Registration lapsed No litigation declared Residential / Group Housing project

Signature Tower

By Saarrthi Realty and Infra Limited Liability Partnership

RG-MH-26550 · RERA P52100014316 · Last updated on MahaRERA portal: 20 Jul 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 37 months past the filed date
  • 2 complaints at MahaRERA
  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2023Possession promised37 months past this date
8 of 11Construction stages donefurthest along: Internal walls, 98%
2Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

Signature Tower is a Residential / Group Housing project by Saarrthi Realty and Infra Limited Liability Partnership in Pune, Maharashtra, registered with MahaRERA as P52100014316 on 20 Nov 2017. Possession was promised by 30 Sep 2023 and is now 37 months past that date. The completion date has moved by 30 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameSignature Tower
  • TypeResidential / Group Housing
  • Location
    • Model colony
    • Shivajinagar
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411016
  • Pincode411016
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100014316
  • ReraGenie IDRG-MH-26550

Builder

  • NameSaarrthi Realty and Infra Limited Liability Partnership
  • Entity typeOthers
  • Named personsAbhijeet Shende, Yogesh Shende, Nilesh Shende, Swapneel Shende, Vijay Mundhe, Serene Value Homes Limited Liability Partnership
  • Declared earlier projects5 →

Key dates

37 months past promisethis monthRegisteredNov 2017First promiseMar 2021Revised toSep 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on20 Nov 2017
  • Promised completion30 Sep 2023
  • Revised completionRevised to 30 Sep 2023 (originally 30 Mar 2021)
  • Buildings1 building record
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Signature TowerNA200000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 98%.

Signature Tower: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes80%
Street LightingYes80%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes70%

Parking filed65

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots65
Closed/Covered52
Open Space13

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,590 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
The Bank of Baroda Co operative Housing SocietyPune (M Corp.)Pune

Approvals and building plan

Permissible FSI7034.89
Proposed, not sanctioned7,035 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPune

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGohad Architect
ArchitectAdvantage Architects
EngineerDesign Werkz
Chartered AccountantH N V & Co
Chartered AccountantNilesh M Shah & Co
Chartered AccountantCA Saransh Dey
PartnerRole in project
Saarrthi Realty and Infra Limited Liability Partnership-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100013300Mar 2021 → Sep 2023

Reason as filed by the promoterTo The Maharashtra Real Estate Regulatory Authority 109 to 113, First Floor, Sayajirao Gaikwad Udyog Bhavan, Aundh, Pune -411007 Subject: Extension of registration of Project ‘Signature Tower’ bearing No. P52100014316 Dear Sir, We hereby seeking extension till 30/09/2021 for completing building and 30/03/2022 for completing development and amenities for project ‘Signature Tower’, being constructed on Final Plot No. 425 Sub-Plot No.(b), carved out of City Survey No.1073 of old Survey No.111, Hissa No.2, situate at village Bhamburda (Shivajinagar) of City of Pune registered with the regulatory a

EXT52100009442Mar 2021 → Mar 2022

Reason as filed by the promoterTo The Maharashtra Real Estate Regulatory Authority 109 to 113, First Floor, Sayajirao Gaikwad Udyog Bhavan, Aundh, Pune -411007 Subject: Extension of registration of Project ‘Signature Tower’ bearing No. P52100014316 Dear Sir, We hereby seeking extension till 30/09/2021 for completing building and 30/03/2022 for completing development and amenities for project ‘Signature Tower’, being constructed on Final Plot No. 425 Sub-Plot No.(b), carved out of City Survey No.1073 of old Survey No.111, Hissa No.2, situate at village Bhamburda (Shivajinagar) of City of Pune registered with the regulatory a

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC005000000064976Usha Arvind NirgudeSaarthi Realty and Infra LLP15/01/2021
CC005000000085357Ms Saarrthi Realty and Infra LLP though its partners Mr Abhijeet Vasant Shende ShendeMrs Usha Arvind Nirgude17/03/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Nov 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Nov 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Nov 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Nov 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Jul 2021

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Slgnature Tower_compressed.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Jun 23_Signature Tower.pdf19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_ST 1_compressed.pdf19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_M23_ST1.pdf18 Apr 2023
Certificates of CA (Form 3)File: Form 03 Signature Tower_compressed.pdf18 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_March23_Signature Tower1.pdf17 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2A_M23_ST1.pdf17 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No2 Signature Tower1_Dec22.pdf11 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 22_Signature Tower.pdf1 Feb 2023
Certificates of CA (Form 3)File: Form No3 Signature Tower1_Dec22.pdf1 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5_SignatureI_March22.pdf21 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Mar 22 Signature Tower I registration_Q cert.pdf10 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form No1 Signature Tower1_Sept22_c.pdf22 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No2 Signature Tower1_Sept22_c.pdf22 Oct 2022
Certificates of CA (Form 3)File: Form No3 Signature Tower1_Sept22_c.pdf22 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_ST1_June22_compressed.pdf19 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Jun 22_Signature Tower I.pdf10 Aug 2022
Certificates of CA (Form 3)File: Form3_Jun 22_Signature Tower.pdf10 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form5_March21_Signature Tower 1.pdf19 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form No1 Architect Certificates Signature Tower.pdf18 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No2 Engineer Certificates Signature Tower.pdf18 Jul 2022
Form 2AFile: Form No2A Quality Assurance Signature Tower.pdf18 Jul 2022
Certificates of CA (Form 3)File: Form No3 Signature Tower March22_c.pdf18 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 21 Signature I Ar Certificate.pdf31 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dec 21 Signature I Engg Certificate.pdf31 Jan 2022
Disclosure of sold/ booked inventoryFile: Signature RERA update (1).pdf14 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SIGNATURE-I _FORM 2A.pdf11 Nov 2021
Certificates of CA (Form 3)File: Signature Tower 1 form 3.pdf3 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FY 2019-20_Form No 5_Signature Tower1.pdf3 Nov 2021
Disclosure of sold/ booked inventoryFile: Signature-I_Discloser of Sold Unsold.pdf7 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signature-I Ar Certificate_Sept.pdf6 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SIGNATURE-I_FORM 2.pdf6 Oct 2021
Form 2AFile: SIGNATURE-I _FORM 2A.pdf6 Oct 2021
Declaration about Commencement CertificateFile: Signature -I.pdf18 Aug 2021
Disclosure of sold/ booked inventoryFile: Signature-I.pdf18 Aug 2021
Certificates of CA (Form 3)File: Signature Tower I CA Form 3.pdf15 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Signature Tower.pdf26 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Signature Tower.pdf26 Jul 2021
Form 2AFile: Signature Tower Form 2A.pdf26 Jul 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC 1- SIGNATURE TOWER.pdf19 Jul 2021
Proforma of Allotment letterFile: 1 Signature Tower_Draft.pdf2 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signature Tower 1.pdf9 Feb 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signature Tower1.pdf9 Feb 2021
Form 2AFile: Signature Tower 1.pdf9 Feb 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch cert.pdf5 Feb 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng cert.pdf5 Feb 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Signature 1.pdf18 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Signature 2.pdf18 Dec 2019
Building plan approvalFile: 02-07_compressed.pdf16 Nov 2019
Layout approvalFile: 01-07 - Layout_compressed.pdf16 Nov 2019
Copy of Layout Approval (in case of layout)File: 01-07 - Layout_compressed.pdf16 Nov 2019
Building Plan Approval (IOD)File: 02-07_compressed.pdf16 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate - Signature Tower_compressed.pdf16 Nov 2019
Form 2AFile: Engineers Certificate - Signature Tower - Form - 2A - 31-03-2019.pdf13 Apr 2019
Certificates of CA (Form 5)File: Form 5 - Signature Tower.pdf21 Dec 2018
Layout approvalFile: Layout signature (1).pdf13 Oct 2018
Copy of Layout Approval (in case of layout)File: Layout signature (1).pdf13 Oct 2018
Details of encumbrancesFile: Certificate of Registration of Charge.pdf8 Aug 2018
Details of encumbrancesFile: Index of Charges - MCA Services.pdf8 Aug 2018
Building plan approvalFile: Building layout.pdf18 Nov 2017
Layout approvalFile: building plan.pdf18 Nov 2017
Building plan approvalFile: Approval from authority.pdf18 Nov 2017
Details of encumbrancesFile: Details of Encumbarance.pdf18 Nov 2017
Copy of Layout Approval (in case of layout)File: building plan.pdf18 Nov 2017
Building Plan Approval (IOD)File: Building layout.pdf18 Nov 2017
Building Plan Approval (IOD)File: Approval from authority.pdf18 Nov 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement.pdf18 Nov 2017
PAN CardFile: Saarrthi Realty n Infra Limited - Pan Card.pdf16 Nov 2017
Copy of the legal title reportFile: title 1-6.pdf16 Nov 2017
Copy of the legal title reportFile: title 7-12.pdf16 Nov 2017
Declaration in FORM BFile: Affidavit Cum Declaration - Developer.pdf16 Nov 2017
Certificates of CA (Form 3)File: Form 3 - BOB.pdf16 Nov 2017
Proforma of Allotment letterFile: ATS_Signature Tower_Per Vijay Sir_27 10 2017_Final.pdf16 Nov 2017

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SouvenirS.NO 15- 6- 1 MAU MAHALUNGE TAL MULSHI PUNE246CompletedMay 2016Late, Jul 2017
Shimmer and ShineS NO 19 HINGNE KHURD147CompletedMar 2016Late, Apr 2016
SovereignMARUNJI TAL MULSHI PUNE259CompletedDec 2015Mar 2015
SignorS NO 273 HINJEWADI TAL MULSHI PUNE129CompletedSep 2013May 2013
Satin HillsS NO 37 BAVDHAN BK PUNE 411021101CompletedDec 2010Late, Oct 2011

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 30 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Signature Tower on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shivajinagar13,700+ in Pune

2 kmSignature TowerCompleted 20Lapsed / revoked 13Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 34 registered projects within 2 km.

Builder: Saarrthi Realty and Infra Limited Liability Partnership

Saarrthi Realty and Infra Limited Liability Partnership has 1 registration on MahaRERA, including Signature Tower. Its filings disclose 5 earlier MahaRERA projects: declares 2 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Signature Tower shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Signature Tower is delayed beyond 30 Sep 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Signature Tower?

The registered promoter entity is Saarrthi Realty and Infra Limited Liability Partnership, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Signature Tower?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Signature Tower?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Signature Tower?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Signature Tower?

The professionals named in the filing: Architect: Gohad Architect; Architect: Advantage Architects; Engineer: Design Werkz; Chartered Accountant: H N V & Co; Chartered Accountant: Nilesh M Shah & Co; Chartered Accountant: CA Saransh Dey. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Signature Tower?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Signature Tower. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Signature Tower to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.