Home / Browse projects / Mumbai Suburban, Maharashtra / SILICON HOFE B WING

Registered No litigation declared Others project

SILICON HOFE B WING

By SHILPRIYA BUILDERS AND DEVELOPERS

RG-MH-07555 · RERA P51800054852 · Last updated on MahaRERA portal: 28 Jul 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 2 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 33%
6 of 72Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

SILICON HOFE B WING is a Others project by SHILPRIYA BUILDERS AND DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800054852 on 15 Feb 2024. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 2 months from the original filing. 66 of the 72 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSILICON HOFE B WING
  • TypeOthers
  • Location
    • Building No.53
    • Tilaknagar- Chembur
    • Chembur
    • Kurla
    • Mumbai Suburban
    • 400089
  • Pincode400089
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800054852
  • ReraGenie IDRG-MH-07555

Builder

  • NameSHILPRIYA BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersGOVIND JETHA GAMI, SAGAR MANGALDAS BHANUSHALI, MURJI DAMJI MINAT, MANGALDAS MANJI BHANUSHALI
  • Other registrations3 more →
  • Completed3 of 4
  • Past their filed date1
  • Declared earlier projects2 →

Key dates

1 months past promisethis monthRegisteredFeb 2024First promiseJul 2026Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2024
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 31 Jul 2026)
  • Buildings1 building record
  • Documents filed83 files

Current status

92%66 of 72 units booked

Figures as on 28 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B WINGNA151570272

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 33%.

B WING: 41% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure33%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed62

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots62
Closed/Covered62

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,501 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Sep 2024
LandownerVillageDistrict
Tilak Nagar Sahajeevan Co-Operative Hsg Soc LtdKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityMaharashtra Housing and Area Development Authority
Permissible FSI4121.55
Proposed, not sanctioned4,122 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSwastik Value Heights, Ground Floor, Plot No Ndr 23, Tilaknagar, Adjacent To Sahakar Cinema, Chembur, Mumbai, Maharashtra 400089

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNASA Architectural Consultant Pvt
EngineerS K Consultants & Engineers
EngineerRajendra Bankar
Chartered AccountantNB Sayed & Associates
Chartered AccountantPranav Bhaskaran & Associates
PartnerRole in project
SHILPRIYA BUILDERS AND DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA28072621899Jul 2026 → Sep 2026

Reason as filed by the promoterThe delay in completion of the project is solely due to the pending execution and registration of the Indenture of Modification of Lease Deed between MHADA and the concerned Co-operative Housing Society, which is a mandatory statutory requirement for issuance of the Occupation Certificate (OC); although the construction has been completed and all other statutory requirements have been complied with, including submission of the Indenture application on 15/12/2025 and the OC application on 10/06/2026, we request an extension of the project registration until 30/09/2026 to complete the remaining

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2023-2024)File: Forrm 2A (FY 2023-24).pdf28 Jul 2026
Form 2A (FY 2024-2025)File: Forrm 2A (FY 2024-25).pdf28 Jul 2026
Form 2A (FY 2025-2026)File: Forrm 2A (FY 2025-26) (1).pdf28 Jul 2026
Form 5 (FY 2023-2024)File: Form 5 - Silicon Hofe B Wing for FY 2023-24.pdf24 Jul 2026
Form 5 (FY 2024-2025)File: Form 5 - Silicon Hofe B Wing for FY 2024-25.pdf24 Jul 2026
Form 1File: Form 1 - Silicon Hofe B Wing as on June 2026.pdf9 Jul 2026
Form 2File: Form 2 - Silicon Hofe B Wing as on June 2026.pdf9 Jul 2026
Form 3File: Form 3 - Silicon Hofe B Wing as on June 2026.pdf9 Jul 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Silicon Hofe B Wing as on June 2026.pdf9 Jul 2026
Form 1File: Form 1 - Silicon Hofe B Wing as on March 2026.pdf15 Apr 2026
Form 2File: Form 2- Silicon Hofe B Wing as on March 2026.pdf15 Apr 2026
Form 3File: Form 3 - Silicon Hofe B Wing as on March 2026.pdf15 Apr 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Silicon Hofe B Wing as on March 2026.pdf15 Apr 2026
Form 1File: Form 1 - Silicon Hofe B Wing as on Dec 2025.pdf15 Apr 2026
Form 2File: Form 2- Silicon Hofe B Wing as on March 2026.pdf15 Apr 2026
Form 3File: Form 3 - Silicon Hofe B Wing as on Dec 2025.pdf15 Apr 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Silicon Hofe B Wing as on Dec 2025.pdf15 Apr 2026
Form 1File: Form 1 - Silicon Hofe B Wing as on June 2025.pdf9 Oct 2025
Form 2File: Form 2 - Silicon Hofe B Wing as on June 2025.pdf9 Oct 2025
Form 3File: Form 3 - Silicon Hofe B Wing as on June 2025.pdf9 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Silicon Hofe B Wing as on June 2025.pdf9 Oct 2025
Form 1File: Form 1 - Silicon Hofe B Wing as on Sep 2025.pdf9 Oct 2025
Form 2File: Form 2 - Silicon Hofe B Wing as on Sep 2025.pdf9 Oct 2025
Form 3File: Form 3 - Silicon Hofe B Wing as on Sep 2025.pdf9 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Silicon Hofe B Wing as on Sep 2025.pdf9 Oct 2025
Form 1File: Form 1 - Silicon Hofe B Wing as on March 2025.pdf29 Sep 2025
Form 2File: Form 2 - Silicon Hofe B Wing as on March 2025.pdf29 Sep 2025
Form 3File: Form 3 - Silicon Hofe B Wing as on 31-03-2025.pdf29 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Silicon Hofe B Wing as on March 2025.pdf29 Sep 2025
Proforma of Agreement for saleFile: AFS - Silicon Hofe B Wing.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Silicon hofe B Wing Signed 31-12-2024.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Silicon Hofe B Wing as on Dec 2024.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Silicon Hofe B wing as on Dec 2024.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Silicon Hofe B Wing as on 31-12-2024.pdf17 Jan 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Letter - Finance - Silicon Hofe B Wing.pdf16 Jan 2025
Details of encumbrances concerned to LegalFile: Encumbrance Letter - Finance - Silicon Hofe B Wing.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Silicon Hofe B Wing as on June 2024.pdf7 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf7 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Silicon Hofe B Wing as on Sep 2024.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Silicon Hofe B Wing as on Sep 2024.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Silicon Hofe B Wing as on Sep 2024.pdf25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Silicon Hofe B Wing as on June 2024.pdf31 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Silicon Hofe B Wing as on March 2024.pdf27 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Silicon Hofe B Wing as on March 2024.pdf20 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Silicon Hofe B Wing as on March 2024.pdf18 Jun 2024
Proforma of Agreement for saleFile: AFS - Silicon Hofe B Wing.pdf18 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Verification.pdf6 Feb 2024
Other - TechnicalFile: ilovepdf_merged (64).pdf6 Feb 2024
Other - TechnicalFile: Declaration for Parking (1).pdf6 Feb 2024
Other - TechnicalFile: CC Verification.pdf6 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: organized (7).pdf23 Jan 2024
Proforma of Allotment letterFile: Final Allotment letter Silicon Hofe B Wing dated.pdf23 Jan 2024
Proforma of Agreement for saleFile: Final Agreement for Sale Silicon Hofe B Wing.pdf23 Jan 2024
Deviation Report with respect to Allotment letterFile: Deviation Report Allotment Letter Silicon Hofe B Wing dated - Shilpriya.pdf23 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report of Agreement for Sale Silicon Hofe B Wing.pdf23 Jan 2024
Other - LegalFile: 4 Other - Legal (4).pdf23 Jan 2024
Other - TechnicalFile: 4 Other - Legal (4).pdf23 Jan 2024
Layout approvalFile: 1 Copy of Layout Approval (in case of layout) (18).pdf16 Jan 2024
Building plan approvalFile: 1 Copy of Layout Approval (in case of layout) (18).pdf16 Jan 2024
Building plan approvalFile: Approved Plan_removed (1).pdf16 Jan 2024
Building plan approvalFile: Approved Plan_removed (2).pdf16 Jan 2024
PAN CardFile: 1 PAN Card (12).pdf16 Jan 2024
Copy of the legal title reportFile: 1 Copy of the legal title report (26).pdf16 Jan 2024
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (21).pdf16 Jan 2024
Details of encumbrances concerned to FinanceFile: 2 b Details of encumbrances concerned to Legal (14).pdf16 Jan 2024
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (21).pdf16 Jan 2024
Details of encumbrances concerned to LegalFile: 2 b Details of encumbrances concerned to Legal (14).pdf16 Jan 2024
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout) (18).pdf16 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 Copy of Layout Approval (in case of layout) (18).pdf16 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan_removed (1).pdf16 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan_removed (2).pdf16 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC dated - B Wing.pdf16 Jan 2024
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (14).pdf16 Jan 2024
Declaration in FORM BFile: Form B - Promoter.pdf16 Jan 2024
CERSAI detailsFile: 1 CERSAI details (24).pdf16 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (16).pdf16 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow16 Jan 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SILICON HOFE A WINGP51800029560Tilak Nagar Chembur Mumbai, Mumbai Suburban21Jun 2021OngoingJun 2024Not delivered
SILICON ENCLAVEBldg No 58 Tilaknagar Chembur Mumbai 400089128-CompletedOct 2020Aug 2020

How this compares with Mumbai Suburban

92%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 2 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SILICON HOFE B WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tilaknagar- Chembur6,700+ in Mumbai Suburban

2 kmSILICON HOFE B WINGCompleted 193Lapsed / revoked 153Other 200Dot size: filed unitsN

Filed coordinates, straight-line distance. 546 registered projects within 2 km.

Builder: SHILPRIYA BUILDERS AND DEVELOPERS

SHILPRIYA BUILDERS AND DEVELOPERS has 4 registrations on MahaRERA, including SILICON ENCLAVE and SILICON HOFE A WING. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SILICON HOFE B WING is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SILICON HOFE B WING?

The registered promoter entity is SHILPRIYA BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SILICON HOFE B WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SILICON HOFE B WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SILICON HOFE B WING?

The professionals named in the filing: Architect: NASA Architectural Consultant Pvt; Engineer: S K Consultants & Engineers; Engineer: Rajendra Bankar; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Pranav Bhaskaran & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SILICON HOFE B WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SILICON HOFE B WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SILICON HOFE B WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.