Home / Browse projects / Mumbai Suburban, Maharashtra / SILVER COIN CHSL
SILVER COIN CHSL
RG-MH-78456 · RERA P51800034409 · Last updated on MahaRERA portal: 21 Jan 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SILVER COIN CHSL is a Residential / Group Housing project by U K PROPERTIES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800034409 on 5 Apr 2022. The registration is recorded completed; possession was promised by 30 Sep 2024.
At a glance
Project
- NameSILVER COIN CHSL
- TypeResidential / Group Housing
- Location
- DMONTE LANE
- ORLEM
- MALAD WEST
- MUMBAI
- Borivali
- Mumbai Suburban
- 400064
- Pincode400064
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800034409
- ReraGenie IDRG-MH-78456
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on5 Apr 2022
- Promised completion30 Sep 2024
- Revised completionNone
- Buildings1 building record
- Documents filed44 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SILVER COIN | NA | 15 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 21 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
SILVER COIN: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 21 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SILVER COIN CP-OP. HOUSING SOCIETY LTD | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SIDDHARTH NADKARNI |
| Engineer | YASHWANT PANDIT |
| Engineer | KAIVANT SHAH |
| Chartered Accountant | JIGNESH DOSHI |
| Chartered Accountant | BHUMIKA AGARWAL |
| Partner | Role in project |
|---|---|
| U. K. PROPERTIES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Feb 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Mar 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 7 Oct 2024
Documents filed44
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: FORM-4_Silver Coin-signed.pdf | 21 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Silver Coin_OC_signed.pdf | 7 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Silver Coin_OC_signed.pdf | 7 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Silver Coin 31-3-2024_signed by Promoter.pdf | 11 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Silver Coin_31-12-23_signed by Promoter.pdf | 5 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_Silver Coin_06-07-23.pdf | 31 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_Silver Coin_31-10-23.pdf | 31 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Silver Coin_30-06-23.pdf | 31 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Silver Coin_30-10-23.pdf | 31 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2-A_Jaspal Dogra_31-03-23_compressed.pdf | 31 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Silver Coin_30-09-23_compressed-signed.pdf | 12 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Silver Coin_31-03-23_signed by Promoter.pdf | 11 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3-Silver Coin_compressed.pdf | 31 Mar 2022 |
| Proforma of Allotment letterFile: Draft of Allotment Letter_Silver Coin.pdf | 31 Mar 2022 |
| Proforma of Allotment letterFile: Draft Agreemant for Sale_Silver Coin.pdf | 31 Mar 2022 |
| Layout approvalFile: First CC_Silver Coin.pdf | 30 Mar 2022 |
| Building plan approvalFile: MCGM approved Plan_Silver Coin-1.pdf | 30 Mar 2022 |
| Building plan approvalFile: MCGM approved Plan_Silver Coin-2.pdf | 30 Mar 2022 |
| Building plan approvalFile: MCGM approved Plan_Silver Coin-3.pdf | 30 Mar 2022 |
| Building plan approvalFile: MCGM approved Plan_Silver Coin-4.pdf | 30 Mar 2022 |
| Building plan approvalFile: MCGM approved Plan_Silver Coin-5.pdf | 30 Mar 2022 |
| Building plan approvalFile: MCGM approved Plan_Silver Coin-6.pdf | 30 Mar 2022 |
| Building plan approvalFile: MCGM approved Plan_Silver Coin-7.pdf | 30 Mar 2022 |
| Building plan approvalFile: 2312187_COD_signed.pdf | 30 Mar 2022 |
| Layout approvalFile: IOD_signed.pdf | 30 Mar 2022 |
| Layout approvalFile: 2312187_COD_signed.pdf | 30 Mar 2022 |
| Details of encumbrancesFile: Self Declaration for Encumbrances-CERSAI.pdf | 30 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: First CC_Silver Coin.pdf | 30 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: IOD_signed.pdf | 30 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: 2312187_COD_signed.pdf | 30 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MCGM approved Plan_Silver Coin-1.pdf | 30 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MCGM approved Plan_Silver Coin-2.pdf | 30 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MCGM approved Plan_Silver Coin-3.pdf | 30 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MCGM approved Plan_Silver Coin-4.pdf | 30 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MCGM approved Plan_Silver Coin-5.pdf | 30 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MCGM approved Plan_Silver Coin-6.pdf | 30 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MCGM approved Plan_Silver Coin-7.pdf | 30 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 2312187_COD_signed.pdf | 30 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: First CC_Silver Coin.pdf | 30 Mar 2022 |
| Declaration about Commencement CertificateFile: Declaration for CC.pdf | 30 Mar 2022 |
| Declaration in FORM BFile: Form-B Affidavit cum Declaration of Promoter_Silver Coin_compressed.pdf | 30 Mar 2022 |
| CERSAI detailsFile: Self Declaration for Encumbrances-CERSAI.pdf | 30 Mar 2022 |
| PAN CardFile: U K PROPERTIES PAN CARD.pdf | 10 Feb 2022 |
| Copy of the legal title reportFile: Silver Coin Tittle Certificate_compressed.pdf | 10 Feb 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 44 filed documents as one ZIP, foldered, with a manifest
Keep SILVER COIN CHSL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ORLEM, MALAD WEST, MUMBAI6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 406 registered projects within 2 km.
Ruparel Stardom
AMI MODISPACES LLP
Chandak Treesourus
CHANDAK REALTORS PRIVATE LIMITED
ANCHORPOINT AVIARA
YUKTI INFRAPROJECTS LLP
AURIS ILARIA TOWER A
TRANSCON-SHETH CREATORS PRIVATE LIMITED
ADHRIT
MUNDARA DEVELOPERS
IRENE WING B PHASE 1
Sheth Creators and Sunvision Private Limit
See every Mumbai Suburban project, with the district possession charts
Builder: U K PROPERTIES
U K PROPERTIES has 4 registrations on MahaRERA, including LA SERENA CO-OP. HSG. SOC. LTD. and SILVER COIN CHSL. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if SILVER COIN CHSL is delayed beyond 30 Sep 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SILVER COIN CHSL?
The registered promoter entity is U K PROPERTIES, a partnership as per the filing. Its GSTIN 27AACFU7443B2ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SILVER COIN CHSL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SILVER COIN CHSL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SILVER COIN CHSL?
The professionals named in the filing: Architect: SIDDHARTH NADKARNI; Engineer: YASHWANT PANDIT; Engineer: KAIVANT SHAH; Chartered Accountant: JIGNESH DOSHI; Chartered Accountant: BHUMIKA AGARWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SILVER COIN CHSL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback