 24 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Sky High Towers D3.pdf | 24 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AS Sky High D3 31122023-both sign_compressed.pdf | 24 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 SKY HIGH TOWERS D3.pdf | 7 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SkyHigh Towers D3.pdf | 7 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Sky High Towers D3 30092023_compressed.pdf | 7 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AS Skyhigh D3 30062023-both sign_compressed.pdf | 7 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 PC FY 22-23 SkyHigh Towers D3_both sign_compressed.pdf | 7 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SKY HIGH D3 ARCHITECT CERTIFICATE.pdf | 31 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SKY HIGH D3 ENGINEERING CERTIFICATE.pdf | 31 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A SKY HIGH D3 QUALITY ASSURANCE CERTIFICATE.pdf | 31 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Bldg D3 March 2023.pdf | 17 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Skyhigh D 3 March 2023.pdf | 17 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AS Sky High D3 30032023 both sign_compressed.pdf | 17 Jul 2023 |
| Proforma of Agreement for saleFile: 2 Proforma of Agreement to sale.pdf | 27 Jun 2023 |
| Proforma of Agreement for saleFile: 2 Proforma of Agreement to sale.pdf | 24 Jun 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 0_Declaration about AC details D3.pdf | 28 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance updte D3.pdf | 21 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance updte D3.pdf | 21 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 105 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SkyHigh Towers D3 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Hinjewadi13,700+ in Pune
Filed coordinates, straight-line distance. 34 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: New World Landmark LLP
New World Landmark LLP has 4 registrations on MahaRERA, including Pebbles-HighMont Phase-1 and SkyHigh Towers - D1D2. Its filings disclose 3 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SkyHigh Towers D3 is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SkyHigh Towers D3?
The registered promoter entity is New World Landmark LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SkyHigh Towers D3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SkyHigh Towers D3?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SkyHigh Towers D3?
The professionals named in the filing: Architect: VKa architecture; Architect: VK a architecture; Engineer: Manjiri Desai; Chartered Accountant: SAC & Co LLp; Chartered Accountant: Priyanka Chordiya and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SkyHigh Towers D3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback