Home / Browse projects / Palghar, Maharashtra / SIDDHIVINAYAK CROWN
SIDDHIVINAYAK CROWN
RG-MH-88556 · RERA P99000011070 · Last updated on MahaRERA portal: 20 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 82 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SIDDHIVINAYAK CROWN is a Others project by SIDDHIVINAYAK DELEVOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000011070 on 31 Aug 2017. Possession is promised by 31 Dec 2028. The completion date has moved by 82 months from the original filing. 24 of the 53 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameSIDDHIVINAYAK CROWN
- TypeOthers
- Location
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401305
- Pincode401305
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000011070
- ReraGenie IDRG-MH-88556
Builder
- NameSIDDHIVINAYAK DELEVOPERS
- Entity typePartnership
- PartnersRAJNISH KISAN PATIL, JITENDRA PRABHUDAS MAKWANA, BHARAT PRABHUDAS MAKWANA
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Aug 2017
- Promised completion31 Dec 2028
- Revised completionRevised to 31 Dec 2028 (originally 28 Feb 2022)
- Buildings1 building record
- Documents filed88 files
Current status
Figures as on 20 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SIDDHIVINAYAK CROWN | NA | 4 | 4 | 11 | 42 | 53 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
SIDDHIVINAYAK CROWN: 90% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 85% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed54
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership3
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| KISAN BABURAOPATIL | Vasai-Virar City (M Corp) | Palghar |
| PRABHUDAS POPATLAL MAKWANA | Vasai-Virar City (M Corp) | Palghar |
| BHARAT P MAKWANA | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 50.00 cr | Rs 50.00 cr |
| SIDDHIVINAYAK CROWN | NA | Rs 10.95 cr | Rs 10.75 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AJAY WADE & ASSOCIATES |
| Engineer | SURESH KUMAR M PANICKER |
| Engineer | ABHISHEK LENGARE |
| Chartered Accountant | DOLLY MILAN ASHAR |
| Partner | Role in project |
|---|---|
| SIDDHIVINAYAK DELEVOPERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTHE OCCUPANCY CERTIFICATE FOR BASEMENT, GROUND, FIRST FLOOR PART & REVISED DEVELOPMENT PERMISSION FOR SECOND FLOOR PART GOT DELAYED DUE TO COVID-19, GOVERNMENT RESTRICTION ( ALL OFFICES CLOSED ).PRESENTLY WE M/S. SIDDHIVINAYAK DEVELOPERS HAVE RECEIVED REVISED DEVELOPMENT PERMISSION FOR BASEMENT + GROUND + 2 FLOORS. PLEASE FIND ATTACHED CONSENT LETTER FROM ALL THE ALLOTTEES. YOU ARE REQUESTED TO GRANT US THE DESIRED EXTENSION.
Reason as filed by the promoterThe delay in completion of the project is mainly attributable to the advanced stage of the project, wherein the application for obtaining the Occupation Certificate (OC) has already been submitted to the concerned authority. The issuance of the OC involves procedural approvals and verification processes at the authority level, which are time-consuming and beyond the direct control of the promoter. Further, certain minor balance and finishing works, including final touch-ups, services, and compliance-related activities, are still in progress to ensure that the project meets all required standar
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 May 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 May 2026Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 31 May 2023
Documents filed88
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Commencement certificateFile: RDP.pdf | 20 May 2026 |
| Building plan approval or NA orderFile: NA ORDERs.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: 3 FORM 1 Q IV_2025_26.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2 - Siddhivinayak Crown as on March 2026.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: FORM 3 march 26 Signed_organized.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1 March 26.pdf | 6 May 2026 |
| Withdrawal Update Form 1File: Form 1 March 26.pdf | 6 May 2026 |
| Withdrawal Update Form 1File: Form 1 March 26.pdf | 6 May 2026 |
| Withdrawal Update Form 2File: Form 2 - Siddhivinayak Crown as on March 2026.pdf | 6 May 2026 |
| Withdrawal Update Form 2File: Form 2 - Siddhivinayak Crown as on March 2026.pdf | 6 May 2026 |
| Withdrawal Update Form 2File: Form 2 - Siddhivinayak Crown as on March 2026.pdf | 6 May 2026 |
| Withdrawal Update Form 3File: FORM 3 march 26 Signed_organized.pdf | 6 May 2026 |
| Withdrawal Update Form 3File: FORM 3 march 26 Signed_organized.pdf | 6 May 2026 |
| Withdrawal Update Form 3File: FORM 3 march 26 Signed_organized.pdf | 6 May 2026 |
| Withdrawal Update Form 1File: Form 1 March 26.pdf | 5 May 2026 |
| Withdrawal Update Form 1File: Form 1 March 26.pdf | 5 May 2026 |
| Withdrawal Update Form 1File: Form 1 March 26.pdf | 5 May 2026 |
| Withdrawal Update Form 2File: Form 2 - Siddhivinayak Crown as on March 2026.pdf | 5 May 2026 |
| Withdrawal Update Form 2File: Form 2 - Siddhivinayak Crown as on March 2026.pdf | 5 May 2026 |
| Withdrawal Update Form 2File: Form 2 - Siddhivinayak Crown as on March 2026.pdf | 5 May 2026 |
| Withdrawal Update Form 3File: FORM 3 march 26 Signed_organized.pdf | 5 May 2026 |
| Withdrawal Update Form 3File: FORM 3 march 26 Signed_organized.pdf | 5 May 2026 |
| Withdrawal Update Form 3File: FORM 3 march 26 Signed_organized.pdf | 5 May 2026 |
| Certificates of CA (Form 3)File: CA Certificate for Q4.pdf | 15 Jul 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration abt change in bank acc.pdf | 15 Jul 2023 |
| Certificates of CA (Form 3)File: CA Certificate for Q4.pdf | 20 Jun 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC DATED 31-3-2023.pdf | 31 May 2023 |
| Certificates of CA (Form 3)File: 1 CA CERRTIFICATE Q4 UPLOAD.pdf | 26 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 19-20.pdf | 19 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 20-21.pdf | 19 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22.pdf | 19 May 2023 |
| Building plan approvalFile: Basement Ground Floor Plan.pdf | 18 May 2023 |
| Building plan approvalFile: First Floor Plan.pdf | 18 May 2023 |
| Layout approvalFile: Block Plan.pdf | 18 May 2023 |
| Copy of Layout Approval (in case of layout)File: Block Plan.pdf | 18 May 2023 |
| Building Plan Approval (IOD)File: Basement Ground Floor Plan.pdf | 18 May 2023 |
| Building Plan Approval (IOD)File: First Floor Plan.pdf | 18 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: RDP.pdf | 18 May 2023 |
| Layout approvalFile: Block Plan.pdf | 6 May 2023 |
| Building plan approvalFile: Basement Ground Floor Plan.pdf | 6 May 2023 |
| Building plan approvalFile: First Floor Plan.pdf | 6 May 2023 |
| Building plan approvalFile: Second Floor Plan.pdf | 6 May 2023 |
| Building plan approvalFile: Elevation Plan.pdf | 6 May 2023 |
| Details of encumbrancesFile: Encumbrance finance.pdf | 6 May 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance legal.pdf | 6 May 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance legal.pdf | 6 May 2023 |
| Copy of Layout Approval (in case of layout)File: Block Plan.pdf | 6 May 2023 |
| Building Plan Approval (IOD)File: Basement Ground Floor Plan.pdf | 6 May 2023 |
| Building Plan Approval (IOD)File: First Floor Plan.pdf | 6 May 2023 |
| Building Plan Approval (IOD)File: Second Floor Plan.pdf | 6 May 2023 |
| Building Plan Approval (IOD)File: Elevation Plan.pdf | 6 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: RDP.pdf | 6 May 2023 |
| Declaration about Commencement CertificateFile: declaration about cc.pdf | 6 May 2023 |
| Declaration in FORM BFile: Form B.pdf | 6 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 6 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 6 May 2023 |
| CERSAI detailsFile: CERSAI declaration.pdf | 6 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organisations.pdf | 6 May 2023 |
| Proforma of Agreement for saleFile: DRAFT AGREEMENT.pdf | 6 May 2023 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 6 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration abt separate bank account.pdf | 6 May 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation.pdf | 6 May 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Draft Agreement for sale.pdf | 6 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2021-22.pdf | 28 Mar 2023 |
| Certificates of CA (Form 3)File: NEW CA Certificate form 3.pdf | 12 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: New Form 2.pdf | 6 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 2017-18.pdf | 6 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2018-19.pdf | 6 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2019-20.pdf | 6 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2020-21.pdf | 6 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2021-22.pdf | 6 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: New Form 1 Architect Cert.pdf | 1 Mar 2023 |
| Details of encumbrancesFile: ENCUMBRANCE 2.pdf | 11 Mar 2022 |
| Building plan approvalFile: Plan.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: Plan.pdf | 31 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aritech certificate.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aritech Annexure.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 31 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 88 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SIDDHIVINAYAK CROWN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Palghar3,200+ in Palghar
Filed coordinates, straight-line distance. 167 registered projects within 2 km.
AV PEARL BLDG NO.4 WING BCD
AVM BUILDCON LLP
HARI RESIDENCY PHASE I
LOTUS LAKSHMINARAYAN HOMES
Mrida Innovista Homes
NINE MEGACORP DEVELOPERS LLP
AV PEARL BUILDING NO. 3, C WING
AVM BUILDCON LLP
MJV CORPORATION
VYANKATI CHINNAVISHRWAPAPA SAMAKOTI
AV PEARL BUILDING NO. 3, WING B
SHREE SAI JIVDANI DEVELOPERS LLP
See every Palghar project, with the district possession charts
Builder: SIDDHIVINAYAK DELEVOPERS
SIDDHIVINAYAK DELEVOPERS has 1 registration on MahaRERA, including SIDDHIVINAYAK CROWN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if SIDDHIVINAYAK CROWN is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SIDDHIVINAYAK CROWN?
The registered promoter entity is SIDDHIVINAYAK DELEVOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SIDDHIVINAYAK CROWN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SIDDHIVINAYAK CROWN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SIDDHIVINAYAK CROWN?
The professionals named in the filing: Architect: AJAY WADE & ASSOCIATES; Engineer: SURESH KUMAR M PANICKER; Engineer: ABHISHEK LENGARE; Chartered Accountant: DOLLY MILAN ASHAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SIDDHIVINAYAK CROWN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback