ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / SHWETA HEIGHTS

Registered No litigation declared Others project

SHWETA HEIGHTS

By SHREE SAI ASSOCIATES

RG-MH-29780 · RERA P51700029110 · Last updated on MahaRERA portal: 6 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 12 months from the original
17 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
50 of 157Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

SHWETA HEIGHTS is a Others project by SHREE SAI ASSOCIATES in Thane, Maharashtra, registered with MahaRERA as P51700029110 on 26 Apr 2021. Possession is promised by 31 Mar 2027. The completion date has moved by 12 months from the original filing. 107 of the 157 units on this registration are recorded sold or booked, and 17 of 22 construction stages are filed complete.

At a glance

Project

  • NameSHWETA HEIGHTS
  • TypeOthers
  • Location
    • KANAKIA ROAD
    • MIRA ROAD EAST
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700029110
  • ReraGenie IDRG-MH-29780

Builder

  • NameSHREE SAI ASSOCIATES
  • Entity typePartnership
  • PartnersNARHAR NARAYAN MHATRE, GAURAV NANDKUMAR MHATRE, SHWETA NANDKUMAR MHATRE
  • Other registrations11 more →
  • Completed3 of 12
  • No longer live5 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredApr 2021First promiseMar 2026Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Apr 2021
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Mar 2026)
  • Buildings2 building records
  • Documents filed109 files

Current status

68%107 of 157 units booked
99.8%Work done, per cost certificate

Figures as on 6 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHWETA HEIGHTS BUILDING NO 1NA49498027107
SHWETA HEIGHTS BUILDING NO 2NA505050050

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 6 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

SHWETA HEIGHTS BUILDING NO 182%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SHWETA HEIGHTS BUILDING NO 281%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes92%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed36

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots36
Closed/Covered36

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,560 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
NARHAR NARAYAN MHATREMira-Bhayandar (M Corp.)Thane
BHANUBAI YASHWANT MHATREMira-Bhayandar (M Corp.)Thane
GODAVARI GANPAT KADUMira-Bhayandar (M Corp.)Thane
JAYWANTI RAMESH PATILMira-Bhayandar (M Corp.)Thane

Approvals and building plan

Sanctioning authorityMira Bhayandar Mahanagarpalika
Permissible FSI13751.9
Proposed, not sanctioned10,566 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKASTURI UDYOG, SHOP NO 1, 2, 3, NEAR PHATAK, BHAYANDAR EAST, THANE - 401101
Estimated costRs 105
Cost incurredRs 105
Work done99.85%
BuildingWingEstimatedIncurred
-NARs 52Rs 52
SHWETA HEIGHTS BUILDING NO 1NARs 33Rs 33
SHWETA HEIGHTS BUILDING NO 2NARs 20Rs 20

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMario E. Correa
EngineerRajesh Baleshwar Dubey
EngineerPro Tech consultants
Chartered AccountantNIKUNJ GOVIND BHANGARIA
Chartered AccountantD P Shejwal & associates
PartnerRole in project
SHREE SAI ASSOCIATES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA30042620791Mar 2026 → Mar 2027

Reason as filed by the promoter1) Poor booking response from customer. 2) Because of poor response our work was very slow.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 -30-06-26 sigend.pdf6 Aug 2026
Withdrawal Update Form 2File: FORM 2--30-06-26 sigend.pdf6 Aug 2026
Withdrawal Update Form 3File: Form 3 Shree Sai Associates signed copy n.pdf6 Aug 2026
Form 2A (FY 2021-2022)File: Form 2A 2021-22 sign.pdf25 May 2026
Form 2A (FY 2022-2023)File: Form 2A 2022-23 sign.pdf25 May 2026
Form 2A (FY 2023-2024)File: Form 2A 2023-24 sign.pdf25 May 2026
Form 2A (FY 2024-2025)File: Form 2A 2024-25 sign.pdf25 May 2026
Form 5 (FY 2021-2022)File: Form 5 21-22 Shree Sai Asso.pdf18 May 2026
Form 5 (FY 2022-2023)File: Form 5 22-23 Shree Sai Asso.pdf18 May 2026
Form 5 (FY 2023-2024)File: Form 5 23-24 Shree Sai Asso.pdf18 May 2026
Form 5 (FY 2024-2025)File: FORM 5 Shree Sai Asso 2024-25 sign.pdf18 May 2026
Form 1File: Form 1 31-03-2026 Sign.pdf29 Apr 2026
Form 2File: Form 2 31-03-2026 Sign.pdf29 Apr 2026
Form 3File: Form 3 Shree Sai Asso 31-03-2026 Sign.pdf29 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold -31-03-26 new.pdf29 Apr 2026
Form 1File: Form 1 30-06-2025.pdf26 Mar 2026
Form 2File: Form - 2.pdf26 Mar 2026
Form 3File: Form 3 30-06-2025 Shree Sai Asso Sign_.pdf26 Mar 2026
Disclosure of Sold and Booked InventoryFile: disclosure of 30 06 2025 SIGNED.pdf26 Mar 2026
Form 1File: Form 1 30-09-25.pdf26 Mar 2026
Form 2File: Form 2 30-09-025.pdf26 Mar 2026
Form 3File: Form 3 30-09-2025 Shree Sai Asso Sign.pdf26 Mar 2026
Disclosure of Sold and Booked InventoryFile: disclosure 30 09 2025 SIGNED.pdf26 Mar 2026
Form 1File: Form 1 31-12-2025.pdf26 Mar 2026
Form 2File: Form 2 31-12-2025.pdf26 Mar 2026
Form 3File: Form 3 31-12-2025 Shree Sai Asso Sign_.pdf26 Mar 2026
Disclosure of Sold and Booked InventoryFile: disclosure of 30 12 2025 SIGNED.pdf26 Mar 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 sign.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf7 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 signed copy.pdf7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 signed copy.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Engineer certificate 31062024.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHREE SAI FORM 3 - converted.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: _FORM 1 SIGNED.pdf11 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SIGNED.pdf11 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SIGNED.pdf11 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 shree sai associates.pdf23 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SINGED.pdf23 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SINGED.pdf23 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 shree sai associates.pdf23 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 SINGED.pdf23 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 SINGED.pdf23 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 shree sai associates .pdf23 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SINGED.pdf23 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SINGED.pdf23 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Shree Sai 31st March 2023_1 (2 files merged).pdf11 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf24 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2_1 (3 files merged) (2).pdf24 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 As on 31-12-2022_1 (8 files merged) (1).pdf24 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-9-2023 signed.pdf21 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 certificate 30 sept 2023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 eng certificate 30 sept 2023.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM -5_1 (2 files merged).pdf29 Apr 2023
Layout approvalFile: Plan.pdf9 Mar 2023
Building plan approvalFile: Plan.pdf9 Mar 2023
Copy of Layout Approval (in case of layout)File: Plan.pdf9 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf9 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1187_rera_form 1.pdf9 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 march 22.pdf9 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG 1 (3 files merged).pdf9 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng cert.pdf9 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf9 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 (2).pdf9 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: shree sai revised cc bldg 2 (1).pdf3 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1187_rera_form 1.pdf22 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1-3.pdf31 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 SHWETA MARIO.pdf31 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 31st dec 2021_compressed.pdf31 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA shweta heigjts_compressed (2)_compressed.pdf31 Jan 2022
Disclosure of sold/ booked inventoryFile: Disclouser of Sold Unsold Inventory.pdf26 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf25 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf25 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Quality Assurance Certificate From Site Supervisor (1).pdf25 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf25 Aug 2021
OtherFile: Overall Completion.pdf25 Aug 2021
Layout approvalFile: Layout Plan 1.pdf15 Jun 2021

How this compares with Thane

68%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHWETA HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MIRA ROAD EAST7,600+ in Thane

2 kmSHWETA HEIGHTSCompleted 85Lapsed / revoked 62Other 73Dot size: filed unitsN

Filed coordinates, straight-line distance. 220 registered projects within 2 km.

Builder: SHREE SAI ASSOCIATES

SHREE SAI ASSOCIATES has 12 registrations on MahaRERA, including SHREE SAI ENCLAVE and SHREE SAI PARK. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHWETA HEIGHTS is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHWETA HEIGHTS?

The registered promoter entity is SHREE SAI ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHWETA HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHWETA HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHWETA HEIGHTS?

The professionals named in the filing: Architect: Mario E. Correa; Engineer: Rajesh Baleshwar Dubey; Engineer: Pro Tech consultants; Chartered Accountant: NIKUNJ GOVIND BHANGARIA; Chartered Accountant: D P Shejwal & associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHWETA HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHWETA HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHWETA HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.