SIDDHIVINAYAK ENCLAVE

By SIDDHI DEVELOPERS

RG-MH-06069 · RERA P51700052057 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 25%
104 of 126Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

SIDDHIVINAYAK ENCLAVE is a Others project by SIDDHI DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700052057 on 19 Jul 2023. Possession is promised by 31 Dec 2028. 22 of the 126 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSIDDHIVINAYAK ENCLAVE
  • TypeOthers
  • Location
    • VIMAL DAIRY LANE
    • BHAYANDER EAST
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401105
  • Pincode401105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700052057
  • ReraGenie IDRG-MH-06069

Builder

  • NameSIDDHI DEVELOPERS
  • Entity typePartnership
  • GSTIN27AEVFS9085A1ZE
  • PartnersRAKESH MANGILAL JAIN, KUSHAL SINGH MEDTIYA
  • Other registrations9 more →
  • Completed5 of 10
  • Declared earlier projects3 →

Key dates

this monthRegisteredJul 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Jul 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed80 files

Current status

17%22 of 126 units booked
94.0%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SIDDHIVINAYAK ENCLAVE BUILDING NO 9NA22229828126

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 25%.

SIDDHIVINAYAK ENCLAVE BUILDING NO 9: 48% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,788 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jun 2025
LandownerVillageDistrict
KUSHAL SINGH MEDTIYAMira-Bhayandar (M Corp.)Thane
SHRI KUSHAL SINGH MEDTIYAMira-Bhayandar (M Corp.)Thane

Approvals and building plan

Sanctioning authorityMIRA BHAYANDER MUNICIPAL CORPORATION
Permissible FSI7363.71
Proposed, not sanctioned7,364 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHAYANDAR EAST
Estimated costRs 32.00 cr
Cost incurredRs 30.09 cr
Work done94.03%
BuildingWingEstimatedIncurred
SIDDHIVINAYAK ENCLAVE BUILDING NO 9NARs 32.00 crRs 30.09 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTEJ S CONSULTANT
EngineerRAJESH B DUBEY
EngineerSACHIN S SHIRKE
Chartered AccountantMG SHARMA & ASSOCIATES
Chartered AccountantANIL KUMAR PATWA
Chartered AccountantSHWETA JAIN & CO.
PartnerRole in project
SIDDHI DEVELOPERS-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000397922Chandraprakash Dhansinghji ChoudharyMr. KushalSingh Takhatsingh Medtiya Proprietor of M/s Aeon Enterprises20/10/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECH TEJ CONSULTANTS FORM -1.pdf20 Apr 2026
Withdrawal Update Form 2File: PROTECH CONSULTANT - FORM 2.pdf20 Apr 2026
Withdrawal Update Form 3File: Siddhi Dev Form 3 310326.pdf20 Apr 2026
Form 2A (FY 2025-2026)File: SUPERVISOR CERTIFICATE 2025-26.pdf20 Apr 2026
Withdrawal Update Form 1File: ARCHITECH TEJ CONSULTANTS FORM -1.pdf4 Feb 2026
Withdrawal Update Form 2File: PROTECH CONSULTANT - FORM 2.pdf4 Feb 2026
Withdrawal Update Form 3File: form 3 siddhi 31122025.pdf4 Feb 2026
Form 2A (FY 2024-2025)File: FORM 2A - ENGINEER CERTIFICATE 24-25.pdf18 Nov 2025
Withdrawal Update Form 1File: ARCHITECH TEJ CONSULTANTS FORM -1.pdf21 Oct 2025
Withdrawal Update Form 1File: ARCHITECH TEJ CONSULTANTS FORM -1.pdf21 Oct 2025
Withdrawal Update Form 1File: ARCHITECH TEJ CONSULTANTS FORM -1.pdf21 Oct 2025
Withdrawal Update Form 2File: PROTECH CONSULTANTS FORM - 2.pdf21 Oct 2025
Withdrawal Update Form 2File: PROTECH CONSULTANT - FORM 2.pdf21 Oct 2025
Withdrawal Update Form 2File: PROTECH CONSULTANT - FORM 2.pdf21 Oct 2025
Withdrawal Update Form 3File: FORM 3 SIDDHI.pdf21 Oct 2025
Withdrawal Update Form 3File: FORM 3 SIDDHI.pdf21 Oct 2025
Withdrawal Update Form 3File: SIDDHI FORM 3 30-9-25.pdf21 Oct 2025
Form 5 (FY 2024-2025)File: SIDDHI DEV - MARP & ASSOCIATES.pdf8 Oct 2025
Form 5 (FY 2023-2024)File: Form 5 SIDDHI DEVELOPERS.pdf27 Jun 2025
Form 1File: FORM -1 TEJ CON.pdf17 Jun 2025
Form 2File: FORM 2 PROTECH CONSULTANTS.pdf17 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD & UNSOLD.pdf17 Jun 2025
Form 3File: SIDDHI DEVELOPERS FORM-3(1).pdf17 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form -3SIDDHI DEVELOPERS.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 TEJ CON.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 PROTECH CONSULTANTS.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: 1 MB JAN'25 TO MAR'25.pdf18 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 SIDDHI DEVELOPERS.pdf20 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: siddhi developers form-3-18-01-2025 -q3.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS TEJ'S CONSULTANTS - FORM 1.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PROTECH CONSULTANTS - ENGINEER FORM 2.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD - SIDDHI 1MB SCAN.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIDDHI DEVELOPERS -Q2- FORM 3-2024-25.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1-Q2-2024-25.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER FORM 2-Q2-2024-25.pdf30 Oct 2024
Disclosure of sold/ booked inventoryFile: SIDDHI DEVELOPERS SOLD AND UNSOLD-q2-2024.pdf30 Oct 2024
Disclosure of sold/ booked inventoryFile: siddhi sold and unsold.pdf14 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Siddhi developer form 3-q1-2024 (2).pdf5 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q-1 24-25.pdf21 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q-1 24-25.pdf21 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: siddh developers form 3.pdf9 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE FORM 1.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE - FORM 2.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DocScanner 9 Feb 2024 19-06.pdf9 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A.pdf4 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DocScanner 3 Jan 2024 18-26.pdf3 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form-1 siddhi developers Q2 .pdf11 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: siddhi developersForm-2 Q2.pdf11 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: siddhi developersFORM -2A.pdf11 Dec 2023
Disclosure of sold/ booked inventoryFile: sold and unsold .pdf11 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: siddhi developers form 3.pdf11 Dec 2023
Details of encumbrances concerned to FinanceFile: DocScanner 4 Jul 2023 16-26.pdf4 Jul 2023
Details of encumbrances concerned to FinanceFile: DocScanner 4 Jul 2023 16-26.pdf4 Jul 2023
Details of encumbrances concerned to LegalFile: DocScanner 4 Jul 2023 16-26.pdf4 Jul 2023
Details of encumbrances concerned to LegalFile: DocScanner 4 Jul 2023 16-26.pdf4 Jul 2023
Copy of the legal title reportFile: TITAL REVISED.pdf30 Jun 2023
Building plan approvalFile: Typical n Refugee plan bldg no 9.pdf28 Jun 2023
Building plan approvalFile: Gr n 1st floor bldg no 9.pdf28 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Typical n Refugee plan bldg no 9.pdf28 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Gr n 1st floor bldg no 9.pdf28 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 5.pdf28 Jun 2023
Declaration in FORM BFile: form-B.pdf26 Jun 2023
Building plan approvalFile: building plan.pdf7 Jun 2023
Layout approvalFile: layout (2).pdf7 Jun 2023
PAN CardFile: PANCARD SD COMPANY.pdf7 Jun 2023
Details of encumbrances concerned to FinanceFile: NO ENCUM.pdf7 Jun 2023
Details of encumbrances concerned to LegalFile: NO ENCUM.pdf7 Jun 2023
Copy of Layout Approval (in case of layout)File: layout (2).pdf7 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: building plan.pdf7 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf7 Jun 2023
Declaration about Commencement CertificateFile: DECLARATION CC.pdf7 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf7 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGEENEER SD.pdf7 Jun 2023
CERSAI detailsFile: CRESAI .pdf7 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf7 Jun 2023
Proforma of Agreement for saleFile: SALE AGREEMENT.pdf7 Jun 2023
Proforma of Allotment letterFile: alotment.pdf7 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK ACCOUNT .pdf7 Jun 2023
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT LETTER .pdf7 Jun 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION AGREEMENT .pdf7 Jun 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SHREE HARI DARSHAN BUILDING NO-7SHOP NO 8 KRISHNA NILA CHSLBP ROAD BHAYANDER EAST1CompletedDec 2024Mar 2021

How this compares with Thane

17%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIDDHIVINAYAK ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHAYANDER EAST7,600+ in Thane

2 kmSIDDHIVINAYAK ENCLAVECompleted 51Lapsed / revoked 41Other 83Dot size: filed unitsN

Filed coordinates, straight-line distance. 175 registered projects within 2 km.

Builder: SIDDHI DEVELOPERS

SIDDHI DEVELOPERS has 10 registrations on MahaRERA, including SIDDHI COMPLEX and Pragati Residency. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SIDDHIVINAYAK ENCLAVE is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIDDHIVINAYAK ENCLAVE?

The registered promoter entity is SIDDHI DEVELOPERS, a partnership as per the filing. Its GSTIN 27AEVFS9085A1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIDDHIVINAYAK ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SIDDHIVINAYAK ENCLAVE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SIDDHIVINAYAK ENCLAVE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIDDHIVINAYAK ENCLAVE?

The professionals named in the filing: Architect: TEJ S CONSULTANT; Engineer: RAJESH B DUBEY; Engineer: SACHIN S SHIRKE; Chartered Accountant: MG SHARMA & ASSOCIATES; Chartered Accountant: ANIL KUMAR PATWA; Chartered Accountant: SHWETA JAIN & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIDDHIVINAYAK ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIDDHIVINAYAK ENCLAVE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIDDHIVINAYAK ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.