Home / Browse projects / Aurangabad, Maharashtra / SIGNATURE 27

Completed No litigation declared Residential / Group Housing project

SIGNATURE 27

By JAGRUTSARA REALTORS LLP

RG-MH-78021 · RERA P51500054759 · Last updated on MahaRERA portal: 8 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0 of 27Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

SIGNATURE 27 is a Residential / Group Housing project by JAGRUTSARA REALTORS LLP in Aurangabad, Maharashtra, registered with MahaRERA as P51500054759 on 12 Feb 2024. The registration is recorded completed; possession was promised by 31 Dec 2028. 27 of the 27 units on this registration are recorded sold or booked, and 20 of 22 construction stages are filed complete.

At a glance

Project

  • NameSIGNATURE 27
  • TypeResidential / Group Housing
  • Location
    • GUT NO 53 PART
    • SATARA PARISAR
    • Satara (CT)
    • Aurangabad
    • 431010
  • Pincode431010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500054759
  • ReraGenie IDRG-MH-78021

Builder

  • NameJAGRUTSARA REALTORS LLP
  • Entity typePartnership
  • PartnerNilesh Sitaram Agrawal

Key dates

this monthRegisteredFeb 2024PromisedDec 2028Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on12 Feb 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed61 files

Current status

100%27 of 27 units booked
100.0%Work done, per cost certificate

Figures as on 8 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK ANA1114014
BLOCK BNA1113013

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 8 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

BLOCK A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BLOCK B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 8 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed27

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots27
Open Space27
BuildingOpen SpaceTotal
BLOCK A1414
BLOCK B1313

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,640 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Sep 2024

Approvals and building plan

Sanctioning authorityChhatrapati Sambhajinagar Municipal Corporation, Chhatrapati Sambhajinagar
Permissible FSI5579.55
Proposed, not sanctioned2,939 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDEVPRIYA APARTMENT, STATION ROAD, BANSILAL NAGAR, AURANGABAD
Estimated costRs 6.34 cr
Cost incurredRs 6.34 cr
Work done100.0%
BuildingWingEstimatedIncurred
BLOCK ANARs 2.89 crRs 2.89 cr
BLOCK BNARs 2.89 crRs 2.89 cr
-NARs 56.44 lakhRs 56.44 lakh

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANOJ KALA & ASSOCIATES
ArchitectEr Amol Kshirsagar
EngineerAmol Kshirsagar
EngineerEr. Amol Kshirsagar
EngineerDnyaneshwar Udan
EngineerER TANAJI PATIL
Chartered AccountantSD Agrawal and Associates
Chartered AccountantS D Agrawal & Associates
Chartered AccountantYogesh J Agrawal & Co
PartnerRole in project
JAGRUTSARA REALTORS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: FORM 5_JSR LLP_Signature-27.pdf8 Apr 2026
Occupational CertificateFile: completion email.pdf10 Mar 2026
Withdrawal Update Form 1File: singnature 27 form -1.pdf4 Mar 2026
Withdrawal Update Form 2File: singnature 27 form -2.pdf4 Mar 2026
Withdrawal Update Form 3File: Form 3 Dec 2025.pdf4 Mar 2026
Occupational CertificateFile: Completion Certificate.pdf4 Mar 2026
Withdrawal Update Form 1File: Form -1 Signature-27.pdf29 Nov 2025
Withdrawal Update Form 2File: Form-2 Signature-27.pdf29 Nov 2025
Withdrawal Update Form 3File: Form 3 Declaration with Form 3.pdf29 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 RERA CA Certificate of Sara Swarajya Ph-I-March 2025.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_CA Certificate_Signature-27March 2025.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Signature 27.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Signature 27.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 19-01-25.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 19-01-25.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Declaration Updated.pdf12 Dec 2024
Disclosure of sold/ booked inventoryFile: Signature 27 Sold Unsold March 2024.pdf12 Dec 2024
Disclosure of sold/ booked inventoryFile: Signature 27 Sold Unsold June 2024.pdf12 Dec 2024
Disclosure of sold/ booked inventoryFile: Signature 27 Sold Unsold Sep 2024.pdf12 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_JSR LLP_Signature-27.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signature 27 Form-1 18-07-24.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signature 27 Form-1 20-10-24.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signature 27 Form 3 Declaration.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signature 27 -Form 3 Declaration.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signature 27 Form-2 18-07-24.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signature 27 Form-2 20-10-24.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sara Signature27 Form-1 14-April-24.pdf11 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sara Signature27 Form-2 14-April-24.pdf11 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Sara Signature27 Form-2A 14-April-24.pdf11 Jun 2024
Disclosure of sold/ booked inventoryFile: Sara Signature27 Sold 31-March-24.pdf11 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sara Signature27 Form-3 15-April-24.pdf11 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations_pages-to-jpg-0001.pdf7 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Sitaram Sir Discloser.pdf30 Jan 2024
Other - LegalFile: Sale Deed INDEX II.pdf29 Jan 2024
Other - TechnicalFile: Letter about CC.pdf17 Jan 2024
Copy of the legal title reportFile: Search report signature 27.pdf28 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Adobe Scan December 05 (1).pdf26 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_CA Certificate_Signature-27 (1).pdf26 Dec 2023
Building plan approvalFile: DWG 1_compressed.pdf23 Dec 2023
Building plan approvalFile: DWG 2_compressed.pdf23 Dec 2023
Building plan approvalFile: DWG 3_compressed.pdf23 Dec 2023
Layout approvalFile: scan0949.pdf23 Dec 2023
PAN CardFile: JAGRUTSARA REALTORS PAN Card.pdf23 Dec 2023
Details of encumbrances concerned to FinanceFile: NO ENC - FIN.pdf23 Dec 2023
Details of encumbrances concerned to FinanceFile: NO ENC - LEGAL.pdf23 Dec 2023
Details of encumbrances concerned to LegalFile: NO ENC - FIN.pdf23 Dec 2023
Details of encumbrances concerned to LegalFile: NO ENC - LEGAL.pdf23 Dec 2023
Copy of Layout Approval (in case of layout)File: scan0949.pdf23 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: DWG 1_compressed.pdf23 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: DWG 2_compressed.pdf23 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: DWG 3_compressed.pdf23 Dec 2023
Declaration about Commencement CertificateFile: FORMAT-D.pdf23 Dec 2023
Declaration in FORM BFile: FORM-B.pdf23 Dec 2023
CERSAI detailsFile: CERSAI Declaration.pdf23 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Sitaramji Disc of Interest.pdf23 Dec 2023
Proforma of Allotment letterFile: MODEL DRAFT OF ALLOTMENT LETTER.pdf23 Dec 2023
Proforma of Agreement for saleFile: ATS Draft RERA.pdf23 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT-A.pdf23 Dec 2023
Deviation Report with respect to Allotment letterFile: DEVIATAION (ALLOT LETTER).pdf23 Dec 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION (AGREEMENT TO SALE).pdf23 Dec 2023
Other - LegalFile: LAND DECLARATION.pdf23 Dec 2023

How this compares with Aurangabad

100%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is completed

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep SIGNATURE 27 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SATARA PARISAR1,400+ in Aurangabad

2 kmSIGNATURE 27Completed 18Lapsed / revoked 12Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 62 registered projects within 2 km.

Builder: JAGRUTSARA REALTORS LLP

JAGRUTSARA REALTORS LLP has 1 registration on MahaRERA, including SIGNATURE 27. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if SIGNATURE 27 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIGNATURE 27?

The registered promoter entity is JAGRUTSARA REALTORS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIGNATURE 27?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SIGNATURE 27?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIGNATURE 27?

The professionals named in the filing: Architect: MANOJ KALA & ASSOCIATES; Architect: Er Amol Kshirsagar; Engineer: Amol Kshirsagar; Engineer: Er. Amol Kshirsagar; Engineer: Dnyaneshwar Udan; Engineer: ER TANAJI PATIL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIGNATURE 27?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIGNATURE 27. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIGNATURE 27 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.