Home / Browse projects / Thane, Maharashtra / SKY GALAXY BLDG NO 1

Registered No litigation declared Residential / Group Housing project

SKY GALAXY BLDG NO 1

By ATREE DEVELOPERS

RG-MH-07077 · RERA P51700054404 · Last updated on MahaRERA portal: 1 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Installation of Lifts, 90%
32 of 90Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

SKY GALAXY BLDG NO 1 is a Residential / Group Housing project by ATREE DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700054404 on 19 Jan 2024. Possession is promised by 31 Dec 2026. 58 of the 90 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameSKY GALAXY BLDG NO 1
  • TypeResidential / Group Housing
  • Location
    • S. NO. 71
    • H. NO. 1
    • YERANJAD
    • BADLAPUR WEST
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700054404
  • ReraGenie IDRG-MH-07077

Builder

  • NameATREE DEVELOPERS
  • Entity typePartnership
  • PartnersDHAVALKUMAR PRAHALADBHAI PATEL, RAJESH KHIMJI CHOPDA, KISHAN SHANTILAL CHOPDA, RAJESH KESHAVLAL PATEL, VIPUL AMBALAL PATEL, KAILAS BABAN MHASKAR
  • Other registrations1 more →

Key dates

this monthRegisteredJan 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Jan 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Current status

64%58 of 90 units booked
95.9%Work done, per cost certificate

Figures as on 1 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SKY GALAXY BLDG NO 1NA87702090

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.

SKY GALAXY BLDG NO 1: 72% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 1 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes20%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed108

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots108
Open Space108

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,800 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Aug 2025

Approvals and building plan

Sanctioning authorityKulgaon Badlapur nagarparishad
Permissible FSI9500.0
Proposed, not sanctioned3,500 sq m
Buildings approved3
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBADLAPUR EAST
Estimated costRs 8.80 cr
Cost incurredRs 8.44 cr
Work done95.91%
BuildingWingEstimatedIncurred
SKY GALAXY BLDG NO 1NARs 7.60 crRs 7.60 cr
-NARs 1.20 crRs 84.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSamarthya Engineers
EngineerAadhar Engineers
Chartered AccountantPatel Senghani and Parvadiya
Chartered AccountantR D Patel & Co
PartnerRole in project
ATREE DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Bldg No 1_FORM 1_Q4.pdf1 May 2026
Withdrawal Update Form 2File: Bldg No 1_FORM 2_Q4.pdf1 May 2026
Withdrawal Update Form 3File: Atree Developers BLDG 1_Form 3_Q4_FY 2025-26.pdf1 May 2026
Form 1File: FORM 1.pdf7 Feb 2026
Form 2File: FORM 2.pdf7 Feb 2026
Form 3File: Atree Developers_Form 3_FY24-25_Q4.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: ATREE_Sold Unsold Invetory_Q4_24-25.pdf7 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf7 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf7 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf7 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf7 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf7 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf7 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf7 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf7 Feb 2026
Withdrawal Update Form 3File: Atree Developers_Form 3_FY25-26_Q1.pdf7 Feb 2026
Withdrawal Update Form 3File: ATREE_Sold Unsold Invetory_Q2_25-26.pdf7 Feb 2026
Withdrawal Update Form 3File: Atree Developers_Form 3_FY 25-26_Q2.pdf7 Feb 2026
Withdrawal Update Form 3File: Atree Developers_Form 3_FY 25-26_Q3 C.pdf7 Feb 2026
Form 1File: FORM 1.pdf15 Dec 2025
Form 2File: FORM 2.pdf15 Dec 2025
Form 3File: FORM 3 - Sky Galaxy_24-25_Q3.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: ATREE_Sold Unsold Invetory_Q3_24-25.pdf15 Dec 2025
Form 1File: FORM 1.pdf15 Dec 2025
Form 2File: FORM 2.pdf15 Dec 2025
Form 3File: FORM 3 - Sky Galaxy_24-25_Q2.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: ATREE_Sold Unsold Invetory_Q2_24-25.pdf15 Dec 2025
Form 1File: FORM 1.pdf15 Dec 2025
Form 2File: FORM 2.pdf15 Dec 2025
Form 3File: FORM 3 - Sky Galaxy_24-25_Q1.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf15 Dec 2025
Form 5 (FY 2023-2024)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)-2.pdf15 Dec 2025
Form 5 (FY 2024-2025)File: Atree Developer Bldg no 1_Form 5_24-25.pdf30 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf13 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf13 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Sky Galaxy_24-25_Q1_Sign.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Sky Galaxy_24-25_Q2_Sign.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Sky Galaxy_24-25_Q3_Sign.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf13 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf13 Mar 2025
Disclosure of sold/ booked inventoryFile: ATREE_Sold Unsold Invetory_Q2_24-25.pdf13 Mar 2025
Disclosure of sold/ booked inventoryFile: ATREE_Sold Unsold Invetory_Q3_24-25.pdf13 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 _AUDIT_Atree_23-24.pdf13 Dec 2024
Proforma of Agreement for saleFile: New DRAFT Agreement 260324.pdf26 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A_2-1-24_merged_compressed.pdf18 Jan 2024
Proforma of Allotment letterFile: allotment letter sky galaxy atree developpers updated.pdf21 Dec 2023
Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment letter sky galaxy.pdf21 Dec 2023
Other - LegalFile: Recon Deed_Atree Devlop.pdf21 Dec 2023
Other - TechnicalFile: E-mail.pdf21 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Atree Form 3.pdf1 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format-A_Bank Declaration.pdf1 Dec 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Letter Finance_new.pdf30 Nov 2023
Details of encumbrances concerned to LegalFile: Encumbrance Letter Finance_new.pdf30 Nov 2023
Other - LegalFile: Conveyance Deed Baban Meher_compressed.pdf30 Nov 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Letter Finace.pdf11 Nov 2023
Details of encumbrances concerned to LegalFile: Encumbrance Letter Finace.pdf11 Nov 2023
Declaration about Commencement CertificateFile: declaration about commencement certificate.pdf11 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf11 Nov 2023
Disclosure of sold/ booked inventoryFile: sold unsold inventory.pdf11 Nov 2023
CERSAI detailsFile: declaration on cersai.pdf11 Nov 2023
Deviation Report with respect to model copy of AgreementFile: agreement_merged.pdf11 Nov 2023
Layout approvalFile: Bldg Layout_compressed (1).pdf10 Nov 2023
Building plan approvalFile: Bldg Plan_compressed.pdf10 Nov 2023
PAN CardFile: Pan (1).pdf10 Nov 2023
Copy of the legal title reportFile: Legal Title Report_compressed.pdf10 Nov 2023
Copy of Layout Approval (in case of layout)File: Bldg Layout_compressed (1).pdf10 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Bldg Plan_compressed.pdf10 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Copy_15-09-23_compressed.pdf10 Nov 2023
Declaration in FORM BFile: Form B - Atree.pdf10 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-02.pdf10 Nov 2023
Proforma of Agreement for saleFile: Agreement For Sale - Draft.pdf10 Nov 2023

How this compares with Thane

64%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SKY GALAXY BLDG NO 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BADLAPUR WEST7,600+ in Thane

Builder: ATREE DEVELOPERS

ATREE DEVELOPERS has 2 registrations on MahaRERA, including SKY GALAXY BLDG NO 1 and SKY GALAXY BLDG NO 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SKY GALAXY BLDG NO 1 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SKY GALAXY BLDG NO 1?

The registered promoter entity is ATREE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SKY GALAXY BLDG NO 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SKY GALAXY BLDG NO 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SKY GALAXY BLDG NO 1?

The professionals named in the filing: Architect: Samarthya Engineers; Engineer: Aadhar Engineers; Chartered Accountant: Patel Senghani and Parvadiya; Chartered Accountant: R D Patel & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SKY GALAXY BLDG NO 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SKY GALAXY BLDG NO 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SKY GALAXY BLDG NO 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.