Completed No litigation declared Residential / Group Housing project

Silver Oak at Prestige Residency

By PRESCON Realtors & Infrastructures Pvt. ltd.

RG-MH-10744 · RERA P51700002982 · Last updated on MahaRERA portal: 13 May 2020

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2020Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
1Complaints at MahaRERAon this registration
Jump to the 46 documents Report an error

Silver Oak at Prestige Residency is a Residential / Group Housing project by PRESCON Realtors & Infrastructures Pvt. ltd. in Thane, Maharashtra, registered with MahaRERA as P51700002982 on 4 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2020. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSilver Oak at Prestige Residency
  • TypeResidential / Group Housing
  • Location
    • Ghodbunder road
    • Kavesar
    • Thane (M Corp.)
    • Thane
    • 400610
  • Pincode400610
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700002982
  • ReraGenie IDRG-MH-10744

Builder

  • NamePRESCON Realtors & Infrastructures Pvt. ltd.
  • Entity typeCompany
  • Managing DirectorVinay S Kedia
  • ChairpersonNitin S Kedia
  • Declared earlier projects5 →

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toDec 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Aug 2017
  • Promised completion30 Dec 2020
  • Revised completionRevised to 30 Dec 2020 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed46 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Silver OakNA290000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 May 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Silver Oak: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 May 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed117

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots117
Closed/Covered117

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,520 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7783.81
Proposed, not sanctioned7,784 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchElegance Building Damani Estate Naupada Thane West

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM S Bakshi & Associates
EngineerR C Tipnis
Chartered AccountantSandeep rathi & Associates
Chartered AccountantSKPAG & Co
PartnerRole in project
PRESCON Realtors & Infrastructures Pvt. ltd.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700005460Dec 2019 → Jun 2020

Reason as filed by the promoter• The said building under reference in is completed in all respects and ready for possession much prior to the scheduled date. ( Architects certificate of completion dt. 30.06.2019 attached ). • Further, we had applied to the Thane Municipal Corporation for grant of Occupancy Certificate for the above building on 5th February 2019. The Corporation ( TMC ) completed its inspection, and by its letter dated 8th March 2019 granted approval for issuing occupation certificate subject to compliance of certain conditions w.r.t. U.L.C. Department and payment of charges mentioned therein. • We have to i

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000591405M/s Prestige Residency Silver Oak Co-operative Housing Limited-06/08/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 May 2020

Documents filed46

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Silver Oak OC certificate 120520.pdf13 May 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Silver Oak Architect certificate 300919.pdf12 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Silver Oak Engineer certificate 300919.pdf12 Nov 2019
Certificates of CA (Form 5)File: Silver Oak CA certificate 300919.pdf12 Nov 2019
Architect’s Certificate on Completion of Project (Form 4)File: Silver Oak Architect certificate 300919.pdf12 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect_certificate_June19.pdf27 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer_certificate_June19.pdf27 Aug 2019
Certificates of CA (Form 3)File: CA_Certificate_June19.pdf27 Aug 2019
Certificates of CA (Form 5)File: Form 5_Chartered Accountant Annual Report18_19.pdf27 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certi.pdf9 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certi Dec18.pdf9 Feb 2019
Certificates of CA (Form 3)File: CA Certi Dec18.pdf9 Feb 2019
Certificates of CA (Form 5)File: Form 5_Chartered Accountant Annaul Report.pdf14 Dec 2018
Details of encumbrancesFile: MortgageDeedIndex2_ECL.pdf16 Nov 2018
Details of encumbrancesFile: NOC_IBulls_PRIPL.pdf16 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect CERT Sept18.pdf5 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Sept18.pdf5 Nov 2018
Certificates of CA (Form 3)File: CA certificate sept18.pdf5 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERT.pdf1 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg cert.pdf1 Sep 2018
Certificates of CA (Form 3)File: CA certificate.pdf1 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate 310318.pdf30 May 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate 310318.pdf30 May 2018
Certificates of CA (Form 3)File: CA certificate 310318.pdf30 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3rd Architect Certificate as on 30-12-17.pdf25 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3rd Engineer Certificate as on 30-12-17.pdf25 Jan 2018
Certificates of CA (Form 3)File: 3rd CA Certificate as on 30-12-17.pdf25 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2nd-Architect-CERTIFICATE as on 261017.pdf1 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2nd-ENGINEER CERTIFICATE as on 300917.pdf1 Nov 2017
Certificates of CA (Form 3)File: 2nd-CA CERTIFICATE as on 300917.pdf1 Nov 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2nd-Architect-CERTIFICATE as on 261017.pdf31 Oct 2017
Proforma of Allotment letterFile: Agreement-Allotment letter-Final 220717.pdf22 Jul 2017
Building plan approvalFile: 4 Bldg Plan 2.pdf19 Jul 2017
Layout approvalFile: 4 Layout Plan.pdf19 Jul 2017
Building plan approvalFile: 4 Bldg Plan 1.pdf19 Jul 2017
PAN CardFile: 1 Pan Card.pdf19 Jul 2017
Copy of the legal title reportFile: 2 Title Reports.pdf19 Jul 2017
Details of encumbrancesFile: 3 Mortgage Deed Index 2.pdf19 Jul 2017
Copy of Layout Approval (in case of layout)File: 4 Layout Plan.pdf19 Jul 2017
Building Plan Approval (IOD)File: 4 Bldg Plan 1.pdf19 Jul 2017
Building Plan Approval (IOD)File: 4 Bldg Plan 2.pdf19 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: 12 Commence Certi.pdf19 Jul 2017
Declaration in FORM BFile: 6 Form B.pdf19 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1st-ARCHITECT CERTIFICATE as on 300617.pdf19 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1st-Engineer certificate as on 300617.pdf19 Jul 2017
Certificates of CA (Form 3)File: 1st-CA-CERTIFICATE as on 300617.pdf19 Jul 2017

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Hill View, Prestige ResidencyGhodbunder road - Thane west104CompletedDec 2014Late, Feb 2017
Gardenia, Prestige ResidencyGhodbunder road - Thane west120CompletedDec 2012Late, Sep 2014
Azelia, Prestige ResidencyGhodbunder road Thane West73CompletedSep 2012Late, Sep 2014
Primrose, Prestige ResidencyGhodbunder road - Thane west56CompletedDec 2011Late, Mar 2013

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Silver Oak at Prestige Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kavesar7,600+ in Thane

2 kmSilver Oak at Prestige RCompleted 72Lapsed / revoked 12Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 132 registered projects within 2 km.

Builder: PRESCON Realtors & Infrastructures Pvt. ltd.

PRESCON Realtors & Infrastructures Pvt. ltd. has 1 registration on MahaRERA, including Silver Oak at Prestige Residency. Its filings disclose 5 earlier MahaRERA projects: declares 1 of 5 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Silver Oak at Prestige Residency is delayed beyond 30 Dec 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Silver Oak at Prestige Residency?

The registered promoter entity is PRESCON Realtors & Infrastructures Pvt. ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Silver Oak at Prestige Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Silver Oak at Prestige Residency?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Silver Oak at Prestige Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Silver Oak at Prestige Residency?

The professionals named in the filing: Architect: M S Bakshi & Associates; Engineer: R C Tipnis; Chartered Accountant: Sandeep rathi & Associates; Chartered Accountant: SKPAG & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Silver Oak at Prestige Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Silver Oak at Prestige Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Silver Oak at Prestige Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.