SHUKRATARA CHSL

By HARIOM DEVELOPERS

RG-MH-12516 · RERA P51800003562 · Last updated on MahaRERA portal: 29 May 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 24 months past the filed date
  • Completion date moved by 60 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Oct 2024Possession promised24 months past this date
10 of 11Construction stages donefurthest along: Installation of Lifts, 75%
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

SHUKRATARA CHSL is a Others project by HARIOM DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003562 on 5 Aug 2017. Possession was promised by 15 Oct 2024 and is now 24 months past that date. The completion date has moved by 60 months from the original filing.

At a glance

Project

  • NameSHUKRATARA CHSL
  • TypeOthers
  • Location
    • Andheri
    • Mumbai Suburban
    • 400057
  • Pincode400057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800003562
  • ReraGenie IDRG-MH-12516

Builder

  • NameHARIOM DEVELOPERS
  • Entity typePartnership
  • PartnersAMIT VIJAY PRABHU, GAURANG HARISH VORA
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live1 lapsed, de-registered or revoked

Key dates

24 months past promisethis monthRegisteredAug 2017First promiseOct 2019Revised toOct 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on5 Aug 2017
  • Promised completion15 Oct 2024
  • Revised completionRevised to 15 Oct 2024 (originally 31 Oct 2019)
  • Buildings1 building record
  • Documents filed66 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHUKRATARA CHS LTDNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 75%.

SHUKRATARA CHS LTD: 98% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 29 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered26

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area672 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1364.44
Proposed, not sanctioned1,142 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPRANASHISH YARI ROAD VERSOVA ANDHERI WEST MUMBAI 400061

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSATCHIDANAND BHAGWANTRAO DADARKAR COMP BRIGHTON ARCHITECTS INDIA PVT LTD
EngineerVIKAS V GOKHALE
PartnerRole in project
HARIOM DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800002581Oct 2019 → Oct 2020

Reason as filed by the promoterDue to the passing of the new DCR 2034. MCGM has held approvals for a period of 2-3 months to gauge the implications it has on the existing projects. This has resulted in delay in getting further CC. Prolonged Monsoon from July 19 to October 19 resulted in Construction Work getting hampered and resulted in further delay on Construction Work. The Slowdown in Real Estate market has also resulted in cash flow issues for all developers causing some delay in the project.

EXT51800017923Oct 2019 → Oct 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 75% allottees for purpose of extension of RERA registration period of the said project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Apr 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Form B.pdf29 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Shukratara CHSL.pdf29 May 2025
Certificates of CA (Form 3)File: organized (24).pdf29 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer cert.pdf29 May 2025
Disclosure of sold/ booked inventoryFile: Information of sold booking Inventory.pdf29 May 2025
CERSAI detailsFile: CERSAI Declaration.pdf29 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format 'A'.pdf29 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf29 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (1).pdf29 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sept 23.pdf6 Nov 2023
Disclosure of sold/ booked inventoryFile: Circular 29 Updated.pdf6 Nov 2023
Certificates of CA (Form 3)File: Form 3 Shukratara_compressed.pdf6 Nov 2023
Declaration in FORM BFile: AFFIDAVIT 03-11-23.pdf3 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 21-23.pdf1 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf28 Oct 2023
Disclosure of sold/ booked inventoryFile: Circular 29.pdf28 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1.pdf27 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1.pdf27 Oct 2023
Declaration about Commencement CertificateFile: Format D.pdf18 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_11zon.pdf18 Oct 2023
Other - LegalFile: REPLY MAHARERA SHOW CAUSE NOTICE.pdf11 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: march 20.pdf10 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: march 21.pdf10 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: march 22.pdf10 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 22.pdf10 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Explanation for Delay in Form 5.pdf10 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Eng 31-03-20.pdf9 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Eng 31-03-21.pdf9 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Eng 31-03-22.pdf9 Feb 2023
Certificates of CA (Form 3)File: Form 3-20.pdf9 Feb 2023
Certificates of CA (Form 3)File: Form 3-21.pdf9 Feb 2023
Certificates of CA (Form 3)File: Form 3-22.pdf9 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5-20.pdf9 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5-21.pdf9 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-22.pdf9 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf27 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form5_Shukratara_1819.pdf27 Aug 2022
Building plan approvalFile: Pages from SHUKRATARA CHS IOD BLUE PRINT 1mb.pdf9 Apr 2019
Building plan approvalFile: Pages from SHUKRATARA CHS IOD BLUE PRINT 1mb-2.pdf9 Apr 2019
Building plan approvalFile: Pages from SHUKRATARA CHS IOD BLUE PRINT 1mb-3_compressed.pdf9 Apr 2019
Building plan approvalFile: Pages from SHUKRATARA CHS IOD BLUE PRINT 1mb-4.pdf9 Apr 2019
Building Plan Approval (IOD)File: Pages from SHUKRATARA CHS IOD BLUE PRINT 1mb.pdf9 Apr 2019
Building Plan Approval (IOD)File: Pages from SHUKRATARA CHS IOD BLUE PRINT 1mb-2.pdf9 Apr 2019
Building Plan Approval (IOD)File: Pages from SHUKRATARA CHS IOD BLUE PRINT 1mb-3_compressed.pdf9 Apr 2019
Building Plan Approval (IOD)File: Pages from SHUKRATARA CHS IOD BLUE PRINT 1mb-4.pdf9 Apr 2019
Commencement Certificates / NA Order for plotted developmentFile: FurtherCCsigned.pdf9 Apr 2019
Certificates of CA (Form 5)File: fORM 5 sHUKRATARA.pdf15 Oct 2018
Certificates of CA (Form 3)File: Shukratara CA Certificate.pdf29 Jul 2017
Building plan approvalFile: IOD Letter.pdf28 Jul 2017
Layout approvalFile: AMMENDED PLAN 04-07-2017 final.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: AMMENDED PLAN 04-07-2017 final.pdf28 Jul 2017
Building Plan Approval (IOD)File: IOD Letter.pdf28 Jul 2017
Declaration in FORM BFile: DA page 1-20.pdf28 Jul 2017
Declaration in FORM BFile: DA page 21-50.pdf28 Jul 2017
Declaration in FORM BFile: DA PAGE 51-71.pdf28 Jul 2017
Declaration in FORM BFile: affidiviate 1.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shukratara architect certificate.pdf28 Jul 2017
Proforma of Allotment letterFile: Proforma of Allotment Letter Shukratara.pdf28 Jul 2017
Proforma of Allotment letterFile: Shukratara Sale Draft.pdf28 Jul 2017
Building plan approvalFile: IOD Plan.pdf27 Jul 2017
Copy of the legal title reportFile: Title Clearance small.pdf27 Jul 2017
Details of encumbrancesFile: encum.pdf27 Jul 2017
Building Plan Approval (IOD)File: IOD Plan.pdf27 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Shukratara CC.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Shukarata Engineer Certificate.pdf27 Jul 2017
PAN CardFile: pan card original.pdf21 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 60 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHUKRATARA CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

2 kmSHUKRATARA CHSLCompleted 139Lapsed / revoked 68Other 136Dot size: filed unitsN

Filed coordinates, straight-line distance. 343 registered projects within 2 km.

Builder: HARIOM DEVELOPERS

HARIOM DEVELOPERS has 4 registrations on MahaRERA, including SHUKRATARA CHSL and SUDHANSHU CHS LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that SHUKRATARA CHSL shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHUKRATARA CHSL is delayed beyond 15 Oct 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHUKRATARA CHSL?

The registered promoter entity is HARIOM DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHUKRATARA CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHUKRATARA CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHUKRATARA CHSL?

The professionals named in the filing: Architect: SATCHIDANAND BHAGWANTRAO DADARKAR COMP BRIGHTON ARCHITECTS INDIA PVT LTD; Engineer: VIKAS V GOKHALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHUKRATARA CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHUKRATARA CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHUKRATARA CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.