Registration lapsed No litigation declared Residential / Group Housing project

Siddha Shila

By RKE Builders & Developers

RG-MH-37028 · RERA P51800046233 · Last updated on MahaRERA portal: 31 Dec 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 10 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
3 of 11Construction stages donefurthest along: Podiums (if any), 80%
0 of 99Units unsoldnot recorded sold or booked
10Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

Siddha Shila is a Residential / Group Housing project by RKE Builders & Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046233 on 20 Jun 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 99 of the 99 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 10 complaints are on record with the regulator.

At a glance

Project

  • NameSiddha Shila
  • TypeResidential / Group Housing
  • Location
    • Jakaria Road
    • Malad West
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800046233
  • ReraGenie IDRG-MH-37028

Builder

  • NameRKE Builders & Developers
  • Entity typePartnership
  • PartnersMadhu Rajendra Singhvi, Rajendra Hastimal Singhvi, Saurabh Dhirajlal Kubadia, Kamlesh Prabhulal Khandor, Pankaj Kantilal Kubadia

Key dates

10 months past promisethis monthRegisteredJun 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on20 Jun 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed98 files

Current status

100%99 of 99 units booked
40.1%Work done, per cost certificate

Figures as on 31 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Siddha ShilaNA222195499

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 80%.

Siddha Shila: 53% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)80%
Plinth100%
Stilt Floor80%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 31 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,292 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Dec 2025

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI7550.0
Proposed, not sanctioned3,914 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchhantinath Shopping Center, S V Road Malad W Mumbai 400064
Estimated costRs 89.00 cr
Cost incurredRs 35.71 cr
Work done40.13%
BuildingWingEstimatedIncurred
Siddha ShilaNARs 76.55 crRs 35.71 cr
-NARs 12.46 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMapron Consultants
EngineerM P Prime Consultants Private Limited
EngineerZ Z consulrant
Chartered AccountantHaresh P Kothari Kothari
PartnerRole in project
RKE Builders & Developers-

Complaints filed with MahaRERA10

Case no.ComplainantRespondentFiled
CC006000000364582Piyush Ramesh MehtaRKE Builders and Developers04/03/2023
CC006000000408558Sanjay Mahendra Parmar Jain (HUF)R. K. E. Builders & Developers19/12/2023
CC12502637Babulal Parmar Jain HUFRKE Builders & Developers30/07/2025
CC12502636Nilesh Babulal ParmarRKE Builders & Developers30/07/2025
CC12502635Mahendrakumar Bhavarlal ParmarRKE Builders & Developers30/07/2025
CC12502634Premkumari Babulal JainRKE Builders & Developers30/07/2025
CC12502633Tamubai Bhawarlal Parmar JainRKE Builders & Developers30/07/2025
CC12503059Mittal Kamlesh ShahRKE Builders & Developers01/09/2025
CC12503060amit chhedaRKE Builders & Developers01/09/2025
CC12504021Suresh Kisan NagneRKE Builders & Developers15/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: RKA Arct Form 1 202509.pdf31 Dec 2025
Withdrawal Update Form 2File: RKE Engr Form 2 202509.pdf31 Dec 2025
Withdrawal Update Form 3File: RKA CA Form 3 202509.pdf31 Dec 2025
Withdrawal Update Form 1File: RKE Arc Form 1 202506.pdf30 Dec 2025
Withdrawal Update Form 2File: RKE Engr Form 2 202506.pdf30 Dec 2025
Withdrawal Update Form 3File: RKE CA Form 3 202506.pdf30 Dec 2025
Form 1File: RKE Buld Arc Form 1 202503.pdf25 Nov 2025
Form 2File: RKE Buld Engr Form 2 202503.pdf25 Nov 2025
Form 3File: RKE Buld CA Form 3 202503.pdf25 Nov 2025
Disclosure of Sold and Booked InventoryFile: RKE Buld Sold Unsold Discl 202503.pdf25 Nov 2025
Form 1File: RKE Buld Arc Form 1 202209.pdf14 Nov 2025
Form 2File: RKE Buld Engr Form 2 202209.pdf14 Nov 2025
Form 3File: RKE Buld CA Form 3 202209.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: RKE Buld Sold unsold Invt Discl 202209.pdf14 Nov 2025
Form 1File: RKE BULD Arc Form 1 202212.pdf14 Nov 2025
Form 2File: RKE Buld Engr Form 2 202212.pdf14 Nov 2025
Form 3File: RKE Buld CA Form 3 202212.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: RKE Buld Sold unsold Invt discl 202212.pdf14 Nov 2025
Form 1File: RKE Buld Arch Form 1 202303.pdf14 Nov 2025
Form 2File: RKE Buld Engr Form 2 202303.pdf14 Nov 2025
Form 3File: RKE Buld CA Form 3 202303.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: RKE Buld Sold unsold invt discl 202303.pdf14 Nov 2025
Form 1File: RKE Buld Arc Form 1 202306.pdf14 Nov 2025
Form 2File: RKE Buld Engr Form 2 202306.pdf14 Nov 2025
Form 3File: RKE Buld CA Form 3 202306.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: RKE Buld Sold unsold discl 202306.pdf14 Nov 2025
Form 1File: RKE Buld Arc Form 1 202309.pdf14 Nov 2025
Form 2File: RKE Buld Engr Form 2 202309.pdf14 Nov 2025
Form 3File: RKE Buld CA Form 3 202309.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: RKE Buld Sold Unsold discl Buld 202309.pdf14 Nov 2025
Form 1File: RKE Buld Arc Form 1 202312.pdf14 Nov 2025
Form 2File: RKE Buld Engr Form 2 202312.pdf14 Nov 2025
Form 3File: RKE Buld CA Form 3 202312.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: RKE Buld Sold unsold discl 202312.pdf14 Nov 2025
Form 1File: RKE Buld Arc Form 1 202403.pdf14 Nov 2025
Form 2File: RKE Buld Engr Form 2 202403.pdf14 Nov 2025
Form 3File: RKE Buld CA Form 3 202403.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: RKE Buld Sold unsold Discl 202403.pdf14 Nov 2025
Form 1File: RKE Buld Arc Form 1 202406.pdf14 Nov 2025
Form 2File: RKE Bild Engr Form 2 202406.pdf14 Nov 2025
Form 3File: RKE Buld CA Form 3 202406.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: RKE Buld Sold unsold Dscl 202406.pdf14 Nov 2025
Form 1File: RKE Buld Arc Form 1 202409.pdf14 Nov 2025
Form 2File: RKE Buld Engr Form 2 202409.pdf14 Nov 2025
Form 3File: RKE Buld CA Form 3 202409.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: RKE BUld Sold unsold Discl 202409.pdf14 Nov 2025
Form 1File: RKE Buld Arc Form 1 202412.pdf14 Nov 2025
Form 2File: RKE Buld Engr Form 2 202412.pdf14 Nov 2025
Form 3File: RKE Buld CA Form 3 202412.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: RKE Buld Sold unsold Discl 202412.pdf14 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Dec 2022.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 March 2023.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 June 2023.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Sep 2023.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Dec 2023.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 March 2024.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 June 2024.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Sep 2024.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Dec2024.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Sep 2022.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 Dec 2024.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 Sep 2024.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 June 2024.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 March 2024.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 Dec 2023.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 Sep 2023.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 June 2023.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 March 2023.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 Dec 2022.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 Sep 2022.pdf25 Feb 2025
Layout approvalFile: 4_D (1).pdf13 Jun 2022
Layout approvalFile: 4_D (2).pdf13 Jun 2022
Layout approvalFile: 4_D (3).pdf13 Jun 2022
Layout approvalFile: 4_D (4).pdf13 Jun 2022
Layout approvalFile: 4_D (5).pdf13 Jun 2022
Layout approvalFile: 4_D (6).pdf13 Jun 2022
Building plan approvalFile: 5_IoA.pdf13 Jun 2022
PAN CardFile: 1_RKE PAN CARD.pdf13 Jun 2022
Copy of the legal title reportFile: 2_LEGAL TITLE REPORT.pdf13 Jun 2022
Copy of the legal title reportFile: 2A_Search.pdf13 Jun 2022

How this compares with Mumbai Suburban

100%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Siddha Shila on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Malad West6,700+ in Mumbai Suburban

2 kmSiddha ShilaCompleted 147Lapsed / revoked 90Other 157Dot size: filed unitsN

Filed coordinates, straight-line distance. 394 registered projects within 2 km.

Builder: RKE Builders & Developers

RKE Builders & Developers has 1 registration on MahaRERA, including Siddha Shila. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Siddha Shila shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Siddha Shila is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Siddha Shila?

The registered promoter entity is RKE Builders & Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Siddha Shila?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Siddha Shila?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Siddha Shila?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Siddha Shila?

The professionals named in the filing: Architect: Mapron Consultants; Engineer: M P Prime Consultants Private Limited; Engineer: Z Z consulrant; Chartered Accountant: Haresh P Kothari Kothari. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Siddha Shila?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Siddha Shila. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Siddha Shila to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.