Home / Browse projects / Thane, Maharashtra / SKY AVENUE WING - A AND B

Registration lapsed No litigation declared Residential / Group Housing project

SKY AVENUE WING - A AND B

By SEVENHILL GROUP

RG-MH-02863 · RERA P51700019995 · Last updated on MahaRERA portal: 9 Dec 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 25 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2024Possession promised25 months past this date
19 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 95%
0Complaints at MahaRERAon this registration
Jump to the 47 documents Report an error

SKY AVENUE WING - A AND B is a Residential / Group Housing project by SEVENHILL GROUP in Thane, Maharashtra, registered with MahaRERA as P51700019995 on 15 Mar 2019. Possession was promised by 30 Sep 2024 and is now 25 months past that date.

At a glance

Project

  • NameSKY AVENUE WING - A AND B
  • TypeResidential / Group Housing
  • Location
    • GUT NO 148/1 & 148/2
    • VALIVALI
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700019995
  • ReraGenie IDRG-MH-02863

Builder

  • NameSEVENHILL GROUP
  • Entity typePartnership
  • PartnersSANJAYKUMAR DINESHBHAI PATEL, DHAVALKUMAR PRAHALADBHAI PATEL, NARENDRA TULSIDAS PATEL, RAJESHBHAI PRAHALADBHAI PATEL, RAJESH KHIMJI CHOPDA, HARDIK MANHARBHAI PATEL, KIRITKUMAR RANCHHODBHAI PATEL, SANJAY NARSINHBHAI PATEL, JIGNESH DAHYABHAI PATEL, RAHUL HASMUKHBHAI PATEL

Key dates

25 months past promisethis monthRegisteredMar 2019PromisedSep 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 Mar 2019
  • Promised completion30 Sep 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed47 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SKY AVENUE - WING ANA80000
SKY AVENUE - WING BNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 9 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 95%.

SKY AVENUE - WING A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SKY AVENUE - WING B90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 9 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership12

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners12
LandownerVillageDistrict
SOMNATH TUKARAM MHASKARBadlapur (M Cl)Thane
LATA RAVINDRA BHOIRBadlapur (M Cl)Thane
BHASKAR TUKARAM MHASKARBadlapur (M Cl)Thane
NANDUBAI RAMESH DANGAREBadlapur (M Cl)Thane
NARAYAN KALU MHASKARBadlapur (M Cl)Thane
JANARDAN KALU MHASKARBadlapur (M Cl)Thane
RAMESH KALU MHASKARBadlapur (M Cl)Thane
ASHMITA AAMBO RANEBadlapur (M Cl)Thane
SUNANDA PRAHALAD BADEBadlapur (M Cl)Thane
SUVARNA SANTOSH MHASKARBadlapur (M Cl)Thane
ASHWINI TUKARAM MHASKARBadlapur (M Cl)Thane
SUSHILA TUKARAM MHASKARBadlapur (M Cl)Thane

Approvals and building plan

Permissible FSI5992.61
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSECTOR 21 NEAR SHILP CHOWK KHARGHAR

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR K KHAMBAYAT PARTNER OF RAJ ASSOCIATES
EngineerK R PATEL & ASSOCIATES
Chartered AccountantR D PATEL & ASSOCIATES
Chartered AccountantPATEL SENGHANI AND PARVADIYA
PartnerRole in project
SEVENHILL GROUP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Mar 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Mar 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed47

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 _AUDIT_SHG_23-24.pdf9 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1_compressed (1).pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Seven Hill Sold Unsold Inventory_compressed.pdf20 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SEVEN HILL FORM 1.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold_Unsold_Inventory_SHG_compressed.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Firm 5_Seven Hill Group .pdf29 Sep 2023
Other - TechnicalFile: land Owner Account Details.pdf18 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf20 Oct 2022
Disclosure of sold/ booked inventoryFile: Seven Hill_Sold Unsold_Q2_com.pdf20 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_SHG_21-22.pdf30 Sep 2022
Annual Audit Report of Statutory CA (Form 5)File: Form 5 _AUDIT_SHG_21-22.pdf29 Sep 2022
Annual Audit Report of Statutory CA (Form 5)File: Form 5_SHG_21-22.pdf29 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1_compressed.pdf7 Jan 2022
CERSAI detailsFile: Declaration of CERSAI SHG.pdf7 Jan 2022
Disclosure of sold/ booked inventoryFile: SHG Sold Unsold Inventory_compressed.pdf7 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SHG 2A (1).pdf13 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1_compressed.pdf7 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: SHG 2A.pdf7 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SHG 2A (1).pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: Seven hill group .pdf7 Oct 2021
Certificates of CA (Form 3)File: Form 3SHG.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SHG - Form 5.pdf30 Sep 2021
Declaration about Commencement CertificateFile: Seven Hill Group _C C Declaration.pdf15 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_compressed.pdf15 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Seven hill Group.pdf15 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 7 Hill Group.pdf15 Aug 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold Seven hill group .pdf15 Aug 2021
Certificates of CA (Form 3)File: Sevenhill Group Form 3 signed and stamped.pdf15 Aug 2021
Certificates of CA (Form 3)File: Sevenhill Group Form 3 signed and stamped.pdf15 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Seven hill Group.pdf9 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form-5_SHG_19-20.pdf9 Oct 2020
Annual Audit Report of Statutory CA (Form 5)File: Seven hill Group.pdf30 Sep 2019
Declaration in FORM BFile: 7 Hill_Form B.pdf12 Mar 2019
Certificates of CA (Form 3)File: Form 3_CA CertificatE.pdf12 Mar 2019
Building plan approvalFile: Building 1 - Plan_rotated.pdf11 Mar 2019
Building plan approvalFile: Building 2 - Plan_rotated.pdf11 Mar 2019
Layout approvalFile: Building Layout_rotated.pdf11 Mar 2019
PAN CardFile: Seven Hill Group_PAN.pdf11 Mar 2019
Copy of the legal title reportFile: Title certificate.pdf11 Mar 2019
Details of encumbrancesFile: SHG_NON ENCUMBRANCES CERTIFICATE.pdf11 Mar 2019
Copy of Layout Approval (in case of layout)File: Building Layout_rotated.pdf11 Mar 2019
Building Plan Approval (IOD)File: Building 1 - Plan_rotated.pdf11 Mar 2019
Building Plan Approval (IOD)File: Building 2 - Plan_rotated.pdf11 Mar 2019
Commencement Certificates / NA Order for plotted developmentFile: CC copy.pdf11 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Architect Certificate_New.pdf11 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer's Certificate.pdf11 Mar 2019
Proforma of Allotment letterFile: RERA_AGREEMENT FOR SALE.pdf11 Mar 2019

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SKY AVENUE WING - A AND B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VALIVALI7,600+ in Thane

Builder: SEVENHILL GROUP

SEVENHILL GROUP has 1 registration on MahaRERA, including SKY AVENUE WING - A AND B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that SKY AVENUE WING - A AND B shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SKY AVENUE WING - A AND B is delayed beyond 30 Sep 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SKY AVENUE WING - A AND B?

The registered promoter entity is SEVENHILL GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SKY AVENUE WING - A AND B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SKY AVENUE WING - A AND B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SKY AVENUE WING - A AND B?

The professionals named in the filing: Architect: R K KHAMBAYAT PARTNER OF RAJ ASSOCIATES; Engineer: K R PATEL & ASSOCIATES; Chartered Accountant: R D PATEL & ASSOCIATES; Chartered Accountant: PATEL SENGHANI AND PARVADIYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SKY AVENUE WING - A AND B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SKY AVENUE WING - A AND B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SKY AVENUE WING - A AND B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.