Home / Browse projects / Thane, Maharashtra / SIYARA BUSINESS PARK
SIYARA BUSINESS PARK
By SIYARA REALTY PRIVATE LIMITED
RG-MH-32726 · RERA P51700080413 · Last updated on MahaRERA portal: 3 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SIYARA BUSINESS PARK is a Commercial project by SIYARA REALTY PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700080413 on 2 Jun 2025. Possession is promised by 31 Dec 2029. 22 of the 182 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.
At a glance
Project
- NameSIYARA BUSINESS PARK
- TypeCommercial
- Location
- Kaneri
- Bhiwandi (M Corp.)
- Bhiwandi
- Thane
- 421302
- Pincode421302
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700080413
- ReraGenie IDRG-MH-32726
Builder
- NameSIYARA REALTY PRIVATE LIMITED
- Entity typeCompany
- CINU41001MH2023PTC404661
- GSTIN27ABLCS0457Q1ZL
- DirectorsKAPIL PUNJALAL PATEL, RAJESH PUNJALAL PATEL
- Other registrations3 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Jun 2025
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings1 building record
- Documents filed57 files
Current status
Figures as on 3 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SIYARA BUSINESS PARK | NA | 7 | 7 | 0 | 182 | 182 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 80%.
SIYARA BUSINESS PARK: 12% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 20% |
| Podiums (if any) | 0% |
| Plinth | 30% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 3 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed237
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Ashok Properties (Bhiwandi project) | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SIYARA BUSINESS PARK | NA | Rs 46.30 cr | Rs 3.52 cr |
| - | NA | Rs 70.00 lakh | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VISIONARY VANGUARD ARCHITECTS |
| Engineer | ASCON AARNA STRUCTURAL CONSULTANTS |
| Engineer | S K STRUCTURAL ENGINEERING |
| Chartered Accountant | N D CHHEDA & ASSOCIATES |
| Partner | Role in project |
|---|---|
| SIYARA REALTY PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Apr 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Mar 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed57
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: FORM_2A_Siyara Business Park_Signed.pdf | 3 Sep 2026 |
| Withdrawal Update Form 1File: Form_1_Siyara Business Park_Q1_FY 26-27_Signed.pdf | 13 Aug 2026 |
| Withdrawal Update Form 2File: Form_2_Siyara Business Park_Q1_FY 2026-27_Signed.pdf | 13 Aug 2026 |
| Withdrawal Update Form 3File: Form 3_Siyara Business Park_Q1_FY 2026-27_Signed_Compress.pdf | 13 Aug 2026 |
| Withdrawal Update Form 1File: FORM_1_Siyara Business Park_Q4_FY 2025-26_Signed.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: FORM_2_Siyara Business Park_Q4_FY 2025-26_Signed.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Form3_Siyara Business Park_Q4_Fy2025-26_Signed.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form_1_Siyara Business Park_Q3_FY 2025-26_Signed.pdf | 21 Feb 2026 |
| Withdrawal Update Form 2File: FORM_2_SIYARA BUSINESS PARK_Q3_FY 2025-26_signed.pdf | 21 Feb 2026 |
| Withdrawal Update Form 3File: FORM_3_SIYARA BUSINESS PARK_Q3_FY 2025-26_signed.pdf | 21 Feb 2026 |
| Withdrawal Update Form 1File: FORM_1_Siyara_Business_Park_Q2_FY_2025-26_signed.pdf | 25 Nov 2025 |
| Withdrawal Update Form 2File: FORM_2_Siyara_Business_Park_Q2_FY_2025-26_signed.pdf | 25 Nov 2025 |
| Withdrawal Update Form 3File: Form 3_Siyara Business Park_Q2_FY 25-26_Signed.pdf | 25 Nov 2025 |
| Withdrawal Update Form 1File: Form 1_Siyara Business Park_Q1_FY 2025-26_signed.pdf | 13 Aug 2025 |
| Withdrawal Update Form 2File: Form2_Siyara_Business_Park_Q1_FY 2025-26_signed.pdf | 13 Aug 2025 |
| Withdrawal Update Form 3File: Form_3_Siyara_Business_Park_Q1_2025-26_Signed.pdf | 13 Aug 2025 |
| Other - FinanceFile: Notarised Joint Declaration Ashok Properties Siyara.pdf | 21 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Siyara Business park_Signed.pdf | 3 Apr 2025 |
| Other - LegalFile: MAIL CC TO MAHARERA.pdf | 3 Apr 2025 |
| Other - FinanceFile: Clarification of non disclosure Landowner Units _Siyara_Business_Park.pdf | 3 Apr 2025 |
| Copy of the legal title reportFile: Legal Title Report_Siyara Business Park.pdf | 2 Apr 2025 |
| Layout approvalFile: Layout Plan Page_1_compressed.pdf | 8 Mar 2025 |
| Layout approvalFile: Demarcated Plan copy_compressed_page-0001_compressed.pdf | 8 Mar 2025 |
| Building plan approvalFile: Ground Floor Siyara Business Park Plan_Page 10-min_compressed.pdf | 8 Mar 2025 |
| Building plan approvalFile: 1st Floor Siyara Business Park Plan_Page 11-min.pdf | 8 Mar 2025 |
| Building plan approvalFile: 2nd Floor Siyara Business Park Plan_Page 12-min.pdf | 8 Mar 2025 |
| Building plan approvalFile: 3rd Floor Siyara Business Park Plan_Page 13-min.pdf | 8 Mar 2025 |
| Building plan approvalFile: 4th Floor Siyara Business Park Plan_Page 14-min.pdf | 8 Mar 2025 |
| Building plan approvalFile: 5th Floor Siyara Business Park Plan_Page 15-min.pdf | 8 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: Declaration in respect of Finance_Encumbrances_Siyara Business Park-2.pdf | 8 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: Decalaration in respect of Legal_Encumbrance_Siyara Business park.pdf | 8 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: Layout Plan Page_1_compressed.pdf | 8 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: Demarcated Plan copy_compressed_page-0001_compressed.pdf | 8 Mar 2025 |
| Proforma of Allotment letterFile: Revised_ALLOTMENT LETTER_Siyara Business Park_.pdf | 8 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Revised Architech Certificate_Siyara Business Park.pdf | 8 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 4th Floor Siyara Business Park Plan_Page 14-min.pdf | 8 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 5th Floor Siyara Business Park Plan_Page 15-min.pdf | 8 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 3rd Floor Siyara Business Park Plan_Page 13-min.pdf | 8 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 1st Floor Siyara Business Park Plan_Page 11-min.pdf | 8 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Ground Floor Siyara Business Park Plan_Page 10-min_compressed.pdf | 8 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2nd Floor Siyara Business Park Plan_Page 12-min.pdf | 8 Mar 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation with respect to Allotment Letter_Siyara Business Park.pdf | 8 Mar 2025 |
| Details of encumbrances concerned to LegalFile: Decalaration in respect of Legal_Encumbrance_Siyara Business park.pdf | 8 Mar 2025 |
| Details of encumbrances concerned to LegalFile: Declaration in respect of Finance_Encumbrances_Siyara Business Park-2.pdf | 8 Mar 2025 |
| Other - TechnicalFile: Annexure_A order No 50_Siyara Business Park-2.pdf | 8 Mar 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation with respect to Model Copy of Agreement_Siyara Business Park.pdf | 8 Mar 2025 |
| Proforma of Agreement for saleFile: Revised AFS_Siyara Business Park.pdf | 8 Mar 2025 |
| Declaration in FORM BFile: FORM B_Developer Declaration_Siyara Business Park.pdf | 5 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer Certificate_Siyara Busines Park.pdf | 5 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised CC Certificate_Ashok Nagar.pdf | 5 Mar 2025 |
| Declaration about Commencement CertificateFile: Declaration About Commencement Certificate_Siyara Business Park.pdf | 5 Mar 2025 |
| CERSAI detailsFile: Cersai Declaration_Siyara Business Park.pdf | 5 Mar 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format_A_Siyara_Business_Park.pdf | 5 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A-Interest of director in other Real Estate Organisation.pdf | 5 Mar 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format_B_Siyara_Business_Park_RERA.pdf | 5 Mar 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured-Unsecured finance_Siyara Business Park.pdf | 5 Mar 2025 |
| PAN CardFile: Pan Card_Siyara Realty Pvt Ltd.pdf | 6 Jul 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 57 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SIYARA BUSINESS PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kaneri7,600+ in Thane
Filed coordinates, straight-line distance. 74 registered projects within 2 km.
GODREJ UPAVAN
PRAKHHYAT DWELLINGS LLP
DGT - Sector 3A - Cluster 2 - Phase 1
ADRIKA DEVELOPERS PRIVATE LIMITED
DOSTI GREATER THANE - PHASE 1
ADRIKA DEVELOPERS PRIVATE LIMITED
Dosti Greater Thane - Sector 3A - Cluster 1B -
ADRIKA DEVELOPERS PRIVATE LIMITED
USHA RESIDENCY
SHREE BUDHDEV INFRA
NARAYANI DHAM BUILDING NO 2A AND 2B
MAYA DEVELOPER
See every Thane project, with the district possession charts
Builder: SIYARA REALTY PRIVATE LIMITED
SIYARA REALTY PRIVATE LIMITED has 4 registrations on MahaRERA, including SIYARA AVENUE and AVANTIKA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if SIYARA BUSINESS PARK is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SIYARA BUSINESS PARK?
The registered promoter entity is SIYARA REALTY PRIVATE LIMITED, a company as per the filing. Its CIN U41001MH2023PTC404661 and GSTIN 27ABLCS0457Q1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SIYARA BUSINESS PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SIYARA BUSINESS PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SIYARA BUSINESS PARK?
The professionals named in the filing: Architect: VISIONARY VANGUARD ARCHITECTS; Engineer: ASCON AARNA STRUCTURAL CONSULTANTS; Engineer: S K STRUCTURAL ENGINEERING; Chartered Accountant: N D CHHEDA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SIYARA BUSINESS PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback