Home / Browse projects / Pune, Maharashtra / SKY WORLD
SKY WORLD
RG-MH-91049 · RERA P52100052484 · Last updated on MahaRERA portal: 20 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
- 1 complaint at MahaRERA
- Completion date moved by 12 months
- 2 extensions taken
Clear
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SKY WORLD is a Residential / Group Housing project by SIYARAM DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100052484 on 8 Sep 2023. Possession is promised by 31 Oct 2027. The completion date has moved by 12 months from the original filing. 46 of the 115 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameSKY WORLD
- TypeResidential / Group Housing
- Location
- PINK CITY ROAD
- NEAR EURO SCHOOL
- WAKAD
- WAKAD
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100052484
- ReraGenie IDRG-MH-91049
Builder
- NameSIYARAM DEVELOPERS
- Entity typePartnership
- PartnerUDAYSINH ASHOK KADAM
- Authorised PartnersVISHWAJEET SANJAY BHEGADE, YOGESH SUBHASH NALAWADE, VISHAL VISHNU KAPSE
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on8 Sep 2023
- Promised completion31 Oct 2027
- Revised completionRevised to 31 Oct 2027 (originally 18 Oct 2026)
- Buildings2 building records
- Documents filed160 files
Current status
Figures as on 20 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C | NA | 16 | 15 | 56 | 0 | 56 |
| D | NA | 16 | 15 | 59 | 0 | 59 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.
C73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 75% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
D74%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Progress on shared amenities15
As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed162
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| C | 43 | 19 | 62 |
| D | 81 | 19 | 100 |
Land and ownership7
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| DNYANESHWAR VITTHAL KALATE | Wakad | Pune |
| SANJAY VITTHAL KALATE | Wakad | Pune |
| NALINI VINAYAK KALATE | Wakad | Pune |
| SHRINIWAS SURESH KALATE | Wakad | Pune |
| SURESH EKNATH KALATE | Wakad | Pune |
| KHANDU EKNATH KALATE | Wakad | Pune |
| VITTHAL NARAYAN KALATE | Wakad | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| C | NA | Rs 19.50 cr | Rs 20.96 cr |
| D | NA | Rs 19.50 cr | Rs 20.96 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | IP ASSOCIATES |
| Engineer | AMOL NIRMAL |
| Engineer | PARAG CHOPADA |
| Chartered Accountant | ARTI JAIN |
| Chartered Accountant | PANKAJ PATIL |
| Chartered Accountant | Manatu Kumbhar |
| Chartered Accountant | NPSR & ASSOCIATES |
| Partner | Role in project |
|---|---|
| SIYARAM DEVELOPERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterNA
Reason as filed by the promoterThe project has substantially progressed in accordance with the sanctioned plans. However, completion of the project within the original registration period was not possible due to delays in obtaining the Revised Sanction Plan and the consequential statutory approvals, which were beyond the control of the Promoter. 1. Delay in Approval of Revised Sanction Plan The revised building proposal remained pending before the Competent Planning Authority for a considerable period. As the execution of the balance construction activities was dependent upon the revised sanction, the project completion sch
Litigation declared1
| Case | Court | Status |
|---|---|---|
| Special Civil Suit No 68 of 2024/2024 | Honorable Civil Court Pune | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12400392 | Subhan Rajaram Kalate | SIYARAM DEVELOPERS | 11/10/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Nov 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Oct 2027
Documents filed160
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 160 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: form 1.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: form 2.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: form 3.pdf | 20 Jul 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A SIYARAM DEVELOPERS 25-26_compressed.pdf | 5 Jun 2026 |
| Form 5 (FY 2025-2026)File: Form 5 siyaram developers 2025-26 final.pdf | 4 May 2026 |
| Withdrawal Update Form 1File: FORM 1 final.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2_final.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: FINAL FORM 3.pdf | 20 Apr 2026 |
| Form 2A (FY 2024-2025)File: FORM 2A F Y 24 25 SIYARAM DEV UPLOAD_ (1).pdf | 17 Apr 2026 |
| Form 5 (FY 2024-2025)File: New SCAN Form 5 (SIYARAM DEVELOPERS ) F Y 24 25.pdf | 12 Feb 2026 |
| Withdrawal Update Form 1File: form 1 final.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 3rd Q Oct-Dec Sky World (1).pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: form 2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: form 2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: form 3 final.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Siyaram Form 3_11zon.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: Form 2_11zon.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 18 Oct 2025 |
| Withdrawal Update Form 1File: SKYWORLD FORM 1.pdf | 19 Jul 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 19 Jul 2025 |
| Withdrawal Update Form 3File: Sky world (form 3).pdf | 19 Jul 2025 |
| Form 2A (FY 2023-2024)File: FORM 2A SIYARAM DEVELOPERS.pdf | 5 Jul 2025 |
| Form 5 (FY 2023-2024)File: Siyaram Developers 23 24 FORM 5 final.pdf | 4 Jul 2025 |
| Form 1File: Form 1 06-01-24 - SEP 23.pdf | 23 Jun 2025 |
| Form 2File: SEP 23 FORM 2.pdf | 23 Jun 2025 |
| Form 3File: Siyaram_Q2 form 3_compressed.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: All sold unsold shops history - Copy.pdf | 23 Jun 2025 |
| Form 1File: Form 1 06-01-24 - OCT TO DEC 23.pdf | 23 Jun 2025 |
| Form 2File: DEC 23 FORM 2.pdf | 23 Jun 2025 |
| Form 3File: Siyaram_Dev FORM 3_compressed.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DETAILS.pdf | 23 Jun 2025 |
| Form 1File: FORM 1_11zon.pdf | 23 Jun 2025 |
| Form 2File: ENGINEERS ASSOCIATES.pdf | 23 Jun 2025 |
| Form 3File: FORM 3 SIYARAM DEVELOPERS_11zon.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD Booking update in Rera.pdf | 23 Jun 2025 |
| Form 1File: form 1.pdf | 23 Jun 2025 |
| Form 2File: 2 SKY WORLD.pdf | 23 Jun 2025 |
| Form 3File: 3 siyaram developers SKY WORLD_updated.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Rera update inventory dt 20272024 sold.pdf | 23 Jun 2025 |
| Form 1File: form 1 Sky world Architect Report dt July 24 to Sep 24.pdf | 23 Jun 2025 |
| Form 2File: form 2.pdf | 23 Jun 2025 |
| Form 3File: FORM 3 siyaram developmers_compressed.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold.pdf | 23 Jun 2025 |
| Form 1File: FORM 1 N.pdf | 23 Jun 2025 |
| Form 2File: FORM 2.pdf | 23 Jun 2025 |
| Form 3File: FORM 3 RESIZE 1.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold Inventory Report Edit.pdf | 23 Jun 2025 |
| Form 1File: form 1 Jan To March 2025 Architect.pdf | 23 Jun 2025 |
| Form 2File: sky world form 2.pdf | 23 Jun 2025 |
| Form 3File: Sky World Form 3.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventary.pdf | 23 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Jan To March 2025 Architect_11zon.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sky World Form 3_11zon.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: sky world form 2.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventary.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 N.pdf | 16 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 RESIZE.pdf | 16 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 RESIZE 1.pdf | 16 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 16 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: sold Inventory Report Edit.pdf | 16 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Siyaram Developers 23 24 FORM 5 COPY.pdf | 24 Dec 2024 |
| Layout approvalFile: 1.pdf | 15 Nov 2024 |
| Layout approvalFile: 2.pdf | 15 Nov 2024 |
| Layout approvalFile: 3.pdf | 15 Nov 2024 |
| Layout approvalFile: 4.pdf | 15 Nov 2024 |
| Layout approvalFile: 5.pdf | 15 Nov 2024 |
| Layout approvalFile: 6.pdf | 15 Nov 2024 |
| Layout approvalFile: 7.pdf | 15 Nov 2024 |
| Layout approvalFile: 8.pdf | 15 Nov 2024 |
| Layout approvalFile: 9.pdf | 15 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: 2.pdf | 15 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: 3.pdf | 15 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: 4.pdf | 15 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: 5.pdf | 15 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: 6.pdf | 15 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: 7.pdf | 15 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: 8.pdf | 15 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: 9.pdf | 15 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: 1.pdf | 15 Nov 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 160 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SKY WORLD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near WAKAD13,700+ in Pune
Filed coordinates, straight-line distance. 244 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: SIYARAM DEVELOPERS
SIYARAM DEVELOPERS has 2 registrations on MahaRERA, including SKY WORLD and PUSHP INDU HERITAGE. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SKY WORLD is delayed beyond 31 Oct 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SKY WORLD?
The registered promoter entity is SIYARAM DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SKY WORLD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SKY WORLD?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SKY WORLD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SKY WORLD?
The professionals named in the filing: Architect: IP ASSOCIATES; Engineer: AMOL NIRMAL; Engineer: PARAG CHOPADA; Chartered Accountant: ARTI JAIN; Chartered Accountant: PANKAJ PATIL; Chartered Accountant: Manatu Kumbhar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SKY WORLD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback