Home / Browse projects / Mumbai City, Maharashtra / Siddha Sky Phase 3

Registered No litigation declared Residential / Group Housing project

Siddha Sky Phase 3

By M/s. Sejal Shakti Realtors LLP

RG-MH-03420 · RERA P51900021044 · Last updated on MahaRERA portal: 25 Aug 2026

Source: official MahaRERA filing

Red flags

  • 4 complaints at MahaRERA
  • Completion date moved by 7 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 7 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 15%
54 of 357Units unsoldnot recorded sold or booked
4Complaints at MahaRERAon this registration
Jump to the 348 documents Report an error

Siddha Sky Phase 3 is a Residential / Group Housing project by M/s. Sejal Shakti Realtors LLP in Mumbai City, Maharashtra, registered with MahaRERA as P51900021044 on 31 May 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 7 months from the original filing. 303 of the 357 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 4 complaints are on record with the regulator.

At a glance

Project

  • NameSiddha Sky Phase 3
  • TypeResidential / Group Housing
  • Location
    • Mukund Rao Ambedkar Marg
    • Raoli Camp Kokri Nagar
    • Sardar Nagar No. 4
    • GTB Monorail Station
    • Mumbai City
    • 400037
  • Pincode400037
  • RERA no.P51900021044
  • ReraGenie IDRG-MH-03420

Builder

  • NameM/s. Sejal Shakti Realtors LLP
  • Entity typeOthers
  • Named personsSanjay Jain, Samyak Jain, Siddha Real Estate Development Private Limited, Siddha Projects Private Limited, M/S Pravesh Nirman LLP, Ashish Karia
  • Other registrations1 more →

Key dates

this monthRegisteredMay 2019First promiseMay 2026Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 May 2019
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 May 2026)
  • Buildings1 building record
  • Documents filed348 files

Current status

85%303 of 357 units booked
95.4%Work done, per cost certificate

Figures as on 25 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Siddha Sky Phase 3NA463932829357

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 15%.

Siddha Sky Phase 3: 47% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area983 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI24804.74
Proposed, not sanctioned24,805 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKandivali West
Estimated costRs 154.64 cr
Cost incurredRs 147.46 cr
Work done95.36%
BuildingWingEstimatedIncurred
Siddha Sky Phase 3NARs 154.64 crRs 147.46 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDOT Architects
EngineerArijit Malik
EngineerBasant H Jha
Chartered AccountantKshitij Shah
Chartered AccountantDamle Dhandhania & Co
PartnerRole in project
M/s. Sejal Shakti Realtors LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900013777May 2026 → Dec 2026

Reason as filed by the promoterWe hereby state to submit all necessary document during personal hearing for the extension of date for your satisfaction and approval We are just seeking the small extension for 7 months for the project, As by taking extension of 7 months, no allottees shall be effected Have taken consent of 140 allottees. Total 52% consent have taken it for the extension. Request to kindly grant the same

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC006000000199346Rajkumar ShirkeSejal Shakti Realtors LLP09/12/2021
CC12502347Prasanta Kumar SinhaM/s. Sejal Shakti Realtors LLP10/07/2025
CC12503042M/s. Sejal Shakti Realtors LLPMrs PISTA NAGRAJ JAIN29/08/2025
CC12503084M/s. Sejal Shakti Realtors LLPMrs JAGRUTI NITESH JAIN02/09/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Sep 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed348

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 348 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5 25 - 26.pdf25 Aug 2026
Form 5 (FY 2024-2025)File: Form 5 24 - 25.pdf25 Aug 2026
Form 5 (FY 2023-2024)File: Form 5 23-24.PDF25 Aug 2026
Form 5 (FY 2022-2023)File: Form 5 22-23.PDF25 Aug 2026
Form 5 (FY 2021-2022)File: Form 5 22-23.PDF25 Aug 2026
Form 5 (FY 2020-2021)File: Form 5 22-23.PDF25 Aug 2026
Form 5 (FY 2019-2020)File: Form 5 22-23.PDF25 Aug 2026
Form 2A (FY 2019-2020)File: Form 2A 2024-2025.pdf24 Aug 2026
Form 2A (FY 2020-2021)File: Form 2A 2024-2025.pdf24 Aug 2026
Form 2A (FY 2021-2022)File: Form 2A 2024-2025.pdf24 Aug 2026
Form 2A (FY 2022-2023)File: Form 2A 2024-2025.pdf24 Aug 2026
Form 2A (FY 2023-2024)File: Form 2A 2024-2025.pdf24 Aug 2026
Form 2A (FY 2024-2025)File: Form 2A 2024-2025.pdf24 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A 2025-2026.pdf24 Aug 2026
Form 2A (FY 2026-2027)File: Form 2A.pdf24 Aug 2026
Withdrawal Update Form 1File: Form 1.pdf21 Aug 2026
Withdrawal Update Form 2File: Form 2.pdf21 Aug 2026
Withdrawal Update Form 3File: Form 3.pdf21 Aug 2026
Withdrawal Update Form 1File: Form 1.pdf15 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf15 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf15 Jul 2026
Form 1File: Form - I.pdf11 Jun 2026
Form 2File: Form - II.pdf11 Jun 2026
Form 3File: Form - III.pdf11 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf11 Jun 2026
Form 1File: Form 1.pdf26 Feb 2026
Form 2File: Form 2.pdf26 Feb 2026
Form 3File: Form 3.pdf26 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf26 Feb 2026
Form 1File: Form 1.pdf12 Feb 2026
Form 2File: Form 2.pdf12 Feb 2026
Form 3File: Form 3.pdf12 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf12 Feb 2026
Form 1File: ARCHITECTS CERTIFICATE PH-3.pdf22 Aug 2025
Form 2File: ENGINEER'S CERTIFICATE PH-3.pdf22 Aug 2025
Form 3File: Form 3.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Unsold Units.pdf22 Aug 2025
Form 1File: ARCHITECTS CERTIFICATE PH-3.pdf22 Aug 2025
Form 2File: ENGINEER'S CERTIFICATE PH-3.pdf22 Aug 2025
Form 3File: Form 3.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Unsold Units.pdf22 Aug 2025
Form 1File: ARCHITECTS CERTIFICATE PH-3.pdf22 Aug 2025
Form 2File: ENGINEER'S CERTIFICATE PH-3.pdf22 Aug 2025
Form 3File: Form 3.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Unsold Units.pdf22 Aug 2025
Form 1File: ARCHITECTS CERTIFICATE PH-3.pdf22 Aug 2025
Form 2File: ENGINEER'S CERTIFICATE PH-3.pdf22 Aug 2025
Form 3File: Form 3.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Unsold Units.pdf22 Aug 2025
Form 1File: ARCHITECTS CERTIFICATE PH-3.pdf22 Aug 2025
Form 2File: ENGINEER'S CERTIFICATE PH-3.pdf22 Aug 2025
Form 3File: Form 3.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Unsold Units.pdf22 Aug 2025
Form 1File: ARCHITECTS CERTIFICATE PH-3.pdf22 Aug 2025
Form 2File: ENGINEER'S CERTIFICATE PH-3.pdf22 Aug 2025
Form 3File: Form 3.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Unsold Units.pdf22 Aug 2025
Form 1File: ARCHITECTS CERTIFICATE PH-3.pdf22 Aug 2025
Form 2File: ENGINEER'S CERTIFICATE PH-3.pdf22 Aug 2025
Form 3File: Form 3.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Unsold Units.pdf22 Aug 2025
Form 1File: ARCHITECTS CERTIFICATE PH-3.pdf22 Aug 2025
Form 2File: ENGINEER'S CERTIFICATE PH-3.pdf22 Aug 2025
Form 3File: Form 3.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Unsold Units.pdf22 Aug 2025
Form 1File: ARCHITECTS CERTIFICATE PH-3.pdf22 Aug 2025
Form 2File: ENGINEER'S CERTIFICATE PH-3.pdf22 Aug 2025
Form 3File: Form 3.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Unsold Units.pdf22 Aug 2025
Form 1File: ARCHITECTS CERTIFICATE PH-3.pdf22 Aug 2025
Form 2File: ENGINEER'S CERTIFICATE PH-3.pdf22 Aug 2025
Form 3File: Form 3.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Unsold Units.pdf22 Aug 2025
Form 1File: ARCHITECTS CERTIFICATE PH-3.pdf22 Aug 2025
Form 2File: ENGINEER'S CERTIFICATE PH-3.pdf22 Aug 2025
Form 3File: Form 3.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Unsold Units.pdf22 Aug 2025
Form 1File: ARCHITECTS CERTIFICATE PH-3.pdf22 Aug 2025
Form 2File: ENGINEER'S CERTIFICATE PH-3.pdf22 Aug 2025
Form 3File: Form 3.pdf22 Aug 2025

How this compares with Mumbai City

85%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 7 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Siddha Sky Phase 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Raoli Camp Kokri Nagar, Sardar Nagar No. 4, GTB Monorail Station780+ in Mumbai City

Builder: M/s. Sejal Shakti Realtors LLP

M/s. Sejal Shakti Realtors LLP has 2 registrations on MahaRERA, including Siddha Sky Phase 3 and Siddha Sky Phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Siddha Sky Phase 3 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Siddha Sky Phase 3?

The registered promoter entity is M/s. Sejal Shakti Realtors LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Siddha Sky Phase 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Siddha Sky Phase 3?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Siddha Sky Phase 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Siddha Sky Phase 3?

The professionals named in the filing: Architect: DOT Architects; Engineer: Arijit Malik; Engineer: Basant H Jha; Chartered Accountant: Kshitij Shah; Chartered Accountant: Damle Dhandhania & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Siddha Sky Phase 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Siddha Sky Phase 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Siddha Sky Phase 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.