Home / Browse projects / Ratnagiri, Maharashtra / Siddhivinayak Nagar PH III

Registered No litigation declared Others project

Siddhivinayak Nagar PH III

By Siddhivinayak Builders & Developers

RG-MH-35346 · RERA P52800019060 · Last updated on MahaRERA portal: 20 Jun 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
24 of 33Construction stages doneacross 3 buildings; furthest along: Stilt Floor, 90%
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Siddhivinayak Nagar PH III is a Others project by Siddhivinayak Builders & Developers in Ratnagiri, Maharashtra, registered with MahaRERA as P52800019060 on 28 Dec 2018. Possession is promised by 30 Dec 2026.

At a glance

Project

  • NameSiddhivinayak Nagar PH III
  • TypeOthers
  • Location
    • Ratnagiri Kolhapur Road
    • Shivaji Nagar
    • Ratnagiri (M Cl)
    • Ratnagiri
    • 415612
  • Pincode415612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800019060
  • ReraGenie IDRG-MH-35346

Builder

  • NameSiddhivinayak Builders & Developers
  • Entity typePartnership
  • PartnersSuresh Tarachand Gundecha, Manoj Gundecha
  • Other registrations5 more →
  • Completed1 of 6
  • Declared earlier projects4 →

Key dates

this monthRegisteredDec 2018PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Dec 2018
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed81 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 2 A B and C WingNA60000
Building No 1 A and B Wing PartlyNA50000
Building No 3 Row House 4NA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 20 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Stilt Floor, at 90%.

Building No 2 A B and C Wing81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.45%
Building No 1 A and B Wing Partly91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 3 Row House 491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes10%
Street LightingYes20%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes20%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
Building No 2 A B and C Wing11
Building No 1 A and B Wing Partly11

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,454 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Manoj GundechaRatnagiri (M Cl)Ratnagiri

Approvals and building plan

Permissible FSI5454.0
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAbhinay Jogi
EngineerManoj Joshi
PartnerRole in project
Siddhivinayak Builders & Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Dec 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Dec 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Dec 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Dec 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Jun 2025

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Siddhivinayak ph 3-Full OC.pdf20 Jun 2025
Form 1File: Form 1 Jun' 24- Signed.pdf29 May 2025
Form 2File: PH III-Form 2 - Jun'24.pdf29 May 2025
Form 3File: Siddhivinayak Phase III_Form 3_June'24.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Jun'24 Scan Copy.pdf29 May 2025
Form 1File: Form 1 Sep' 24- Signed.pdf29 May 2025
Form 2File: PH III-Form 2 - Sep'24.pdf29 May 2025
Form 3File: Form 3 - Sept-24.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Sep'24 Scan Copy.pdf29 May 2025
Form 1File: Form 1 Dec' 24 - Signed.pdf29 May 2025
Form 2File: PH III-Form 2 - Dec'24.pdf29 May 2025
Form 3File: Siddhivinayak Phase III_Form 3_Dec'24.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Dec'24 Scan Copy.pdf29 May 2025
Form 1File: Form 1 Mar' 25- Signed.pdf29 May 2025
Form 2File: PH III-Form 2 - Mar'25.pdf29 May 2025
Form 3File: PH III Revised Form 3 Mar'25.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Mar'25 Scan Copy.pdf29 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Adobe Scan 26-May-2025.pdf27 May 2025
Certificates of CA (Form 3)File: PH III Revised Form 3 Mar'25.pdf10 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FY 23-24-Q1_Form 1-RERA-240630-Signed.pdf9 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FY 23-24-Q2_Form 1-RERA-240930-Signed.pdf9 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FY 23-24-Q3_Form 1-RERA-241231-Signed.pdf9 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FY 23-24-Q4_Form 1-RERA-250331-Signed.pdf9 May 2025
Certificates of CA (Form 3)File: PH III_Form 3_Jun'23.pdf9 May 2025
Certificates of CA (Form 3)File: PH III_Form 3_Sep'23.pdf9 May 2025
Certificates of CA (Form 3)File: PH III_Form 3_Dec'23.pdf9 May 2025
Certificates of CA (Form 3)File: PH III_Form 3_Mar'24.pdf9 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PH III-Form 2 - Jun'23.pdf5 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PH III-Form 2 - Sep'23.pdf5 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PH III-Form 2 - Dec'23.pdf5 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PH III-Form 2 - Mar'24.pdf5 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PH III-Form 2 - Jun'24.pdf5 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PH III-Form 2 - Sep'24.pdf5 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PH III-Form 2 - Dec'24.pdf5 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PH III-Form 2 - Mar'25.pdf5 May 2025
Certificates of CA (Form 3)File: Form 3 Ph III - Mar'25.pdf23 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 PH III Jun'24.pdf22 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 PH III Sep'24.pdf22 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 PH III Dec'24.pdf22 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 PH III Mar'25.pdf22 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_2022-23.pdf22 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_2023-24.pdf22 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 SBD March'25.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Jun'24 Scan Copy.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Sep'24 Scan Copy.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Dec'24 Scan Copy.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Mar'25 Scan Copy.pdf20 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 SBD (FY 2023-24).pdf20 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2_Siddhivinayak Nagar PH-3_June'24.pdf18 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2_Siddhivinayak Nagar PH-3_September'24.pdf18 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2_Siddhivinayak Nagar PH-3_Dec'24.pdf18 Apr 2025
Certificates of CA (Form 3)File: Siddhivinayak Phase III_Form 3_June'24.pdf15 Apr 2025
Certificates of CA (Form 3)File: Siddhivinayak Phase III_Form 3_Dec'24.pdf15 Apr 2025
Certificates of CA (Form 3)File: Form 3 - Sept-24.pdf8 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 (01-04-2018-31-03-2019).pdf6 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 (01-04-2019-31-03-2020).pdf6 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 (01-04-2020-31-03-2021).pdf6 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 (01-04-2022-31-03-2023) (1).pdf6 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 (01-04-2021-31-03-2022) (1).pdf6 Mar 2024
Layout approvalFile: 11 LAY OUT APPROVAL.pdf20 Dec 2018
Copy of Layout Approval (in case of layout)File: 11 LAY OUT APPROVAL.pdf20 Dec 2018
Building plan approvalFile: Jumbo.pdf19 Dec 2018
Building plan approvalFile: Jumbo 2.pdf19 Dec 2018
Building plan approvalFile: Jumbo 3.pdf19 Dec 2018
Building plan approvalFile: Jumbo 4.pdf19 Dec 2018
PAN CardFile: PAN CARD.pdf19 Dec 2018
Copy of the legal title reportFile: ADV SEARCH REPORT.pdf19 Dec 2018
Details of encumbrancesFile: DETAILS OF ENCUMBRANCES.pdf19 Dec 2018
Building Plan Approval (IOD)File: Jumbo.pdf19 Dec 2018
Building Plan Approval (IOD)File: Jumbo 2.pdf19 Dec 2018
Building Plan Approval (IOD)File: Jumbo 3.pdf19 Dec 2018
Building Plan Approval (IOD)File: Jumbo 4.pdf19 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf19 Dec 2018
Declaration in FORM BFile: DECLARATION IN FORM B.pdf19 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CERTIFICATE OF ARCHITECT.pdf19 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CERTIFICATE OF ENGINEER.pdf19 Dec 2018
Certificates of CA (Form 3)File: CERTIFICATE OF CA.pdf19 Dec 2018
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf19 Dec 2018
Proforma of Allotment letterFile: AGG TO SALE BUILD 1.pdf19 Dec 2018
Proforma of Allotment letterFile: AGG TO SALE BUILD 2.pdf19 Dec 2018

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 under way, not due yet
ProjectLocationRegisteredStatusPromisedDelivered
Siddhivinayak Nagar Lilly and RoseP52800003091Ratnagiri (M Cl), RatnagiriAug 2017OngoingDec 2026Not due yet
Siddhivinayak Nagar City CenterP52800006118Ratnagiri (M Cl), RatnagiriAug 2017OngoingDec 2026Not due yet

How this compares with Ratnagiri

15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep Siddhivinayak Nagar PH III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shivaji Nagar1,100+ in Ratnagiri

2 kmSiddhivinayak Nagar PH ICompleted 55Lapsed / revoked 14Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 105 registered projects within 2 km.

Builder: Siddhivinayak Builders & Developers

Siddhivinayak Builders & Developers has 6 registrations on MahaRERA, including Siddhivinayak Nagar City Center and Siddhivinayak Nagar Lilly and Rose. Its filings disclose 4 earlier MahaRERA projects: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if Siddhivinayak Nagar PH III is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Siddhivinayak Nagar PH III?

The registered promoter entity is Siddhivinayak Builders & Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Siddhivinayak Nagar PH III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Siddhivinayak Nagar PH III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Siddhivinayak Nagar PH III?

The professionals named in the filing: Architect: Abhinay Jogi; Engineer: Manoj Joshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Siddhivinayak Nagar PH III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Siddhivinayak Nagar PH III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Siddhivinayak Nagar PH III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.