ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / SIYARA BUSINESS PARK

Registered No litigation declared Commercial project

SIYARA BUSINESS PARK

By SIYARA REALTY PRIVATE LIMITED

RG-MH-32726 · RERA P51700080413 · Last updated on MahaRERA portal: 3 Sep 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 80%
160 of 182Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

SIYARA BUSINESS PARK is a Commercial project by SIYARA REALTY PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700080413 on 2 Jun 2025. Possession is promised by 31 Dec 2029. 22 of the 182 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameSIYARA BUSINESS PARK
  • TypeCommercial
  • Location
    • Kaneri
    • Bhiwandi (M Corp.)
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700080413
  • ReraGenie IDRG-MH-32726

Builder

  • NameSIYARA REALTY PRIVATE LIMITED
  • Entity typeCompany
  • CINU41001MH2023PTC404661
  • GSTIN27ABLCS0457Q1ZL
  • DirectorsKAPIL PUNJALAL PATEL, RAJESH PUNJALAL PATEL
  • Other registrations3 more →

Key dates

this monthRegisteredJun 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Jun 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed57 files

Current status

12%22 of 182 units booked
7.5%Work done, per cost certificate

Figures as on 3 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SIYARA BUSINESS PARKNA770182182

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 80%.

SIYARA BUSINESS PARK: 12% average across the applicable activities

ActivityProgress
Excavation80%
Basement (if any)20%
Podiums (if any)0%
Plinth30%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed237

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots237
Closed/Covered237

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,695 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Jul 2025
LandownerVillageDistrict
Ashok Properties (Bhiwandi project)Mumbai CityMumbai City

Approvals and building plan

Sanctioning authorityBhiwandi-Nizampur Municipal Corporation
Permissible FSI20129.11
Proposed, not sanctioned20,129 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGR FLOOR SHOP NO 49 50 51 52 VARDHAMAN VATIKA CHS LTD KOLSHET RD THANE WEST
Estimated costRs 47.00 cr
Cost incurredRs 3.52 cr
Work done7.5%
BuildingWingEstimatedIncurred
SIYARA BUSINESS PARKNARs 46.30 crRs 3.52 cr
-NARs 70.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVISIONARY VANGUARD ARCHITECTS
EngineerASCON AARNA STRUCTURAL CONSULTANTS
EngineerS K STRUCTURAL ENGINEERING
Chartered AccountantN D CHHEDA & ASSOCIATES
PartnerRole in project
SIYARA REALTY PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM_2A_Siyara Business Park_Signed.pdf3 Sep 2026
Withdrawal Update Form 1File: Form_1_Siyara Business Park_Q1_FY 26-27_Signed.pdf13 Aug 2026
Withdrawal Update Form 2File: Form_2_Siyara Business Park_Q1_FY 2026-27_Signed.pdf13 Aug 2026
Withdrawal Update Form 3File: Form 3_Siyara Business Park_Q1_FY 2026-27_Signed_Compress.pdf13 Aug 2026
Withdrawal Update Form 1File: FORM_1_Siyara Business Park_Q4_FY 2025-26_Signed.pdf20 May 2026
Withdrawal Update Form 2File: FORM_2_Siyara Business Park_Q4_FY 2025-26_Signed.pdf20 May 2026
Withdrawal Update Form 3File: Form3_Siyara Business Park_Q4_Fy2025-26_Signed.pdf20 May 2026
Withdrawal Update Form 1File: Form_1_Siyara Business Park_Q3_FY 2025-26_Signed.pdf21 Feb 2026
Withdrawal Update Form 2File: FORM_2_SIYARA BUSINESS PARK_Q3_FY 2025-26_signed.pdf21 Feb 2026
Withdrawal Update Form 3File: FORM_3_SIYARA BUSINESS PARK_Q3_FY 2025-26_signed.pdf21 Feb 2026
Withdrawal Update Form 1File: FORM_1_Siyara_Business_Park_Q2_FY_2025-26_signed.pdf25 Nov 2025
Withdrawal Update Form 2File: FORM_2_Siyara_Business_Park_Q2_FY_2025-26_signed.pdf25 Nov 2025
Withdrawal Update Form 3File: Form 3_Siyara Business Park_Q2_FY 25-26_Signed.pdf25 Nov 2025
Withdrawal Update Form 1File: Form 1_Siyara Business Park_Q1_FY 2025-26_signed.pdf13 Aug 2025
Withdrawal Update Form 2File: Form2_Siyara_Business_Park_Q1_FY 2025-26_signed.pdf13 Aug 2025
Withdrawal Update Form 3File: Form_3_Siyara_Business_Park_Q1_2025-26_Signed.pdf13 Aug 2025
Other - FinanceFile: Notarised Joint Declaration Ashok Properties Siyara.pdf21 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Siyara Business park_Signed.pdf3 Apr 2025
Other - LegalFile: MAIL CC TO MAHARERA.pdf3 Apr 2025
Other - FinanceFile: Clarification of non disclosure Landowner Units _Siyara_Business_Park.pdf3 Apr 2025
Copy of the legal title reportFile: Legal Title Report_Siyara Business Park.pdf2 Apr 2025
Layout approvalFile: Layout Plan Page_1_compressed.pdf8 Mar 2025
Layout approvalFile: Demarcated Plan copy_compressed_page-0001_compressed.pdf8 Mar 2025
Building plan approvalFile: Ground Floor Siyara Business Park Plan_Page 10-min_compressed.pdf8 Mar 2025
Building plan approvalFile: 1st Floor Siyara Business Park Plan_Page 11-min.pdf8 Mar 2025
Building plan approvalFile: 2nd Floor Siyara Business Park Plan_Page 12-min.pdf8 Mar 2025
Building plan approvalFile: 3rd Floor Siyara Business Park Plan_Page 13-min.pdf8 Mar 2025
Building plan approvalFile: 4th Floor Siyara Business Park Plan_Page 14-min.pdf8 Mar 2025
Building plan approvalFile: 5th Floor Siyara Business Park Plan_Page 15-min.pdf8 Mar 2025
Details of encumbrances concerned to FinanceFile: Declaration in respect of Finance_Encumbrances_Siyara Business Park-2.pdf8 Mar 2025
Details of encumbrances concerned to FinanceFile: Decalaration in respect of Legal_Encumbrance_Siyara Business park.pdf8 Mar 2025
Copy of Layout Approval (in case of layout)File: Layout Plan Page_1_compressed.pdf8 Mar 2025
Copy of Layout Approval (in case of layout)File: Demarcated Plan copy_compressed_page-0001_compressed.pdf8 Mar 2025
Proforma of Allotment letterFile: Revised_ALLOTMENT LETTER_Siyara Business Park_.pdf8 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Revised Architech Certificate_Siyara Business Park.pdf8 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 4th Floor Siyara Business Park Plan_Page 14-min.pdf8 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 5th Floor Siyara Business Park Plan_Page 15-min.pdf8 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 3rd Floor Siyara Business Park Plan_Page 13-min.pdf8 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 1st Floor Siyara Business Park Plan_Page 11-min.pdf8 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Ground Floor Siyara Business Park Plan_Page 10-min_compressed.pdf8 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 2nd Floor Siyara Business Park Plan_Page 12-min.pdf8 Mar 2025
Deviation Report with respect to Allotment letterFile: Deviation with respect to Allotment Letter_Siyara Business Park.pdf8 Mar 2025
Details of encumbrances concerned to LegalFile: Decalaration in respect of Legal_Encumbrance_Siyara Business park.pdf8 Mar 2025
Details of encumbrances concerned to LegalFile: Declaration in respect of Finance_Encumbrances_Siyara Business Park-2.pdf8 Mar 2025
Other - TechnicalFile: Annexure_A order No 50_Siyara Business Park-2.pdf8 Mar 2025
Deviation Report with respect to model copy of AgreementFile: Deviation with respect to Model Copy of Agreement_Siyara Business Park.pdf8 Mar 2025
Proforma of Agreement for saleFile: Revised AFS_Siyara Business Park.pdf8 Mar 2025
Declaration in FORM BFile: FORM B_Developer Declaration_Siyara Business Park.pdf5 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer Certificate_Siyara Busines Park.pdf5 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Revised CC Certificate_Ashok Nagar.pdf5 Mar 2025
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate_Siyara Business Park.pdf5 Mar 2025
CERSAI detailsFile: Cersai Declaration_Siyara Business Park.pdf5 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format_A_Siyara_Business_Park.pdf5 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A-Interest of director in other Real Estate Organisation.pdf5 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format_B_Siyara_Business_Park_RERA.pdf5 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured-Unsecured finance_Siyara Business Park.pdf5 Mar 2025
PAN CardFile: Pan Card_Siyara Realty Pvt Ltd.pdf6 Jul 2024

How this compares with Thane

12%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIYARA BUSINESS PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kaneri7,600+ in Thane

2 kmSIYARA BUSINESS PARKCompleted 20Lapsed / revoked 23Other 31Dot size: filed unitsN

Filed coordinates, straight-line distance. 74 registered projects within 2 km.

Builder: SIYARA REALTY PRIVATE LIMITED

SIYARA REALTY PRIVATE LIMITED has 4 registrations on MahaRERA, including SIYARA AVENUE and AVANTIKA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SIYARA BUSINESS PARK is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIYARA BUSINESS PARK?

The registered promoter entity is SIYARA REALTY PRIVATE LIMITED, a company as per the filing. Its CIN U41001MH2023PTC404661 and GSTIN 27ABLCS0457Q1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIYARA BUSINESS PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SIYARA BUSINESS PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIYARA BUSINESS PARK?

The professionals named in the filing: Architect: VISIONARY VANGUARD ARCHITECTS; Engineer: ASCON AARNA STRUCTURAL CONSULTANTS; Engineer: S K STRUCTURAL ENGINEERING; Chartered Accountant: N D CHHEDA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIYARA BUSINESS PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIYARA BUSINESS PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIYARA BUSINESS PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.