ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SIDDHI NISARG C BUILDING

Registered No litigation declared Residential / Group Housing project

SIDDHI NISARG C BUILDING

By SIDDHI NISARG ASSOCIATES

RG-MH-95757 · RERA P52100052910 · Last updated on MahaRERA portal: 20 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
3 of 95Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

SIDDHI NISARG C BUILDING is a Residential / Group Housing project by SIDDHI NISARG ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100052910 on 5 Oct 2023. Possession is promised by 31 Dec 2026. 92 of the 95 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameSIDDHI NISARG C BUILDING
  • TypeResidential / Group Housing
  • Location
    • WAKAD-HINJEWADI ROAD
    • WAKAD
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100052910
  • ReraGenie IDRG-MH-95757

Builder

  • NameSIDDHI NISARG ASSOCIATES
  • Entity typePartnership
  • PartnerPRAVIN JAYANTIBHAI POKAR

Key dates

this monthRegisteredOct 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed98 files

Current status

97%92 of 95 units booked
100.0%Work done, per cost certificate

Figures as on 20 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C BUILDINGNA141295095

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

C BUILDING: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed95

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots95
Closed/Covered95

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,705 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jul 2025
LandownerVillageDistrict
Vijay Keshavlal SarafPune (M Corp.)Pune
Jaiprakash Pravinchandra ShroffPune (M Corp.)Pune
Sarita Dhanesh DhadiwalRavetPune

Approvals and building plan

Sanctioning authorityPimpri -Chinchwad Muncipal Corporation
Permissible FSI8473.1
Proposed, not sanctioned8,473 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOLD MUMBAI-PUNE HIGHWAY, PIMPRI COLONY,MIDC,PIMPRI CHINCHWAD
Estimated costRs 23.02 cr
Cost incurredRs 23.02 cr
Work done100.0%
BuildingWingEstimatedIncurred
C BUILDINGNARs 21.18 crRs 21.18 cr
-NARs 1.84 crRs 1.84 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMAHENDRA THAKUR
EngineerMANESH RAGHUJI KADAM
Chartered AccountantMuttha & Lahoti Chartered Accountant
Chartered AccountantMuttha and Lahoti Chartered Accountant
Chartered AccountantM. K. CHHAJED & CO.
PartnerRole in project
SIDDHI NISARG ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf20 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf20 Jun 2026
Withdrawal Update Form 3File: FORM 3-UPLOAD.pdf20 Jun 2026
Withdrawal Update Form 1File: Form 1 Architect certificate.pdf3 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineers certificate (2).pdf3 Feb 2026
Withdrawal Update Form 3File: form 3 - SNA.pdf3 Feb 2026
Form 1File: Form 1.pdf28 Jan 2026
Form 2File: Form 2.pdf28 Jan 2026
Form 3File: Form 3.pdf28 Jan 2026
Disclosure of Sold and Booked InventoryFile: Units.pdf28 Jan 2026
Form 1File: Form 1.pdf28 Jan 2026
Form 2File: FORM 2.pdf28 Jan 2026
Form 3File: Form 3.pdf28 Jan 2026
Disclosure of Sold and Booked InventoryFile: Units.pdf28 Jan 2026
Form 1File: Form 1.pdf28 Jan 2026
Form 2File: Form 2.pdf28 Jan 2026
Form 3File: Form 3.pdf28 Jan 2026
Disclosure of Sold and Booked InventoryFile: Units.pdf28 Jan 2026
Form 1File: Form 1.pdf28 Jan 2026
Form 2File: Form 2.pdf28 Jan 2026
Form 3File: Form 3.pdf28 Jan 2026
Disclosure of Sold and Booked InventoryFile: Units Unsold.pdf28 Jan 2026
Form 1File: Form 1.pdf28 Jan 2026
Form 2File: Form 2.pdf28 Jan 2026
Form 3File: Form 3.pdf28 Jan 2026
Disclosure of Sold and Booked InventoryFile: Units.pdf28 Jan 2026
Form 1File: FORM 1_compressed.pdf28 Jan 2026
Form 2File: FORM 2.pdf28 Jan 2026
Form 3File: Form 3.pdf28 Jan 2026
Disclosure of Sold and Booked InventoryFile: Units.pdf28 Jan 2026
Form 5 (FY 2024-2025)File: Form 5_251014_005421_Siddhi Nisarg.pdf29 Oct 2025
Withdrawal Update Form 1File: 01 architect certificate Form 1.pdf18 Oct 2025
Withdrawal Update Form 2File: 02 Engineeru0027s certificate Q2.pdf18 Oct 2025
Withdrawal Update Form 3File: 03 CA certificate Form 3.pdf18 Oct 2025
Withdrawal Update Form 1File: Form 1.pdf30 Jul 2025
Withdrawal Update Form 2File: Engineeru0027s certificate Form-2.pdf30 Jul 2025
Withdrawal Update Form 3File: FORM 3 CA certificate.pdf30 Jul 2025
Withdrawal Update Form 1File: Form 1.pdf29 Jul 2025
Withdrawal Update Form 2File: Engineeru0027s certificate Form-2.pdf29 Jul 2025
Withdrawal Update Form 3File: FORM 3 CA certificate.pdf29 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architech certificate.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: siddhi nisarg engeenier certificate.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHI CER SIDDHI.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3- SNA_compressed.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CER SIDDHI.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SNA FORM 1.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SNA FORM 3.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SNA FORM 2.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: SNA DISC.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Siddhi Nisarg - FORM 5.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_c.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SNA FORM 1.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SNA FORM 2.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: SNA SOLD UNSOLD.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SNA FORM 3-compressed.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SNA.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Siddhi Form 2.pdf17 Jan 2024
Disclosure of sold/ booked inventoryFile: Siddhi Inventory updation.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SNA.pdf17 Jan 2024
Other - LegalFile: Siddhinisarg Rera Mail.pdf29 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest AS PER YOUR QUERRY.pdf21 Aug 2023
Proforma of Agreement for saleFile: Draft ATS Siddhi Nisarg C Bld 2023.pdf30 Jul 2023
Deviation Report with respect to model copy of AgreementFile: Deviation ATS Siddhi Nisarg 2023.pdf30 Jul 2023
Layout approvalFile: Final Layout Plan as per recomandation of SRO.pdf19 Jul 2023
Copy of Layout Approval (in case of layout)File: Final Layout Plan as per recomandation of SRO.pdf19 Jul 2023
Other - TechnicalFile: Architect letter as per recomandation of SRO.pdf19 Jul 2023
Layout approvalFile: Copy of Layout PCMC Approval.pdf13 Jul 2023
Layout approvalFile: Layout building C as per Rera Reuirment.pdf13 Jul 2023
Copy of Layout Approval (in case of layout)File: Copy of Layout PCMC Approval.pdf13 Jul 2023
Copy of Layout Approval (in case of layout)File: Layout building C as per Rera Reuirment.pdf13 Jul 2023
Building plan approvalFile: PLAN 1.pdf27 Jun 2023
Building plan approvalFile: PLAN 2.pdf27 Jun 2023
Building plan approvalFile: PLAN 3.pdf27 Jun 2023
Details of encumbrances concerned to FinanceFile: FINANCIAL ENCUMBRANCE.pdf27 Jun 2023
Details of encumbrances concerned to LegalFile: FINANCIAL ENCUMBRANCE.pdf27 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN 1.pdf27 Jun 2023

How this compares with Pune

97%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIDDHI NISARG C BUILDING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAKAD13,700+ in Pune

2 kmSIDDHI NISARG C BUILDINGCompleted 91Lapsed / revoked 34Other 66Dot size: filed unitsN

Filed coordinates, straight-line distance. 191 registered projects within 2 km.

Builder: SIDDHI NISARG ASSOCIATES

SIDDHI NISARG ASSOCIATES has 1 registration on MahaRERA, including SIDDHI NISARG C BUILDING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SIDDHI NISARG C BUILDING is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIDDHI NISARG C BUILDING?

The registered promoter entity is SIDDHI NISARG ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIDDHI NISARG C BUILDING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SIDDHI NISARG C BUILDING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIDDHI NISARG C BUILDING?

The professionals named in the filing: Architect: MAHENDRA THAKUR; Engineer: MANESH RAGHUJI KADAM; Chartered Accountant: Muttha & Lahoti Chartered Accountant; Chartered Accountant: Muttha and Lahoti Chartered Accountant; Chartered Accountant: M. K. CHHAJED & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIDDHI NISARG C BUILDING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIDDHI NISARG C BUILDING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIDDHI NISARG C BUILDING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.