Home / Browse projects / Ratnagiri, Maharashtra / SHUBHANKAR PRARAMBH

Registered No litigation declared Residential / Group Housing project

SHUBHANKAR PRARAMBH

By SHUBHANKAR BUILDSOL LLP

RG-MH-05410 · RERA P52800050920 · Last updated on MahaRERA portal: 18 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken
  • Rs 0.30 crore secured on the land, in favour of Dilip Gharpure and Gharpure Family
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedmoved 4 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 95%
20 of 26Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

SHUBHANKAR PRARAMBH is a Residential / Group Housing project by SHUBHANKAR BUILDSOL LLP in Ratnagiri, Maharashtra, registered with MahaRERA as P52800050920 on 15 May 2023. Possession is promised by 30 Apr 2028. The completion date has moved by 4 months from the original filing. 6 of the 26 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHUBHANKAR PRARAMBH
  • TypeResidential / Group Housing
  • Location
    • Nachane Road within Municipal limits
    • Ratnagiri
    • Nachane (CT)
    • 415639
  • Pincode415639
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800050920
  • ReraGenie IDRG-MH-05410

Builder

  • NameSHUBHANKAR BUILDSOL LLP
  • Entity typePartnership
  • PartnersVAIBHAV DATTATRAY PATANKAR, YATIN JANARDAN JOG
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2023First promiseDec 2027Revised toApr 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 May 2023
  • Promised completion30 Apr 2028
  • Revised completionRevised to 30 Apr 2028 (originally 31 Dec 2027)
  • Buildings1 building record
  • Documents filed83 files

Current status

23%6 of 26 units booked
59.7%Work done, per cost certificate

Figures as on 18 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHUBHANKAR PRARAMBHNA6620626

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.

SHUBHANKAR PRARAMBH: 57% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area740 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofDilip Gharpure and Gharpure Family
Secured amountRs 0.30 crore
CERSAI search filedYes
Declared on23 Aug 2025

Approvals and building plan

Sanctioning authorityRatnagiri Municipal Council
Permissible FSI2131.1
Proposed, not sanctioned1,681 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSarasbaug Pune Branch
Estimated costRs 4.50 cr
Cost incurredRs 2.69 cr
Work done59.68%
BuildingWingEstimatedIncurred
SHUBHANKAR PRARAMBHNARs 4.18 crRs 2.69 cr
-NARs 32.87 lakh-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAlternate Angle Consultants Pvt Ltd
EngineerSachin S Pampatwar
EngineerAniket Padekar
EngineerPriyanka Dewakate
Chartered AccountantMAPS & COMPANY
Chartered AccountantA S Modak and Associates
Chartered AccountantPGAA & Associates
PartnerRole in project
SHUBHANKAR BUILDSOL LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P52800050920/WarDec 2027 → Apr 2028

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2028

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 June 2026.pdf18 Sep 2026
Withdrawal Update Form 2File: Form 2 June 2026.pdf18 Sep 2026
Withdrawal Update Form 3File: Form 3 June 2026.pdf18 Sep 2026
Form 2A (FY 2025-2026)File: Form 2A 25-26.pdf18 Sep 2026
Form 5 (FY 2024-2025)File: Form 5 FY 24-25.pdf18 Sep 2026
Withdrawal Update Form 1File: Form 1 March 2026.pdf28 Apr 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf28 Apr 2026
Withdrawal Update Form 3File: Form 3 March 2026.pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1 December 2025.pdf25 Mar 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 December 2025.pdf25 Mar 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 December 2025.pdf25 Mar 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 as on September 2025.pdf24 Mar 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 as on September 2025.pdf24 Mar 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 as on September 2025.pdf24 Mar 2026
Form 1File: Form 1 June 2023.pdf23 Aug 2025
Form 2File: Form 2 June 2023.pdf23 Aug 2025
Form 3File: Form 3 June 2023.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 June 2023.pdf23 Aug 2025
Form 1File: Form 1 September 2023.pdf23 Aug 2025
Form 2File: Form 2 September 2023.pdf23 Aug 2025
Form 3File: Form 3 September 2023.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 September 2023.pdf23 Aug 2025
Form 1File: Form 1 December 2023.pdf23 Aug 2025
Form 2File: Form 2 December 2023.pdf23 Aug 2025
Form 3File: Form 3 December 2023.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 December 2023.pdf23 Aug 2025
Form 1File: Form 1 March 2024.pdf23 Aug 2025
Form 2File: Form 2 March 2024.pdf23 Aug 2025
Form 3File: Form 3 March 2024.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Ciruclar 29 March 2024.pdf23 Aug 2025
Form 1File: Form 1 June 2024.pdf23 Aug 2025
Form 2File: Form 2 June 2024.pdf23 Aug 2025
Form 3File: Form 3 June 2024.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Ciruclar 29 June 2024.pdf23 Aug 2025
Form 1File: Form 1 September 2024.pdf23 Aug 2025
Form 2File: Form 2 September 2024.pdf23 Aug 2025
Form 3File: Form 3 September 2024.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 September 2024.pdf23 Aug 2025
Form 1File: Form 1 December 2024.pdf23 Aug 2025
Form 2File: Form 2 December 2024.pdf23 Aug 2025
Form 3File: Form 3 December 2024.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 December 2024.pdf23 Aug 2025
Form 1File: Form 1 March 2025.pdf23 Aug 2025
Form 2File: Form 2 March 2025.pdf23 Aug 2025
Form 3File: Form 3 March 2025.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 March 2025.pdf23 Aug 2025
Withdrawal Update Form 1File: Withdrawal Application Form1 as on June 2025.pdf23 Aug 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 as on June 2025.pdf23 Aug 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 as on June 2025.pdf23 Aug 2025
Form 2A (FY 2023-2024)File: Form 2A 23-24-2.pdf23 Aug 2025
Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf23 Aug 2025
Form 5 (FY 2023-2024)File: Form 5 23-24.pdf23 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate31122023_11zon.pdf7 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificatesigned30062023.pdf7 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificatesigned30092023.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 301223 R.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate SP 300623.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate SP30092023.pdf7 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Prarambh 30062023_11zon.pdf7 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Prarambh 30092023_11zon.pdf7 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Prarambh 31122023_11zon.pdf7 Mar 2024
Proforma of Agreement for saleFile: Blank Draft for Ratnagiri 03052023.pdf3 May 2023
Deviation Report with respect to model copy of AgreementFile: Deviation 03052023.pdf3 May 2023
Details of encumbrances concerned to FinanceFile: Declaration for encumbrances new new.pdf19 Apr 2023
Details of encumbrances concerned to LegalFile: Declaration for encumbrances new new.pdf19 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Vaibhav Patankar-New.pdf19 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Yatin Jog-New.pdf19 Apr 2023
Copy of the legal title reportFile: Legal Title Opinion_Shubhankar Buildsol LLP_11042023.pdf18 Apr 2023
Declaration about Commencement CertificateFile: Declaration for Commencement.pdf18 Apr 2023
Declaration in FORM BFile: FORM B Revise.pdf18 Apr 2023
CERSAI detailsFile: Undertaking for no Security Int.pdf18 Apr 2023
Building plan approvalFile: Approved layout building Plan.pdf17 Apr 2023
Layout approvalFile: Approved layout building Plan.pdf17 Apr 2023
PAN CardFile: PAN - Firm.pdf17 Apr 2023
Copy of Layout Approval (in case of layout)File: Approved layout building Plan.pdf17 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Approved layout building Plan.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate signed.pdf17 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf17 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 - SHUBHANKAR PRARAMBH RATNAGIRI (1).pdf17 Apr 2023
Proforma of Allotment letterFile: Allotment Letter compressed.pdf17 Apr 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
CHINTAMANICTS no 1206 Plot No 53 at Hingane Budruk Maharashi Karve Nagar9OngoingSep 2024Sep 2024

How this compares with Ratnagiri

23%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one moved by 4 months
30%of Ratnagiri registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep SHUBHANKAR PRARAMBH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ratnagiri1,100+ in Ratnagiri

2 kmSHUBHANKAR PRARAMBHCompleted 54Lapsed / revoked 12Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 104 registered projects within 2 km.

Builder: SHUBHANKAR BUILDSOL LLP

SHUBHANKAR BUILDSOL LLP has 2 registrations on MahaRERA, including CHINTAMANI and SHUBHANKAR PRARAMBH. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if SHUBHANKAR PRARAMBH is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHUBHANKAR PRARAMBH?

The registered promoter entity is SHUBHANKAR BUILDSOL LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHUBHANKAR PRARAMBH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHUBHANKAR PRARAMBH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHUBHANKAR PRARAMBH?

The professionals named in the filing: Architect: Alternate Angle Consultants Pvt Ltd; Engineer: Sachin S Pampatwar; Engineer: Aniket Padekar; Engineer: Priyanka Dewakate; Chartered Accountant: MAPS & COMPANY; Chartered Accountant: A S Modak and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHUBHANKAR PRARAMBH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHUBHANKAR PRARAMBH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHUBHANKAR PRARAMBH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.