Home / Browse projects / Mumbai Suburban, Maharashtra / Siddhanta 180

Registered No litigation declared Residential / Group Housing project

Siddhanta 180

By Praneeta Infrastructure LLP

RG-MH-76144 · RERA P51800050026 · Last updated on MahaRERA portal: 19 Aug 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 24 months from the original
1 of 11Construction stages donefurthest along: Basement (if any), 80%
6 of 6Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

Siddhanta 180 is a Residential / Group Housing project by Praneeta Infrastructure LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050026 on 6 Mar 2023. Possession is promised by 30 Jun 2027. The completion date has moved by 24 months from the original filing. 0 of the 6 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSiddhanta 180
  • TypeResidential / Group Housing
  • Location
    • SHRADHANAND ROAD
    • VILE PARLE
    • Vileparle
    • Andheri
    • Mumbai Suburban
    • 400057
  • Pincode400057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800050026
  • ReraGenie IDRG-MH-76144

Builder

  • NamePraneeta Infrastructure LLP
  • Entity typePartnership
  • Partnersmanoj pardasany, ARVIND BHASIN

Key dates

this monthRegisteredMar 2023First promiseJun 2025Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Mar 2023
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed79 files

Current status

0%0 of 6 units booked

Figures as on 19 Aug 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SIDDHANTA 180NA90156

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 80%.

SIDDHANTA 180: 29% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor60%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area446 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Jul 2025
LandownerVillageDistrict
SHRADHA COOPERATIVE HOUSING SOCIETY LTDVileparleMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1925.62
Proposed, not sanctioned817 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHANUMAN ROAD, VILE PARLE EAST

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr.Ujjwal Bhole
EngineerShri. Kaivant C. Shah.
Engineerrutuja patil
Chartered AccountantJRSM & Associates
PartnerRole in project
Praneeta Infrastructure LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA24062501722Jun 2025 → Jun 2027

Reason as filed by the promoterWe request your goodself to grant permission to extend the project as there has been a delay in obtaining permissions from the planning authority. We hereby confirm that the project shall be completed by the proposed extended due date.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12503419Adesh Narhari ShirkePraneeta Infrastructure LLP24/09/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 3File: praneeta form 3_SIGNED.pdf19 Aug 2025
Form 1File: RERA FORM 1 SIDDHANTA 180_SEP 23.pdf19 Aug 2025
Form 2File: FORM 2 RERA SIDDHANTA 180_Sep 2023.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: RERA UPLOAD.pdf19 Aug 2025
Form 1File: RERA FORM 1 SIDDHANTA 180_JUNE 23.pdf19 Aug 2025
Form 2File: FORM 2 ENGINEERING CERTIFICATE SIDDHANTA 180.pdf19 Aug 2025
Form 3File: praneeta - sep form 3.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: RERA UPLOAD.pdf19 Aug 2025
Form 1File: RERA FORM 1 SIDDHANTA 180_SEP 23.pdf19 Aug 2025
Form 2File: FORM 2 RERA SIDDHANTA 180_Sep 2023.pdf19 Aug 2025
Form 3File: praneeta - sep form 3.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: RERA UPLOAD.pdf19 Aug 2025
Form 1File: FORM 1 RERA SIDDHANTA 180_Dec 2023.pdf19 Aug 2025
Form 2File: FORM 2 RERA SIDDHANTA 180_Sep 2023.pdf19 Aug 2025
Form 3File: Praneeta_Signed Form 3.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: RERA UPLOAD.pdf19 Aug 2025
Form 3File: praneeta - june form 3.pdf19 Aug 2025
Form 1File: RERA FORM 1 SIDDHANTA 180_JUNE 23.pdf19 Aug 2025
Form 2File: FORM 2 RERA SIDDHANTA 180_June 2023.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: RERA UPLOAD.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: RERA UPLOAD.pdf19 Aug 2025
Form 1File: praneeta - sep form 3.pdf19 Aug 2025
Form 2File: FORM 2 RERA SIDDHANTA 180_Sep 2023.pdf19 Aug 2025
Form 3File: praneeta - sep form 3.pdf19 Aug 2025
Form 1File: Form 1_June 2025.pdf19 Aug 2025
Form 2File: FORM 2 RERA SIDDHANTA 180_June 25.pdf19 Aug 2025
Form 3File: Form 3_June 25.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsold declaration_june 2025.pdf19 Aug 2025
Form 1File: Form 1_June 2025.pdf19 Aug 2025
Form 2File: FORM 2 RERA SIDDHANTA 180_June 25.pdf19 Aug 2025
Form 3File: Form 3_June 25.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsold declaration_june 2025.pdf19 Aug 2025
Form 1File: Form 1_June 2025.pdf19 Aug 2025
Form 2File: FORM 2 RERA SIDDHANTA 180_June 25.pdf19 Aug 2025
Form 3File: Form 3_June 25.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsold declaration_june 2025.pdf19 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: praneeta form 3_SIGNED.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RERA SIDDHANTA 180_June 2023.pdf21 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RERA SIDDHANTA 180_Sep 2023.pdf21 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RERA SIDDHANTA 180_June 2023.pdf21 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RERA SIDDHANTA 180_Sep 2023.pdf21 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 SIDDHANTA 180_Sep 2023.pdf21 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIDDHANTA 180_June 2023.pdf21 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIDDHANTA 180_Dec 2023.pdf21 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 SIDDHANTA 180 ( JUNE23).pdf6 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 SIDDHANTA 180 (SEP 23).pdf6 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: praneeta - june form 3.pdf6 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: praneeta - sep form 3.pdf6 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_signed.pdf31 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1.pdf29 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2.pdf29 Jan 2024
Disclosure of sold/ booked inventoryFile: Final List of Soldunsold Flat (Siddhanta 180).pdf29 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERING CERTIFICATE SIDDHANTA 180.pdf29 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Praneeta_Signed Form 3.pdf29 May 2023
Proforma of Agreement for saleFile: Draft AFS_new.pdf13 Feb 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation Certificate of Agreement For Sale.pdf13 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3_final.pdf10 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_Final.pdf10 Feb 2023
Proforma of Allotment letterFile: Allotment Letter Praneeta Infrastructure LLP.pdf7 Feb 2023
Details of encumbrances concerned to FinanceFile: Declration Of Finance new.pdf6 Feb 2023
Details of encumbrances concerned to FinanceFile: Declaration Of LegaL new.pdf6 Feb 2023
Details of encumbrances concerned to LegalFile: Declration Of Finance new.pdf6 Feb 2023
Details of encumbrances concerned to LegalFile: Declaration Of LegaL new.pdf6 Feb 2023
CERSAI detailsFile: asset based.pdf6 Feb 2023
Deviation Report with respect to Allotment letterFile: Deviation certificate of allotment letter.pdf6 Feb 2023
Copy of the legal title reportFile: Search report.pdf1 Feb 2023
CERSAI detailsFile: CERSAI.pdf1 Feb 2023
Details of encumbrances concerned to FinanceFile: No Legal Encumbrance.pdf30 Jan 2023
Details of encumbrances concerned to LegalFile: No Legal Encumbrance.pdf30 Jan 2023
Layout approvalFile: IOD.pdf27 Jan 2023
Building plan approvalFile: Plan Copy.pdf27 Jan 2023
PAN CardFile: Praneeta PAN.pdf27 Jan 2023
Copy of the legal title reportFile: Title Report (1).pdf27 Jan 2023
Copy of Layout Approval (in case of layout)File: IOD.pdf27 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan Copy.pdf27 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: 2346729_FirstCC_signed (1).pdf27 Jan 2023
Declaration about Commencement CertificateFile: CC Declaration.pdf27 Jan 2023
Declaration in FORM BFile: Form B AFFIDAVIT CUM DECLARATION.pdf27 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank details of Current Account.pdf27 Jan 2023

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Siddhanta 180 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILE PARLE6,700+ in Mumbai Suburban

2 kmSiddhanta 180Completed 157Lapsed / revoked 74Other 146Dot size: filed unitsN

Filed coordinates, straight-line distance. 377 registered projects within 2 km.

Builder: Praneeta Infrastructure LLP

Praneeta Infrastructure LLP has 1 registration on MahaRERA, including Siddhanta 180. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Siddhanta 180 is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Siddhanta 180?

The registered promoter entity is Praneeta Infrastructure LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Siddhanta 180?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Siddhanta 180?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Siddhanta 180?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Siddhanta 180?

The professionals named in the filing: Architect: Mr.Ujjwal Bhole; Engineer: Shri. Kaivant C. Shah.; Engineer: rutuja patil; Chartered Accountant: JRSM & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Siddhanta 180?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Siddhanta 180. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Siddhanta 180 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.