Home / Browse projects / Mumbai Suburban, Maharashtra / Silver Springs
Silver Springs
RG-MH-21064 · RERA P51800009204 · Last updated on MahaRERA portal: 14 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 72 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Silver Springs is a Residential / Group Housing project by Shrikrishna Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800009204 on 22 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 72 months from the original filing.
At a glance
Project
- NameSilver Springs
- TypeResidential / Group Housing
- Location
- Maharashtra
- Mumbai
- Andheri
- Mumbai Suburban
- 400069
- Pincode400069
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800009204
- ReraGenie IDRG-MH-21064
Builder
- NameShrikrishna Developers
- Entity typePartnership
- PartnerAnil M Prabhu
- Other registrations4 more →
- Completed1 of 5
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Aug 2017
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2021)
- Buildings1 building record
- Documents filed90 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Silver Springs | NA | 13 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.
Silver Springs: 87% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities16
As on 14 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 10% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 80% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| Garden Parking Camera installation fabrication etc | Yes | 50% |
Parking filed39
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Arch View Associates |
| Engineer | Vinay Singh |
| Engineer | MR DIMPLE A BHAVSAR |
| Chartered Accountant | Sinha Purohit & Associate |
| Partner | Role in project |
|---|---|
| Shrikrishna Developers | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to delay in receipt of eligible slum dwellers and its impact on sale component and revised CC/LOI issued by SRA on the basis of DCR 2034 and due to covid period and in sale component (B-Wing) only 3 units are sold out who have given consent for extension.
Reason as filed by the promoterDue to a legal case filed by a tenant, the construction stalled during 2017-2019 until final order released by court in 2019. Due to this, the project finances affected severely along with the impact on sales further impacting the fund for self sustenance. We were struggling to raise funds earlier. Our existing buyers are aware of the scenario and are supportive in the matter hence provided the consent. We are expecting to complete the project in the coming year.
Reason as filed by the promoterdelayed in obtaining MCGM approvals, shortage of labor
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 28 Jan 2025
Documents filed90
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 31-12-2025.pdf | 14 Feb 2026 |
| Form 2File: FORM 2 SKD RERA.pdf | 14 Feb 2026 |
| Form 3File: FROM-3.pdf | 14 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: RERA SOLD INVENTORY (1).pdf | 14 Feb 2026 |
| Form 1File: Form 1 31-12-2025.pdf | 14 Feb 2026 |
| Form 2File: FORM 2 SKD RERA.pdf | 14 Feb 2026 |
| Form 3File: FROM-3.pdf | 14 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: RERA SOLD INVENTORY (1).pdf | 14 Feb 2026 |
| Form 1File: Form 1 31-12-2025.pdf | 14 Feb 2026 |
| Form 2File: FORM 2 SKD RERA.pdf | 14 Feb 2026 |
| Form 3File: FROM-3.pdf | 14 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: RERA SOLD INVENTORY (1).pdf | 14 Feb 2026 |
| Declaration in FORM BFile: Form-B_500Stamp.pdf | 10 Mar 2025 |
| Other - TechnicalFile: Declaration on compliance fullfilment.pdf | 16 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 ACCOUNTANT CERTIFICATE FY 2022-23.pdf | 16 Feb 2025 |
| Certificates of CA (Form 3)File: Form-3 Rectified inventory with rehab units.pdf | 28 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 0_FULL_OC_OF_REHAB_WING_A_SKD_24-09-2021.pdf | 28 Jan 2025 |
| Other - TechnicalFile: Clarification on the inventory mismatch.pdf | 28 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 ACCOUNTANT CERTIFICATE FY 2023-24.pdf | 25 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECTS CERTIFICATE.pdf | 21 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE.pdf | 21 Jan 2025 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE_FORMAT D.pdf | 21 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A ENGINEERS CERTIFICATE.pdf | 21 Jan 2025 |
| Declaration in FORM BFile: Form-B.pdf | 26 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1.pdf | 26 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked Inventory.pdf | 26 Dec 2024 |
| Other - TechnicalFile: Pert Chart.pdf | 26 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3 FY 2023-2024.pdf | 24 May 2024 |
| Declaration in FORM BFile: FORM 3 FY 2022-2023 SHRIKRISHNA DEVELOPERS SILVER SPRINGS.pdf | 16 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf | 16 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 2022-23.pdf | 21 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 2A FY 2022-23.pdf | 21 Nov 2023 |
| Other - FinanceFile: FINANCE.pdf | 21 Nov 2023 |
| Other - TechnicalFile: TECHNICAL.pdf | 21 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Esate Organizations.pdf | 1 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration Encumbrance concerned to Legal.pdf | 31 Jul 2023 |
| Details of encumbrances concerned to LegalFile: Declaration Encumbrance concerned to Legal.pdf | 31 Jul 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Separate Bank Account.pdf | 31 Jul 2023 |
| Building plan approvalFile: AMENDED IOD.pdf | 29 Jul 2023 |
| Layout approvalFile: LAYOUT APPROVED PLAN.pdf | 29 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: LAYOUT APPROVED PLAN.pdf | 29 Jul 2023 |
| Building Plan Approval (IOD)File: AMENDED IOD.pdf | 29 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: FURTHER CC.pdf | 29 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ANNEXURE A.pdf | 9 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER'S CERTIFICATE FY 2021-22.pdf | 9 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Engineer's Certificate on Quality Assurance FY 2021-22.pdf | 9 Mar 2023 |
| Certificates of CA (Form 3)File: FORM 3 FY 2021-22.pdf | 9 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 FY 2021-22.pdf | 9 Mar 2023 |
| Proforma of Agreement for saleFile: Proforma of Agreement For Sale.pdf | 9 Mar 2023 |
| OtherFile: Application for Extension.pdf | 9 Apr 2022 |
| OtherFile: LETTER FOR DATE EXTENSION.pdf | 9 Apr 2022 |
| OtherFile: 28_FRESH CONSENT.pdf | 9 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: disclosure of Sold Booked Inventory.pdf | 7 Apr 2022 |
| Declaration about Commencement CertificateFile: 32_Declaration about CC.pdf | 2 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: 29_10_Disclosure of Sold AND Booked Inventory_B wing.pdf | 2 Apr 2022 |
| OtherFile: Application_reply_to_Email.pdf | 2 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1 - Form 5 - 2018-2019_compressed.pdf | 30 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2 - Form 5 - 2019-2020_compressed.pdf | 30 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - 2020-2021_compressed.pdf | 30 Mar 2022 |
| Building plan approvalFile: Amended Plan IOD.pdf | 17 Mar 2022 |
| Layout approvalFile: LAYOUT PLAN.pdf | 17 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf | 17 Mar 2022 |
| Building Plan Approval (IOD)File: Amended Plan IOD.pdf | 17 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 17 Mar 2022 |
| Declaration about Commencement CertificateFile: RERA_DECLARATION_CC.pdf | 17 Mar 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2_ENGINEERS CERTIFICATE.pdf | 17 Mar 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A_Engineer's Quality Assurance Certificate.pdf | 17 Mar 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A_Engineer's Quality Assurance Certificate.pdf | 17 Mar 2022 |
| Disclosure of sold/ booked inventoryFile: Declaration of Sold Booked Inventory.pdf | 17 Mar 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200232754140_For_Asset_Based_Search_17_03_2022_18_01_19_934.pdf | 17 Mar 2022 |
| Certificates of CA (Form 3)File: CA CERTIFICATE.pdf | 17 Mar 2022 |
| Proforma of Allotment letterFile: RERA AGREEMENT.pdf | 17 Mar 2022 |
| OtherFile: REVISED LOI.pdf | 17 Mar 2022 |
| Certificates of CA (Form 5)File: FORM 5_15-10-18.pdf | 16 Oct 2018 |
| Layout approvalFile: Layout.pdf | 7 Sep 2017 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 7 Sep 2017 |
| Layout approvalFile: CA.pdf | 27 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: CA.pdf | 27 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2_ENGINEER.pdf | 27 Jul 2017 |
| Certificates of CA (Form 3)File: CA.pdf | 27 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 90 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Silver Springs on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mumbai6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 205 registered projects within 2 km.
Nityanand Nagar Vibhag IV Cooperative Housing
BAJAJ INTERNATIONAL REALTY PRIVATE LIMITED
FORTUNE ELITE
SAFFRON SPACES LIMITED
NICCO RESIDENCY
NEELKAMAL REALTY & CONSTRUCTION LLP
Parleshwar Aangan
Panom Developers LLP
ATHARV AARADHYAM
Atharv Infra LLP
Krishna Milan Heights
Milan Interbuilt Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: Shrikrishna Developers
Shrikrishna Developers has 5 registrations on MahaRERA, including Silver Springs and VIJAY ANAND PLAZA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Silver Springs is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Silver Springs?
The registered promoter entity is Shrikrishna Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Silver Springs?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Silver Springs?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Silver Springs?
The professionals named in the filing: Architect: Arch View Associates; Engineer: Vinay Singh; Engineer: MR DIMPLE A BHAVSAR; Chartered Accountant: Sinha Purohit & Associate. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Silver Springs?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback