Home / Browse projects / Pune, Maharashtra / SINGH CHS

Registered No litigation declared Residential / Group Housing project

SINGH CHS

By CHAPHALKAR KARANDIKAR DEVELOPERS

RG-MH-23718 · RERA P52100079030 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 10%
24 of 30Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

SINGH CHS is a Residential / Group Housing project by CHAPHALKAR KARANDIKAR DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100079030 on 31 Jan 2025. Possession is promised by 31 Dec 2028. 6 of the 30 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameSINGH CHS
  • TypeResidential / Group Housing
  • Location
    • HARE KRISHNA MANDIR PATH
    • MODEL COLONY
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411016
  • Pincode411016
  • RERA no.P52100079030
  • ReraGenie IDRG-MH-23718

Builder

  • NameCHAPHALKAR KARANDIKAR DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAOFC8877F2ZS
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersRishikesh Arvind Chaphalkar, GAURAV DNYANDAS CHAPHALKAR, SHRINIVAS DNYANDAS CHAPHALKAR, PUSHKARAJ ARVIND CHAPHALKAR, VIKRAM VILAS KARANDIKAR, TEJAS VILAS KARANDIKAR
  • Other registrations9 more →
  • Completed2 of 10
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects14 →

Key dates

this monthRegisteredJan 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jan 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Current status

20%6 of 30 units booked

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SINGH CHSNA11730030

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 10%.

SINGH CHS: 1% average across the applicable activities

ActivityProgress
Excavation10%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered1
Open Space15

Land and ownership7

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area998 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
LandownerVillageDistrict
SINGH CHSPune (M Corp.)Pune
RISHIKESH CHAPHALKARPune (M Corp.)Pune
PUSHKAR CHAPHALKARPune (M Corp.)Pune
GAURAV CHAPHALKARPune (M Corp.)Pune
SHRINIVAS CHAPHALKARPune (M Corp.)Pune
VIKRAM KARANDIKARPune (M Corp.)Pune
TEJAS KARANDIKARPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI5824.0
Proposed, not sanctioned2,231 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDECCAN GYMKHANA PUNE 411004

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Chartered AccountantJPNR & Associates
Chartered AccountantKhire Khandekar and Kirloskar
PartnerRole in project
CHAPHALKAR KARANDIKAR DEVELOPERS-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
SM12600136Ram GawaliCHAPHALKAR KARANDIKAR DEVELOPERS11/02/2026
SM12600137Ram GawaliCHAPHALKAR KARANDIKAR DEVELOPERS11/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Singh CHS Q4 March 26.pdf30 Apr 2026
Form 2File: Form 2 Singh CHS Q4 March 26.pdf30 Apr 2026
Form 3File: Form-3 Singh CHS Q4 March 26.pdf30 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Singh CHS Q4 March 26.pdf30 Apr 2026
Form 1File: FORM 1- Architect certificate001.pdf7 Feb 2026
Form 2File: FORM 2- Engineering certificate001.pdf7 Feb 2026
Form 3File: FORM 3- CA certificate001.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: disclouser of sold and unsold inventory001.pdf7 Feb 2026
Form 1File: Form 1- Sing001.pdf6 Nov 2025
Form 2File: Form 2- Sing001.pdf6 Nov 2025
Form 3File: Form 3- Sing CHS001.pdf6 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold inventory.pdf6 Nov 2025
Form 5 (FY 2024-2025)File: Form 5- Sing001.pdf24 Oct 2025
Form 1File: Sing Society Form 1.pdf4 Aug 2025
Form 2File: Singh CHS (Prakash) Form 2 _30062025.pdf4 Aug 2025
Form 3File: Form 3 Singh CHS Q1_compressed.pdf4 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sing CHS.pdf4 Aug 2025
Building plan approvalFile: 1-5.pdf23 Feb 2025
Building plan approvalFile: 2-5.pdf23 Feb 2025
Building plan approvalFile: 3-5.pdf23 Feb 2025
Building plan approvalFile: 4-5.pdf23 Feb 2025
Building plan approvalFile: 5-5.pdf23 Feb 2025
Building plan approvalFile: 1-5.pdf23 Feb 2025
Building plan approvalFile: 2-5.pdf23 Feb 2025
Building plan approvalFile: 3-5.pdf23 Feb 2025
Building plan approvalFile: 4-5.pdf23 Feb 2025
Building plan approvalFile: 5-5.pdf23 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: CC 30 Jan 2025.pdf23 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 1-5.pdf23 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 2-5.pdf23 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 3-5.pdf23 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 4-5.pdf23 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 5-5.pdf23 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: CC 30 Jan 2025.pdf23 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 1-5.pdf23 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 2-5.pdf23 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 3-5.pdf23 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 4-5.pdf23 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 5-5.pdf23 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A BANK AC OPEN PRAKASH.pdf24 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B FOR BANK AC OPEN PRAKASH.pdf24 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: Promoter Undertaking FORMAT B.pdf24 Jan 2025
Other - LegalFile: Declaration Cum Undertaking Singh CHSL.pdf16 Jan 2025
Other - FinanceFile: Declaration Cum Undertaking Singh CHSL.pdf16 Jan 2025
Proforma of Agreement for saleFile: ATS PRAKASH.pdf16 Jan 2025
Building plan approvalFile: PLAN 2.pdf8 Jan 2025
Layout approvalFile: PLAN 1.pdf8 Jan 2025
PAN CardFile: 2 PAN CARD .PDF8 Jan 2025
Copy of the legal title reportFile: Search Title Report PRAKASH.pdf8 Jan 2025
Details of encumbrances concerned to FinanceFile: NON ENCUMBRANCES LEGAL.pdf8 Jan 2025
Details of encumbrances concerned to FinanceFile: NON ENCUMBRANCES FINANCIAL.pdf8 Jan 2025
Copy of Layout Approval (in case of layout)File: PLAN 1.pdf8 Jan 2025
Proforma of Allotment letterFile: Allotment Letter PRAKASH.pdf8 Jan 2025
Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION FORM B Developer.pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM 1.pdf8 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf8 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate PRAKASH.pdf8 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN 2.pdf8 Jan 2025
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf8 Jan 2025
CERSAI detailsFile: CERSAI_Search_Report_200333984459_For_Asset_Based_Search_02_01_2025_15_11_12_727.pdf8 Jan 2025
CERSAI detailsFile: CERSAI PROMOTER.pdf8 Jan 2025
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT LETTER.pdf8 Jan 2025
Details of encumbrances concerned to LegalFile: NON ENCUMBRANCES LEGAL.pdf8 Jan 2025
Details of encumbrances concerned to LegalFile: NON ENCUMBRANCES FINANCIAL.pdf8 Jan 2025
Other - TechnicalFile: ANNEXURE A DECLARATION CUM UNDERTAKING.pdf8 Jan 2025
Deviation Report with respect to model copy of AgreementFile: DEVIATION AGREEMENT TO SALE.pdf8 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Order No 39 Previous RERA Experience Gaurav.pdf8 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Order No 39 Previous RERA Experience Pushkar.pdf8 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Order No 39 Previous RERA Experience Shrinivas.pdf8 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Order No 39 Previous RERA Experience Tejas.pdf8 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Order No 39 Previous RERA Experience Vikram.pdf8 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Order No 39 Previous RERA Experience Rishikesh.pdf8 Jan 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ASHOKBAN485A MODEL COLONY SHIVAJINAGAR PUNE 41101630CompletedJun 2023Jun 2023

How this compares with Pune

20%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SINGH CHS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MODEL COLONY13,700+ in Pune

Builder: CHAPHALKAR KARANDIKAR DEVELOPERS

CHAPHALKAR KARANDIKAR DEVELOPERS has 10 registrations on MahaRERA, including ASHOKBAN and SHASHI APARTMENTS. Its filings disclose 14 earlier MahaRERA projects: declares 8 of 9 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SINGH CHS is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SINGH CHS?

The registered promoter entity is CHAPHALKAR KARANDIKAR DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAOFC8877F2ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SINGH CHS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SINGH CHS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SINGH CHS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SINGH CHS?

The professionals named in the filing: Chartered Accountant: JPNR & Associates; Chartered Accountant: Khire Khandekar and Kirloskar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SINGH CHS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SINGH CHS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SINGH CHS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.