ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Silicon Heritage

Completed No litigation declared Others project

Silicon Heritage

By SHILPRIYA BUILDERS AND DEVELOPERS

RG-MH-95391 · RERA P51800046689 · Last updated on MahaRERA portal: 13 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
20 of 44Construction stages doneacross 4 buildings; furthest along: Staircases, 50%
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

Silicon Heritage is a Others project by SHILPRIYA BUILDERS AND DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046689 on 29 Aug 2022. The registration is recorded completed; possession was promised by 31 Dec 2025.

At a glance

Project

  • NameSilicon Heritage
  • TypeOthers
  • Location
    • Tilak Nagar
    • Tilak Nagar
    • Chembur
    • Kurla
    • Mumbai Suburban
    • 400089
  • Pincode400089
  • RERA no.P51800046689
  • ReraGenie IDRG-MH-95391

Builder

  • NameSHILPRIYA BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersGOVIND JETHA GAMI, SAGAR MANGALDAS BHANUSHALI, MURJI DAMJI MINAT, MANGALDAS MANJI BHANUSHALI
  • Other registrations3 more →
  • Completed3 of 4
  • Past their filed date1
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2022PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Aug 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings4 building records
  • Documents filed75 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA180000
Wing BNA180000
Wing CNA180000
Wing DNA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Staircases, at 50%.

Wing A59%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor40%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Wing B59%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor40%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Wing C59%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor40%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Wing D59%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor40%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,728 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Chembur Mayur Co -Operative Housing Society LtdKurlaMumbai Suburban

Approvals and building plan

Permissible FSI14062.14
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 6,7 And 8, Laxmi Market, Sector 19, Vashi - 400614

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
SHILPRIYA BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Silicon Heritage as on Dec 2025.pdf13 May 2026
Form 2File: Form 2 - Silicon Heritage as on Dec 2025.pdf13 May 2026
Form 3File: Form 3 - Silicon Heritage as on Dec 2025.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Silicon Heritage as on Dec 2025.pdf13 May 2026
Form 1File: Form 1 - Silicon Heritage as on June 2025.pdf5 Jan 2026
Form 2File: Form 2 - Silicon Heritage as on June 2025.pdf5 Jan 2026
Form 3File: Form 3 -Silicon Heritage as on 30-06-2025.pdf5 Jan 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Silicon Heritage as on 30-09-2025.pdf5 Jan 2026
Form 1File: Form 1 - Silicon Heritage as on Sep 2025.pdf19 Oct 2025
Form 2File: Form 2 - Silicon Heritage as on Sep 2025.pdf19 Oct 2025
Form 3File: Form 3 -Silicon Heritage as on 30-09-2025.pdf19 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Silicon Heritage as on 30-09-2025.pdf19 Oct 2025
Form 1File: Form 1 - Silicon Heritage as on March 2025.pdf6 Sep 2025
Form 2File: Form 2 - Silicon Heritage as on March 2025.pdf6 Sep 2025
Form 3File: Form 3 -Silicon Heritage as on 31-03-2025.pdf6 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Silicon Heritage as on March 2025.pdf6 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Silicon Heritage as on March 2025.pdf9 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Silicon Heritage 31-12-2024 Signed.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Silicon Heritage as on Dec 2024.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Silicon Heritage as on Dec 2024.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Silicon Heritage as on 31-12-2024.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Silicon Heritage as on June 2024 (SIGNED).pdf7 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf7 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Silicon Heritage as on Sep 2024.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Silicon Heritage as on Sep 2024.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Silicon Heritage as on Sep 2024.pdf25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Silicon Heritage as on June 2024.pdf31 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Silicone Heritage as on March 2024 (Signed).pdf27 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Silicon Heritage as on March 2024.pdf18 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Silicon Heritage as on March 2024.pdf2 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Silicon Heritage as on 31-03-2024.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Silicon Heritage as on March 2024.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Silicone Heritage as on Dec 2023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Silicon Heritage as on Dec 2023.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Silicon Heritage as on 31-12-2023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Silicon Heritage as on Sep 2023.pdf16 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Silicon Heritage as on 30-09-2023.pdf16 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Silicon Heritage as on 02-10-2023.pdf9 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: New Format Form 5 Silicon Heritage Final.pdf17 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Silicon Heritage as on 03-07-2023.pdf27 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Silicon Heritage as on Jun 2023 (Custom).pdf21 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Silicon Heritage as on 30-06-2023.pdf21 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Silicon Heritage Mar 23 - Form 2.pdf27 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Silicon Heritage as on 31-03-2023.pdf27 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Silicon Heritage.pdf25 Apr 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Letter dated 15012023 - Silicon Heritage (1).pdf16 Feb 2023
Details of encumbrances concerned to LegalFile: Encumbrance Letter dated 15012023 - Silicon Heritage (1).pdf16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Silicon Heritage.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Silicon Heritage as on December 2022.pdf16 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Silicon Heritage as on December 2022.pdf16 Feb 2023
Proforma of Agreement for saleFile: Draft of Agreement for Sale Silicon Herirage 14022023.pdf16 Feb 2023
Proforma of Allotment letterFile: Final AFS 23_08_2022.pdf23 Aug 2022
Proforma of Allotment letterFile: Final Allotment 23_08_22.pdf23 Aug 2022
Deviation Report with respect to Allotment letterFile: Deviation Allotment.pdf23 Aug 2022
Deviation Report with respect to model copy of AgreementFile: Deviation AFS.pdf23 Aug 2022
Copy of the legal title reportFile: Title Compress Shilpriya.pdf8 Aug 2022
Declaration in FORM BFile: Form B Promoter.pdf8 Aug 2022
CERSAI detailsFile: CERSAI_Search_Report_200244308826_For_Asset_Based_Search_08_08_2022_17_30_25_073.pdf8 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Merged with sign -Silicon Heritage.pdf8 Aug 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Letter - Finance.pdf2 Aug 2022
Details of encumbrances concerned to LegalFile: Encumbrance Letter - Legal.pdf2 Aug 2022
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf2 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Seperate Bank Account.pdf2 Aug 2022
Layout approvalFile: PLAN SHILPRIYA_6-end_rotated_compressed.pdf27 Jul 2022
Building plan approvalFile: PLAN SHILPRIYA_6-end_rotated_compressed.pdf27 Jul 2022
Building plan approvalFile: PLAN SHILPRIYA_1-5_compressed.pdf27 Jul 2022
PAN CardFile: Shilpriya Builders Developers PAN Card.pdf27 Jul 2022
Copy of Layout Approval (in case of layout)File: PLAN SHILPRIYA_6-end_rotated_compressed.pdf27 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: PLAN SHILPRIYA_6-end_rotated_compressed.pdf27 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: PLAN SHILPRIYA_1-5_compressed.pdf27 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: Plinth CC dated 19072022 - Bldg 123.pdf27 Jul 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SILICON HOFE A WINGP51800029560Tilak Nagar Chembur Mumbai, Mumbai Suburban21Jun 2021OngoingJun 2024Not delivered
SILICON ENCLAVEBldg No 58 Tilaknagar Chembur Mumbai 400089128-CompletedOct 2020Aug 2020

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Silicon Heritage on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tilak Nagar, Chembur6,700+ in Mumbai Suburban

Builder: SHILPRIYA BUILDERS AND DEVELOPERS

SHILPRIYA BUILDERS AND DEVELOPERS has 4 registrations on MahaRERA, including SILICON ENCLAVE and SILICON HOFE A WING. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Silicon Heritage is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Silicon Heritage?

The registered promoter entity is SHILPRIYA BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Silicon Heritage?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Silicon Heritage?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Silicon Heritage?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Silicon Heritage. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Silicon Heritage to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.