Home / Browse projects / Thane, Maharashtra / SIDDHI YASHWANT COMPLEX
SIDDHI YASHWANT COMPLEX
RG-MH-66215 · RERA P51700014443 · Last updated on MahaRERA portal: 23 Jan 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
- 6 complaints at MahaRERA
- Completion date moved by 72 months
- 8 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SIDDHI YASHWANT COMPLEX is a Others project by SIDDHARTH NARAYAN TANGDI in Thane, Maharashtra, registered with MahaRERA as P51700014443 on 2 Dec 2017. Possession was promised by 31 Dec 2024 and is now 22 months past that date. The completion date has moved by 72 months from the original filing. 6 complaints are on record with the regulator.
At a glance
Project
- NameSIDDHI YASHWANT COMPLEX
- TypeOthers
- Location
- OLD AGRA ROAD
- VILLAGE-KAMATGHAR
- Chavindra
- Thane
- 421302
- Pincode421302
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700014443
- ReraGenie IDRG-MH-66215
Builder
- NameSIDDHARTH NARAYAN TANGDI
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on2 Dec 2017
- Promised completion31 Dec 2024
- Revised completionRevised to 31 Dec 2024 (originally 31 Dec 2018)
- Buildings3 building records
- Documents filed58 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SIDDHI YASHWANT COMPLEX BLDG A | NA | 8 | 0 | 0 | 0 | 0 |
| SIDDHI YASHWANT COMPLEX BLDG B | NA | 8 | 0 | 0 | 0 | 0 |
| SIDDHI YASHWANT COMPLEX BLDG C | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 23 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
17 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 90%.
SIDDHI YASHWANT COMPLEX BLDG A89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
SIDDHI YASHWANT COMPLEX BLDG B63%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
SIDDHI YASHWANT COMPLEX BLDG C53%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 15% |
Progress on shared amenities15
As on 23 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 20% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 50% |
Parking filed13
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| SIDDHI YASHWANT COMPLEX BLDG A | 1 | 10 | 11 |
| SIDDHI YASHWANT COMPLEX BLDG B | 1 | 0 | 1 |
| SIDDHI YASHWANT COMPLEX BLDG C | 1 | 0 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KK CONSULTANT |
| Engineer | KK CONSULTANT |
| Partner | Role in project |
|---|---|
| SIDDHARTH NARAYAN TANGDI | - |
Extensions applied for8
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDear Sir/Madam , Currently The Project is Running With Works in Full Swing With A Building OC applied -( Application Copy is attached & Uploaded Herewith ) and Possession is Expected in Next 10 Days with approx. 99% Work Now Completed. B & C Building is also Nearing Its Completion with Internal Works , Plumbing Works and Lift Work Going On. and Thus , Due to upcoming Heavy rainy Season , We will Require Some More time to Construct and Complete The same Finishing Works. Thus We Kindly Request You To Consider a Six Months Extension to us for the Same Work to be Completed.
Reason as filed by the promoterDear Sir/Madam , Ref. to Our Project : Siddhi Yashwant Complex : Rera No. : P51700014443. , We Hereby Kindly Request “ Maha Rera “ Authorities For One Year Extension of the Project as : (1) Currently The Project is Running With Works in Full Swing With A Building OC applied -( Application Copy is attached & Uploaded Herewith ) and Possession Process is Getting Started with 100% Work Now Completed. B & C Building is also Nearing Its Completion with Internal Works , Plumbing Works and Lift Work Going On. (2) As Per Revised Govt. Norms , New FSI Has Been Approved in Our Area and Thus We Have appl
Reason as filed by the promoterNo expected sales & COVID conditions non availablety of lebour
Reason as filed by the promoterBECAUSE OF COVID PANDEMIC SLOW DOUN IN SALE AND CANCELETION OF FLATS REPAYMENTS PROJECT DELYED WE ARE TRYING OUR BEST TO HAND OVER POSSETION AT EARLIEST
Reason as filed by the promoterWE ARE FECEING FAINANCIAL CRUNCH LOWERED SALE OF FLATS HIGH TAXETION
Reason as filed by the promoterDUE TO COVIDE19 PANDEMIC WE ARE FALLING SHORT OF FUNDS AS BANK IS NOT DISBUSSING LOANS.
Reason as filed by the promoterTHE SALE OF BALANCE FLATS IN OUR POSSETION NOT SOLD BECAUSE OF POST GST & MARKETS FINANCIAL CRUNCH BUT STILL WE ARE TRYING OUR BEST TO COMPLETE THE PROJECT IN NEW EXTENDED DATE THANKS FOR SUPPORT & OUR VALUBLE COUSTOMER SUPPORT
Reason as filed by the promoterDear Sir/Madam , Ref. to Our Project : Siddhi Yashwant Complex : Rera No. : P51700014443. , We Hereby Kindly Request “ Maha Rera “ Authorities For One Year Extension of the Project as : (1) Currently The Project is Running With Works in Full Swing With A Building OC applied -( Application Copy is attached & Uploaded Herewith ) and Possession Process is Getting Started with 100% Work Now Completed. B & C Building is also Nearing Its Completion with Internal Works , Plumbing Works and Lift Work Going On. (2) As Per Revised Govt. Norms , New FSI Has Been Approved in Our Area and Thus We H
Complaints filed with MahaRERA6
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000199047 | Mr, BRIJLAL RAMDIHAL PATEL | SIDDHARTH NARAYAN TANGDII | 15/11/2021 |
| CC006000000396933 | Kirit Bhailal Rajgor | M/s. Sky Real Estate Developers and Builders | 09/08/2023 |
| CC006000000397257 | Mahendar Saylu Bachali | Mr. Siddharth Narayan Tangdi | 06/10/2023 |
| CC006000000397568 | SANDEEP SHIVRAM GUPTA | SIDDHARTH NARAYAN TANGDI | 26/09/2023 |
| CC12503464 | SRINIVAS LAXMIRAJAM YERRAGUNTLA | SIDDHARTH NARAYAN TANGDI | 28/09/2025 |
| CC12503558 | RAJAMALLU NARSAIAH YENNAM | SIDDHARTH NARAYAN TANGDI | 06/10/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Jul 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Nov 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Nov 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed58
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration in FORM BFile: FORM-B.pdf | 23 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD-12122024.pdf | 28 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A2324.pdf | 28 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A2425.pdf | 28 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM D.pdf | 27 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: sky-form5-o.pdf | 27 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A Nov22 to MAR 2023-FY2022-23.pdf | 27 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A Apr23 to Nov 2023-FY2022-23.pdf | 27 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM2A.pdf | 21 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 31032023.pdf | 21 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 20122023.pdf | 21 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM5_RERA.pdf | 21 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 FY202122.pdf | 29 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1.pdf | 28 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM2A.pdf | 28 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf | 28 Nov 2022 |
| OtherFile: Sold-Unsold Units Disclosure.pdf | 23 Jun 2022 |
| OtherFile: Undertaking For Cresai Certificate.pdf | 23 Jun 2022 |
| OtherFile: Cresai-Assett Based Search Report.pdf | 23 Jun 2022 |
| OtherFile: Undertaking For Cresai Certificate.pdf | 23 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers Certificate on Quality Assurance (Form 2A FY 2021-22).pdf | 22 Jun 2022 |
| CERSAI detailsFile: Cresai-Assett Based Search Report.pdf | 22 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold Units Disclosure.pdf | 22 Jun 2022 |
| CERSAI detailsFile: Cresai-Assett Based Search Report.pdf | 22 Jun 2022 |
| CERSAI detailsFile: Undertaking For Cresai Certificate.pdf | 22 Jun 2022 |
| OtherFile: Engineers Certificate on Quality Assurance (Form 2A FY 2021-22).pdf | 22 Jun 2022 |
| OtherFile: Rera Extension Application.pdf | 22 Jun 2022 |
| OtherFile: Resolution of Allottees.pdf | 22 Jun 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: cc_finalupto6.pdf | 15 Jul 2021 |
| Declaration about Commencement CertificateFile: Declaration About CC-Form D.pdf | 15 Jul 2021 |
| OtherFile: Declaration About CC-Form D.pdf | 15 Jul 2021 |
| Copy of the legal title reportFile: Legal Title Report-Format A.pdf | 13 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2A-Q1-Jun21-Sign.pdf | 13 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY SIGNED.pdf | 6 Jul 2021 |
| Declaration about Commencement CertificateFile: CC.pdf | 5 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2020.pdf | 5 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2021.pdf | 5 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2019.pdf | 5 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2020.pdf | 5 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2021.pdf | 5 Jul 2021 |
| Certificates of CA (Form 5)File: RERA SKY FORM 5.pdf | 1 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng cert.pdf | 28 Nov 2017 |
| Building plan approvalFile: Sanctioned plan.pdf | 27 Nov 2017 |
| Layout approvalFile: Sanctioned plan.pdf | 27 Nov 2017 |
| Details of encumbrancesFile: ENCUMBRANCE LETTER.pdf | 27 Nov 2017 |
| Copy of Layout Approval (in case of layout)File: Sanctioned plan.pdf | 27 Nov 2017 |
| Building Plan Approval (IOD)File: Sanctioned plan.pdf | 27 Nov 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Permission.pdf | 27 Nov 2017 |
| Declaration in FORM BFile: Affidavit Cum Declaration.pdf | 27 Nov 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate.pdf | 27 Nov 2017 |
| Certificates of CA (Form 3)File: CA certificate.pdf | 27 Nov 2017 |
| Proforma of Allotment letterFile: letter of allotment.pdf | 27 Nov 2017 |
| Proforma of Allotment letterFile: Sale Agreement Part - 01.pdf | 27 Nov 2017 |
| Proforma of Allotment letterFile: Sale Agreement Part - 02.pdf | 27 Nov 2017 |
| Proforma of Allotment letterFile: Sale Agreement Part - 03.pdf | 27 Nov 2017 |
| PAN CardFile: PAN CARD.pdf | 30 Jul 2017 |
| Copy of the legal title reportFile: FINAL TITAL CERTIFICATE.pdf | 30 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: COMENCEMNET CERTIFICATE.pdf | 30 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 58 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SIDDHI YASHWANT COMPLEX on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VILLAGE-KAMATGHAR7,600+ in Thane
Filed coordinates, straight-line distance. 93 registered projects within 2 km.
GODREJ UPAVAN
PRAKHHYAT DWELLINGS LLP
DGT - Sector 3A - Cluster 2 - Phase 1
ADRIKA DEVELOPERS PRIVATE LIMITED
DOSTI GREATER THANE - PHASE 1
ADRIKA DEVELOPERS PRIVATE LIMITED
Dosti Greater Thane - Sector 3A - Cluster 1B -
ADRIKA DEVELOPERS PRIVATE LIMITED
USHA RESIDENCY
SHREE BUDHDEV INFRA
NARAYANI DHAM BUILDING NO 2A AND 2B
MAYA DEVELOPER
See every Thane project, with the district possession charts
Builder: SIDDHARTH NARAYAN TANGDI
SIDDHARTH NARAYAN TANGDI has 1 registration on MahaRERA, including SIDDHI YASHWANT COMPLEX. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that SIDDHI YASHWANT COMPLEX shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SIDDHI YASHWANT COMPLEX is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SIDDHI YASHWANT COMPLEX?
The registered promoter entity is SIDDHARTH NARAYAN TANGDI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SIDDHI YASHWANT COMPLEX?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SIDDHI YASHWANT COMPLEX?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SIDDHI YASHWANT COMPLEX?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SIDDHI YASHWANT COMPLEX?
The professionals named in the filing: Architect: KK CONSULTANT; Engineer: KK CONSULTANT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SIDDHI YASHWANT COMPLEX?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback