Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
7 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 95%
431 of 620Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

SIYARA AVENUE is a Others project by SIYARA REALTY PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700076976 on 10 Jul 2024. Possession is promised by 31 Mar 2029. 189 of the 620 units on this registration are recorded sold or booked, and 7 of 33 construction stages are filed complete.

At a glance

Project

  • NameSIYARA AVENUE
  • TypeOthers
  • Location
    • KANERI
    • Bhiwandi (M Corp.)
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • RERA no.P51700076976
  • ReraGenie IDRG-MH-18486

Builder

  • NameSIYARA REALTY PRIVATE LIMITED
  • Entity typeCompany
  • CINU41001MH2023PTC404661
  • GSTIN27ABLCS0457Q1ZL
  • DirectorsKAPIL PUNJALAL PATEL, RAJESH PUNJALAL PATEL
  • Other registrations3 more →

Key dates

this monthRegisteredJul 2024PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Jul 2024
  • Promised completion31 Mar 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed59 files

Current status

30%189 of 620 units booked
26.1%Work done, per cost certificate

Figures as on 20 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SIYARA AVENUE ANA252316413177
SIYARA AVENUE BNA252324818266
SIYARA AVENUE CNA252316413177

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 20 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 95%.

SIYARA AVENUE A38%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor40%
Slabs of Super Structure58%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises18%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks4%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SIYARA AVENUE B39%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor40%
Slabs of Super Structure62%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises18%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks4%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SIYARA AVENUE C19%
ActivityProgress
Excavation100%
Basement (if any)95%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure12%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed359

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots359
Closed/Covered267
Open Space92
BuildingClosed/CoveredOpen SpaceTotal
SIYARA AVENUE A7626102
SIYARA AVENUE B11540155
SIYARA AVENUE C7626102

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,736 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Jun 2025
LandownerVillageDistrict
ASHOKPROPERTIES (BHIWANDI PROJECT)Mumbai CityMumbai City

Approvals and building plan

Sanctioning authorityBhiwandi-Nizampur Municipal Corporation
Permissible FSI43298.35
Proposed, not sanctioned43,298 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchROAD NO 22 DIST THANE MAHARASHTRA 400604
Estimated costRs 126.14 cr
Cost incurredRs 32.91 cr
Work done26.09%
BuildingWingEstimatedIncurred
SIYARA AVENUE BNARs 50.17 crRs 15.19 cr
SIYARA AVENUE ANARs 37.63 crRs 11.39 cr
SIYARA AVENUE CNARs 37.63 crRs 6.33 cr
-NARs 70.00 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVISIONARY VANGUARD ARCHITECTS
EngineerASCON AARNA STRUCTURAL CONSULTANTS
EngineerS K STRUCTURAL ENGINEERING
Chartered AccountantN D CHHEDA and Associates
Chartered AccountantNakrani and Co
PartnerRole in project
SIYARA REALTY PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form_1_Siyara Avenue_Q1_FY 26-27_Signed.pdf20 Aug 2026
Withdrawal Update Form 2File: Form_2_Siyara Avenue_Q1_FY 26-27_Signed.pdf20 Aug 2026
Withdrawal Update Form 3File: Form 3_Siyara Avenue_Q1_FY 2026-27_SIGNED_Compress.pdf20 Aug 2026
Form 2A (FY 2025-2026)File: FORM_2A_SIYARA AVENUE_FY 2025-26_Signed.pdf31 Jul 2026
Withdrawal Update Form 1File: FORM_1_Siyara Avenue_Q4_FY 2026-26_Signed.pdf1 Jun 2026
Withdrawal Update Form 2File: FORM_2_Siyara Avenue_Q4_FY 2026-26_Signed.pdf1 Jun 2026
Withdrawal Update Form 3File: FORM_3_Siyara Avenue_Q4 FY 2025-26_Signed.pdf1 Jun 2026
Withdrawal Update Form 1File: Form_1_Siyara Avenue_Q3_FY 2025-26_signed.pdf2 Mar 2026
Withdrawal Update Form 2File: Form_2_Siyara Avenue_Q3_FY 2025-26_signed.pdf2 Mar 2026
Withdrawal Update Form 3File: Form_3_Siyara Avenue_Q3_FY 2025-26_signed_compressed.pdf2 Mar 2026
Form 2A (FY 2024-2025)File: FORM_2A_SIYARA AVENUE_FY 2024-25_Signed.pdf17 Dec 2025
Withdrawal Update Form 1File: Form_1_Siyara_Avenue_Q2_FY_2025-26_signed.pdf13 Dec 2025
Withdrawal Update Form 2File: Form_2_Siyara_Avenue_Q2_FY 2025-26_SIgned.pdf13 Dec 2025
Withdrawal Update Form 3File: Form 3_Siyara Avenue_Q2_FY 2025-26_Signed.pdf13 Dec 2025
Form 1File: SIYARA_AVENUE_FORM1_Q4_2024-25.pdf22 Aug 2025
Form 2File: SIYARA_AVENUE_FORM2_Q4_2024-25.pdf22 Aug 2025
Form 3File: Form 3_Siyara Avenue-Mar 25_Signed.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: SIYARA_AVENUE_SOLD_UNSOLD_2024-25_Q4.pdf22 Aug 2025
Withdrawal Update Form 1File: Form_1_Siyara_Avenue_Q1_FY 2025-26_Signed.pdf22 Aug 2025
Withdrawal Update Form 2File: Form_2_Siyara Avenue_Q1_FY 2025-26_Signed.pdf22 Aug 2025
Withdrawal Update Form 3File: Form_3_Siyara_Avenue_Q1_FY 2025-26_signed.pdf22 Aug 2025
Form 5 (FY 2024-2025)File: Form 5_Siyara Avenue_FY 24-25_System Generated Signed.pdf30 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SIYARA_AVENUE_FORM1_Q4_2024-25.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Siyara Avenue-Mar 25_Signed.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SIYARA_AVENUE_FORM2_Q4_2024-25.pdf7 May 2025
Disclosure of sold/ booked inventoryFile: SIYARA_AVENUE_SOLD_UNSOLD_2024-25_Q4.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I- Siyara Avenue_Building A and B_Dec 24.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Siyara Avenue-Dec 24_Signed.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II_Siyara Avenue_Building A and B_Dec 24.pdf31 Jan 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A_Declaration about RERA Designated Bank Accounts for real estate proiects.pdf16 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B_Bank Details confirmation V1.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q2 FY 2024-25.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Avenue_Q2_24-25_Signed.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engneering Certificate Q2 FY 2024-25.pdf26 Oct 2024
Copy of the legal title reportFile: Legal Title Report_Siyara Avenue 29-06-2024.pdf29 Jun 2024
Details of encumbrances concerned to FinanceFile: DECLARATION IN RESPECT OF FINANCE ENCUMBRANCES_SIYARA AVENUE.pdf29 Jun 2024
Details of encumbrances concerned to LegalFile: DECLARATION IN RESPECT OF FINANCE ENCUMBRANCES_SIYARA AVENUE.pdf29 Jun 2024
Proforma of Agreement for saleFile: 29062024 AFS SIYARA AVENUE.pdf29 Jun 2024
Proforma of Allotment letterFile: 29062024 AVENUE ALLOTMENT LETTER.pdf29 Jun 2024
Other - TechnicalFile: MAIL CC TO MAHARERA.pdf29 Jun 2024
Building plan approvalFile: Building Plan_SIYARA AVENUE.pdf17 Jun 2024
Details of encumbrances concerned to FinanceFile: Declaration of No Legal Encumbrance_Avenue.pdf17 Jun 2024
Details of encumbrances concerned to LegalFile: Declaration of No Legal Encumbrance_Avenue.pdf17 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_SIYARA AVENUE.pdf17 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Copy_Ashok Nagar.pdf17 Jun 2024
Declaration about Commencement CertificateFile: Declaration about commencement cetificate_Siyara Avenue.pdf17 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM II_Siyara Avenue [A,B,C].pdf17 Jun 2024
CERSAI detailsFile: Declaration About Non Applicabilty of Cersai_Siyara Avenue.pdf17 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Siyara Avenue.pdf17 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: INTEREST IN OTHER ORGANIZATION.pdf17 Jun 2024
Other - LegalFile: Annexure A- Avenue.pdf17 Jun 2024
Layout approvalFile: Demarked Layout Plan Siyara Avenue_compressed.pdf13 Jun 2024
PAN CardFile: Pan Card_Siyara Realty Pvt Ltd.pdf13 Jun 2024
Copy of Layout Approval (in case of layout)File: Demarked Layout Plan Siyara Avenue_compressed.pdf13 Jun 2024
Declaration in FORM BFile: Form B Siyara Avenue [Developer].pdf13 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I Siyara Avenue.pdf13 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration About Separate Bank Account for real estate Projects_avenue.pdf13 Jun 2024
Deviation Report with respect to Allotment letterFile: Deviation to Allotment Letter_Siyara Realty.pdf13 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation_Model Copy of Agreement_Siyara Avenue.pdf13 Jun 2024

How this compares with Thane

30%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIYARA AVENUE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KANERI7,600+ in Thane

Builder: SIYARA REALTY PRIVATE LIMITED

SIYARA REALTY PRIVATE LIMITED has 4 registrations on MahaRERA, including SIYARA AVENUE and AVANTIKA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SIYARA AVENUE is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIYARA AVENUE?

The registered promoter entity is SIYARA REALTY PRIVATE LIMITED, a company as per the filing. Its CIN U41001MH2023PTC404661 and GSTIN 27ABLCS0457Q1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIYARA AVENUE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SIYARA AVENUE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIYARA AVENUE?

The professionals named in the filing: Architect: VISIONARY VANGUARD ARCHITECTS; Engineer: ASCON AARNA STRUCTURAL CONSULTANTS; Engineer: S K STRUCTURAL ENGINEERING; Chartered Accountant: N D CHHEDA and Associates; Chartered Accountant: Nakrani and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIYARA AVENUE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIYARA AVENUE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIYARA AVENUE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.