Home / Browse projects / Kolhapur, Maharashtra / SILVER OAK PHASE 2

Completed No litigation declared Others project

SILVER OAK PHASE 2

By BHASKAR RAMGONDA PATIL

RG-MH-16170 · RERA P53000025215 · Last updated on MahaRERA portal: 24 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Mar 2024Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

SILVER OAK PHASE 2 is a Others project by BHASKAR RAMGONDA PATIL in Kolhapur, Maharashtra, registered with MahaRERA as P53000025215 on 23 Mar 2020. The registration is recorded completed; possession was promised by 30 Mar 2024.

At a glance

Project

  • NameSILVER OAK PHASE 2
  • TypeOthers
  • Location
    • SANKESHWAR ROAD
    • NEAR RELIANCE PETROL PUMP
    • Gadhinglaj (M Cl)
    • Gadhinglaj
    • Kolhapur
    • 416502
  • Pincode416502
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000025215
  • ReraGenie IDRG-MH-16170

Builder

  • NameBHASKAR RAMGONDA PATIL
  • Entity typeIndividual
  • GSTIN27AHEPP3591Q1ZJ
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations5 more →
  • Completed3 of 6
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredMar 2020PromisedMar 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Mar 2020
  • Promised completion30 Mar 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed66 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 4NA60000
BUILDING NO 5NA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

BUILDING NO 491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 591%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed129

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots129
Closed/Covered129
BuildingClosed/CoveredTotal
BUILDING NO 44747
BUILDING NO 58282

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,808 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
BHASKAR RAMGONDA PATILGadhinglaj (M Cl)Kolhapur
ARUN LAXMAN TELANGGadhinglaj (M Cl)Kolhapur
VIJAY BABURAO TELANGGadhinglaj (M Cl)Kolhapur
VISHWANATH VIRBHADRAPPA PATTANSHETTIGadhinglaj (M Cl)Kolhapur

Approvals and building plan

Permissible FSI2009.03
Proposed, not sanctioned2,009 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch GAT NO 76 BHADGAON ROAD GADHINGLAJ

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAHAS ARVIND PATIL
EngineerSUNUL A DESAI
Chartered AccountantNANDKUMAR T SHELAKE
PartnerRole in project
BHASKAR RAMGONDA PATIL-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Mar 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Aug 2023

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate Dec.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate March.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cer.pdf24 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf24 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Site Sup.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Dec 24 Silver Oak 5.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Silver Oak 5.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Silver Oak 5 Sold Unsold.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Sep 24 Silver Oak 5.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Sep 24 Silver Oak 5.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Sep 24 Silver Oak 5.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Silver Oak 5- Arc- Certificate .pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Silver Oak 5.pdf15 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf15 Jul 2024
Disclosure of sold/ booked inventoryFile: Silver Oak 5 Sold.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf10 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 1.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf10 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Site Supervisors Certificate.pdf10 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf10 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21.pdf29 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 22 23.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 05.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificvate Silver Oak 5.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR CERTIFICATE SO5.pdf3 Oct 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD SO5.pdf3 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf23 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21) (1).pdf23 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A SO5.pdf23 Aug 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Silver Oak 04 Complication Certificate.pdf23 Aug 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - 04.pdf23 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Silver Oak.pdf8 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf8 Dec 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Did of Diclercation20221123_11305412.pdf8 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate Silver Oak 05.pdf24 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Site Supervisor Certificate Silver Oak 05.pdf24 Nov 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Silver Oak 04.pdf24 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Silver Ock Buling 5.pdf20 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate form 1 jan 22.pdf13 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Site Supervisor form2.pdf6 Jan 2022
Disclosure of sold/ booked inventoryFile: Sold Booked unit.pdf6 Jan 2022
Building plan approvalFile: silver oak No 4 Revise Plan.pdf20 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: silver oak No 4 Revise Plan.pdf20 Apr 2021
Building plan approvalFile: silver oak No 5 Revise Plan.pdf6 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: silver oak No 5 Revise Plan.pdf6 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: REWISE PERMISSION2021.pdf6 Apr 2021
Layout approvalFile: Layout Plan.pdf13 Mar 2020
Building plan approvalFile: Plan.pdf13 Mar 2020
PAN CardFile: Pan Card.pdf13 Mar 2020
Copy of the legal title reportFile: Search Report.pdf13 Mar 2020
Details of encumbrancesFile: Rawalnath Index 01.pdf13 Mar 2020
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf13 Mar 2020
Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf13 Mar 2020
Commencement Certificates / NA Order for plotted developmentFile: Permission.pdf13 Mar 2020
Declaration in FORM BFile: Afidevit.pdf13 Mar 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate.pdf13 Mar 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg certificate.pdf13 Mar 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf13 Mar 2020
Proforma of Allotment letterFile: agreement to sale format.pdf13 Mar 2020
OtherFile: Utara.pdf13 Mar 2020
OtherFile: Development Agreement.pdf13 Mar 2020
OtherFile: Powar of Attorny.pdf13 Mar 2020
OtherFile: Amalgmication.pdf13 Mar 2020

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
OM DATTA SHANTIAYODHYANAGAR1CompletedApr 2017Apr 2017
RAGHURAJ RESIDENCYSANKESHWAR ROAD1CompletedJan 2017Dec 2016
OMKAR PRIDE 1AMBARI GALLI GADHINGLAJ1CompletedJan 2017Dec 2016
ABHISHEK PLAZASAI MANDIR ROAD1CompletedJan 2017Late, Feb 2017
OM ABHISHEK RESIDENCYANAND COLONY1CompletedNov 2015Late, Dec 2015

How this compares with Kolhapur

17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is completed

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep SILVER OAK PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR RELIANCE PETROL PUMP880+ in Kolhapur

2 kmSILVER OAK PHASE 2Completed 3Lapsed / revoked 2Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: BHASKAR RAMGONDA PATIL

BHASKAR RAMGONDA PATIL has 6 registrations on MahaRERA, including SILVER OAK PHASE 1 and KIRAN HEIGHTS. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 5 past projects completed on time. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if SILVER OAK PHASE 2 is delayed beyond 30 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SILVER OAK PHASE 2?

The registered promoter entity is BHASKAR RAMGONDA PATIL, an individual as per the filing. Its GSTIN 27AHEPP3591Q1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SILVER OAK PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SILVER OAK PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SILVER OAK PHASE 2?

The professionals named in the filing: Architect: SAHAS ARVIND PATIL; Engineer: SUNUL A DESAI; Chartered Accountant: NANDKUMAR T SHELAKE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SILVER OAK PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SILVER OAK PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SILVER OAK PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.