Home / Browse projects / Thane, Maharashtra / SILVER LIFESTYLE

Registered No litigation declared Others project

SILVER LIFESTYLE

By SILVERLINE BUILDHEIGHT LLP

RG-MH-80571 · RERA P51700032131 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
11 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 97%
217 of 318Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

SILVER LIFESTYLE is a Others project by SILVERLINE BUILDHEIGHT LLP in Thane, Maharashtra, registered with MahaRERA as P51700032131 on 14 Dec 2021. Possession is promised by 31 Dec 2026. 101 of the 318 units on this registration are recorded sold or booked, and 11 of 33 construction stages are filed complete.

At a glance

Project

  • NameSILVER LIFESTYLE
  • TypeOthers
  • Location
    • KAUSA
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700032131
  • ReraGenie IDRG-MH-80571

Builder

  • NameSILVERLINE BUILDHEIGHT LLP
  • Entity typePartnership
  • PartnersAARIF AHSAN KHAN, BASHIRULLAH JAAN MOHAMMED KHAN, FAHIM ABDUL HAMID DINGANKAR, MOHAMMED IBRAHIM ABDUL MAJID RAUT, JAVED AKHTAR AZMI, SHAKIR SIKANDAR HAFIZULLAH KHAN
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2021PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Dec 2021
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed107 files

Current status

32%101 of 318 units booked
23.9%Work done, per cost certificate

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA25198190171
A2NA241983487
BNA257451560

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 97%.

A150%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure97%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A250%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure97%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B36%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed554

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots554
Closed/Covered197
Open Space357
BuildingClosed/CoveredOpen SpaceTotal
A173170243
A273170243
B511768

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,564 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Sep 2025
LandownerVillageDistrict
SHAMSULLAH SHAIKHMumbai CityMumbai City
IMRAN KHAN-Siddharthnagar
GUFRAN SHAIKHMumbai CityMumbai City
AHSAN ZAMIRULLAH KHANThane (M Corp.)Thane
FARHAN KHANThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI34139.1
Proposed, not sanctioned10,578 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMumbra
Estimated costRs 74.09 cr
Cost incurredRs 17.72 cr
Work done23.91%
BuildingWingEstimatedIncurred
A1NARs 26.25 crRs 6.64 cr
A2NARs 26.25 crRs 6.64 cr
BNARs 17.50 crRs 4.43 cr
-NARs 4.09 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectULHAS PRADHAN & ASSOCIATES
EngineerVINAYAK CHOPDEKAR & ASSOCIATES
Engineerkamlesh Yadav
Chartered AccountantMOHD SHAMIM & COMPANY
Chartered AccountantR S P H & Associates
Chartered AccountantBashmakh & Co.
Chartered AccountantCA Pratik D Jain
PartnerRole in project
SILVERLINE BUILDHEIGHT LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect_Certificate_March_2026.pdf22 Jun 2026
Withdrawal Update Form 2File: Engineer_Certificate_March_2026.pdf22 Jun 2026
Withdrawal Update Form 3File: CA - March 26-Final.pdf22 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A march 26.pdf11 Apr 2026
Form 2A (FY 2021-2022)File: Form 2A march 22.pdf11 Apr 2026
Form 2A (FY 2022-2023)File: Form 2A march 23.pdf11 Apr 2026
Form 2A (FY 2023-2024)File: Form 2A march 24.pdf11 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A march 25.pdf11 Apr 2026
Form 5 (FY 2021-2022)File: Lifestyle_Rera_Audit_FY2021-22.pdf2 Apr 2026
Form 5 (FY 2022-2023)File: CA_Audit_Report_FY 2022-23.pdf2 Apr 2026
Form 1File: AR - Sept 25 .pdf31 Mar 2026
Form 2File: ER - Sept 25.pdf31 Mar 2026
Form 3File: CA - Sept 25 .pdf31 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - Sept 25 .pdf31 Mar 2026
Form 1File: AR - Dec 25 .pdf31 Mar 2026
Form 2File: ER - Dec 25.pdf31 Mar 2026
Form 3File: CA Cert_Silverline-Dec-25.pdf31 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - Dec 25 .pdf31 Mar 2026
Form 5 (FY 2024-2025)File: Signed RERA audit report 24-25-Final.pdf11 Dec 2025
Form 1File: Arch_Ctft_Lifestyle June_2025.pdf5 Sep 2025
Form 2File: Engineer Certificate jun 25.pdf5 Sep 2025
Form 3File: CA Cert_Silverline-June-25.pdf5 Sep 2025
Disclosure of Sold and Booked InventoryFile: Signed_Disclosure of Sold Booked Inventory- Silver Lifestyle June 25.pdf5 Sep 2025
Form 1File: AR Certificate jun 22.pdf2 Sep 2025
Form 2File: Enginner Certificate jun 22.pdf2 Sep 2025
Form 3File: CA Certificate jun 22.pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: disclosure jun 22.pdf2 Sep 2025
Form 1File: Architect sep 22.pdf1 Sep 2025
Form 2File: ER Certificate Sep 22.pdf1 Sep 2025
Form 3File: CA Certificate sept 22.pdf1 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure sep 22.pdf1 Sep 2025
Form 1File: AR Certificate Dec 22.pdf1 Sep 2025
Form 2File: ER certificate Dec 22.pdf1 Sep 2025
Form 3File: 4 CA Cert_Silverline Dec 22 (1).pdf1 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Dec 22.pdf1 Sep 2025
Form 1File: AR Certificate march 23.pdf1 Sep 2025
Form 2File: ER Certificate march 23.pdf1 Sep 2025
Form 3File: 5 CA Cert_Silverline March 23 (1).pdf1 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure mar 23.pdf1 Sep 2025
Form 1File: Architect certificate.pdf29 Aug 2025
Form 2File: Engineer certificate.pdf29 Aug 2025
Form 3File: CA Certificate march 22.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure 22.pdf29 Aug 2025
Form 1File: AR dec 24.pdf29 Aug 2025
Form 2File: Engineer dec 24.pdf29 Aug 2025
Form 3File: 12 CA Cert_Silverline Dec 24.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Dec 24.pdf29 Aug 2025
Form 1File: Architect sept 24.pdf29 Aug 2025
Form 2File: engineer sep 24.pdf29 Aug 2025
Form 3File: 11 CA Cert_Silverline Sept 24.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sept 24.pdf29 Aug 2025
Form 1File: Architect A+B mar 24.pdf29 Aug 2025
Form 2File: ER Mar 24.pdf29 Aug 2025
Form 3File: CA March 24.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure March 24.pdf29 Aug 2025
Form 1File: AR Certificate jun 24.pdf14 Aug 2025
Form 2File: ER Certificate jun 24.pdf14 Aug 2025
Form 3File: CA Cert_Silverline June 24 final.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure june 24.pdf14 Aug 2025
Form 1File: AR Certificate march 25.pdf14 Aug 2025
Form 2File: ER Certificate march 25.pdf14 Aug 2025
Form 3File: 13 CA Cert_Silverline_March 25.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Signed_Disclosure of Sold Booked Inventory- Silver Lifestyle March 25.pdf14 Aug 2025
Form 5 (FY 2023-2024)File: RA Report_ Silver lifestyle final.pdf13 Aug 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA_Audit_Report_FY 2022-23.pdf21 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: CA_Audit_Report_FY 2022-23.pdf4 Mar 2024
Disclosure of sold/ booked inventoryFile: Disclosure.pdf30 Jan 2024
Disclosure of sold/ booked inventoryFile: disclosure lifestyle.pdf19 Jul 2023
Disclosure of sold/ booked inventoryFile: ilovepdf_merged.pdf8 Apr 2023
Other - TechnicalFile: Quality Assurance Certificate Form 2A- MH - Silver Lifestyle-1.pdf8 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Lifestyle_Rera_Audit_FY2021-22.pdf16 Mar 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal-Silver Lifestyle.pdf16 Feb 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance-Silver Lifestyle.pdf16 Feb 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal-Silver Lifestyle.pdf16 Feb 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance-Silver Lifestyle.pdf16 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Declaration-Silver Lifestyle.pdf16 Feb 2023
Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter-Silver Lifestyle.pdf16 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Deviation for AFS-Silver Lifestyle.pdf16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Binder1.pdf13 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: scan 20230213 174549 compressed.pdf13 Feb 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Silver EnclaveP51700011093Thane (M Corp.), ThaneAug 2017Certificate SignedMar 2023Registered original: Mar 2020Mar 2020

How this compares with Thane

32%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SILVER LIFESTYLE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KAUSA7,600+ in Thane

2 kmSILVER LIFESTYLECompleted 52Lapsed / revoked 29Other 46Dot size: filed unitsN

Filed coordinates, straight-line distance. 127 registered projects within 2 km.

Builder: SILVERLINE BUILDHEIGHT LLP

SILVERLINE BUILDHEIGHT LLP has 1 registration on MahaRERA, including SILVER LIFESTYLE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SILVER LIFESTYLE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SILVER LIFESTYLE?

The registered promoter entity is SILVERLINE BUILDHEIGHT LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SILVER LIFESTYLE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SILVER LIFESTYLE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SILVER LIFESTYLE?

The professionals named in the filing: Architect: ULHAS PRADHAN & ASSOCIATES; Engineer: VINAYAK CHOPDEKAR & ASSOCIATES; Engineer: kamlesh Yadav; Chartered Accountant: MOHD SHAMIM & COMPANY; Chartered Accountant: R S P H & Associates; Chartered Accountant: Bashmakh & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SILVER LIFESTYLE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SILVER LIFESTYLE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SILVER LIFESTYLE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.