ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / SKY FLORA

Registered No litigation declared Others project

SKY FLORA

By SKY CITY DEVELOPERS

RG-MH-18145 · RERA P52000076893 · Last updated on MahaRERA portal: 16 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 74%
64 of 80Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

SKY FLORA is a Others project by SKY CITY DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000076893 on 3 Jul 2024. Possession is promised by 31 Dec 2027. 16 of the 80 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameSKY FLORA
  • TypeOthers
  • Location
    • PLOT NO 72A SECTOR 55
    • DRONAGIRI
    • Bokadvira
    • Uran
    • Raigarh
    • 400702
  • Pincode400702
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000076893
  • ReraGenie IDRG-MH-18145

Builder

  • NameSKY CITY DEVELOPERS
  • Entity typePartnership
  • PartnersBHARAT SAVAJIBHAI KOTADIA, KAJAL BHAVESH UMARETIYA, MANISH VITHALBHAI HIRANI, RASILA BHARAT KOTADIA, UMESHBHAI JINABHAI CHOVATIYA
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jul 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed60 files

Current status

20%16 of 80 units booked
53.5%Work done, per cost certificate

Figures as on 16 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING-ANA88331447
WING-BNA8033033

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 74%.

WING-A52%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks74%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.64%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.18%
WING-B52%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks74%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.64%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.18%

Progress on shared amenities15

As on 16 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
WING-A11
WING-B11

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,050 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Jul 2025

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI4099.94
Proposed, not sanctioned4,100 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSECTOR 15 BELAPUR NAVI NUNBAI 400614
Estimated costRs 9.15 cr
Cost incurredRs 4.90 cr
Work done53.55%
BuildingWingEstimatedIncurred
WING-ANARs 4.58 crRs 2.45 cr
WING-BNARs 4.58 crRs 2.45 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATUL PATEL ARCHITECTS
EngineerB S SUKHTANKAR & ASSOCIATES
EngineerSC Engineers and Consultants
Chartered AccountantKANKOTIYA & CO
Chartered AccountantParas Kankotiya
Chartered AccountantArun Borad & Co.
PartnerRole in project
SKY CITY DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 72A-55-DRONAGIRI RERA (2026 MARCH).pdf16 Apr 2026
Withdrawal Update Form 2File: 72A-55 Form 2 Mar26.pdf16 Apr 2026
Withdrawal Update Form 3File: FORM -3 - CA- SKY FLORA MAR 26 - signed.pdf16 Apr 2026
Form 2A (FY 2025-2026)File: SCD SkyFlora Form2A Mar26.pdf2 Apr 2026
Withdrawal Update Form 1File: FORM - 1 - SKY FLORA - SEPT 25 - SIGNED.pdf12 Jan 2026
Withdrawal Update Form 2File: Sky Flora Form 2 8-1-26.pdf12 Jan 2026
Withdrawal Update Form 3File: FORM-3 CA - SKY FLORA SIGNED - DEC 25.pdf12 Jan 2026
Withdrawal Update Form 1File: FORM - 1 - SKY FLORA - SEPT 25 - SIGNED.pdf14 Oct 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 (3).pdf14 Oct 2025
Withdrawal Update Form 3File: FORM - 3 SKY FLORA - SEPT 25_compressed.pdf14 Oct 2025
Withdrawal Update Form 1File: Form 1 Sky Flora june 2025.pdf19 Jul 2025
Withdrawal Update Form 2File: 72A Form 2 14-7-25.pdf19 Jul 2025
Withdrawal Update Form 3File: Form 3 Sky Flora jun 2025.pdf19 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A (1).pdf19 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 72A Form 2 19-04-2025.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MAR 25.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 FORM 3 CA SKY FLORA CA MARCH 25 SIGNED.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD MAR 25.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 72A Form 2 15-1-25.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 -P 72 - ARCHITECT DEC 24.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA - SKY FLORA SIGNED_compressed.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: SALES INVENTORY FOR RERA - P-72A-55 31-12-2024_compressed.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 -P 72 - ARCHITECT.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 -P 72 - ENGINEER.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD P - 72.pdf19 Oct 2024
Other - LegalFile: Tripartite Agreement - P-72A_compressed.pdf13 Jun 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbrances 72A.pdf12 Jun 2024
Details of encumbrances concerned to LegalFile: Legal Encumbrances 72A.pdf12 Jun 2024
Other - LegalFile: Lease Agreemt Plot - 72A-55_compressed.pdf24 May 2024
Other - LegalFile: Tripartite Agreement plot -72A_compressed.pdf24 May 2024
Other - TechnicalFile: 72A Undertaking.pdf24 May 2024
Layout approvalFile: 72A-CC DRG-1_compressed.pdf9 May 2024
Building plan approvalFile: 72A-CC DRG-1_compressed.pdf9 May 2024
Building plan approvalFile: 72A-CC DRG-2.pdf9 May 2024
Building plan approvalFile: 72A-CC DRG-3.pdf9 May 2024
PAN CardFile: SKY CITY PANCARD.pdf9 May 2024
Copy of the legal title reportFile: 1 Copy of the legal title report (1) (1).pdf9 May 2024
Copy of Layout Approval (in case of layout)File: 72A-CC DRG-1_compressed.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 72A-CC DRG-1_compressed.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 72A-CC DRG-2.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 72A-CC DRG-3.pdf9 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGR CERTIFICATE _compressed.pdf9 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE REVISED_compressed.pdf9 May 2024
Proforma of Allotment letterFile: LETTER OF ALLOTMENT - RERA ACT.pdf9 May 2024
Proforma of Agreement for saleFile: AgreementForSale_SkyFlora.pdf9 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION ESCROW ACCT.pdf9 May 2024
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT - LTR OF ALLOTMENT.pdf9 May 2024
Deviation Report with respect to model copy of AgreementFile: 72A AFS Deviation Report1.pdf9 May 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD UNIT .pdf6 May 2024
CERSAI detailsFile: new CERSAI_Search_Report_200306577857_For_Asset_Based_Search_14_05_2024_16_02_09_817.pdf6 May 2024
Details of encumbrances concerned to FinanceFile: 1 a ENCUMBRANCE LTR - FINANCE.pdf3 May 2024
Details of encumbrances concerned to LegalFile: 1 a ENCUMBRANCE LTR - FINANCE.pdf3 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - PLOT -72A-55.pdf3 May 2024
Declaration about Commencement CertificateFile: 72A Declaration.pdf3 May 2024
Declaration in FORM BFile: FORM B AFFIDAVIT CUM DECLARATION - PLOT -72A.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Plot 72A.pdf3 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: D O I - MANISH .pdf3 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf3 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INT - UMESH .pdf3 May 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SKY CORRALP52000003181Bokadvira, Raigarh20Aug 2017CompletedMar 2019Late, May 2019

How this compares with Raigarh

20%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SKY FLORA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DRONAGIRI5,900+ in Raigarh

2 kmSKY FLORACompleted 43Lapsed / revoked 16Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 101 registered projects within 2 km.

Builder: SKY CITY DEVELOPERS

SKY CITY DEVELOPERS has 4 registrations on MahaRERA, including MAJESTIC VILLA and SKY CORRAL. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SKY FLORA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SKY FLORA?

The registered promoter entity is SKY CITY DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SKY FLORA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SKY FLORA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SKY FLORA?

The professionals named in the filing: Architect: ATUL PATEL ARCHITECTS; Engineer: B S SUKHTANKAR & ASSOCIATES; Engineer: SC Engineers and Consultants; Chartered Accountant: KANKOTIYA & CO; Chartered Accountant: Paras Kankotiya; Chartered Accountant: Arun Borad & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SKY FLORA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SKY FLORA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SKY FLORA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.