Registered No litigation declared Residential / Group Housing project

SHUBHANGI HEIGHTS

By OM BUILDCON

RG-MH-31908 · RERA P50500080180 · Last updated on MahaRERA portal: 2 May 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 36 documents Report an error

SHUBHANGI HEIGHTS is a Residential / Group Housing project by OM BUILDCON in Nagpur, Maharashtra, registered with MahaRERA as P50500080180 on 5 May 2025. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameSHUBHANGI HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • MOUZA KHAMLA
    • KHAMLA
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440025
  • Pincode440025
  • RERA no.P50500080180
  • ReraGenie IDRG-MH-31908

Builder

  • NameOM BUILDCON
  • Entity typePartnership
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 May 2025
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed36 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHUBHANGI HEIGHTSNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

SHUBHANGI HEIGHTS: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed225

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots225
Closed/Covered1
Open Space224

Land and ownership43

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,324 sq m
Land owned byThe promoter, with other names on the file
Named landowners43
LandownerVillageDistrict
PRAKASH UTTARWARNagpur (M Corp.)Nagpur
RAJSHREE POPHALINagpur (M Corp.)Nagpur
KANAK PALIWALNagpur (M Corp.)Nagpur
ANIL SARAFNagpur (M Corp.)Nagpur
SUNIL MULEYNagpur (M Corp.)Nagpur
BHARATI BASAKHETRENagpur (M Corp.)Nagpur
GIRISH AWANDHENagpur (M Corp.)Nagpur
DEEPAK DESHPANDENagpur (M Corp.)Nagpur
ANIRUDDHA KADUSKARNagpur (M Corp.)Nagpur
PRASANNA BHATTACHARYANagpur (M Corp.)Nagpur
SUHAS SHENDRENagpur (M Corp.)Nagpur
ARTI DASNagpur (M Corp.)Nagpur
ANIL MUJUMDARNagpur (M Corp.)Nagpur
KALPANA DEONagpur (M Corp.)Nagpur
HEMANT ADGAONKARNagpur (M Corp.)Nagpur
KISHOR KHANORKARNagpur (M Corp.)Nagpur
ANIL PINGLENagpur (M Corp.)Nagpur
VIJAYA DESHPANDENagpur (M Corp.)Nagpur
AMIT MANKARNagpur (M Corp.)Nagpur
KRISHNARAO TAPIKARNagpur (M Corp.)Nagpur
GIRISH PHALNIKARNagpur (M Corp.)Nagpur
RAMESH UNDIRWADENagpur (M Corp.)Nagpur
AJIT DESHMUKHNagpur (M Corp.)Nagpur
SUSHILA PONNUNagpur (M Corp.)Nagpur
YOGESH RAMESH POPHALINagpur (M Corp.)Nagpur
GIRISH RAMESH POPHALINagpur (M Corp.)Nagpur
SHRIKANT SARAFNagpur (M Corp.)Nagpur
VAISHALI DESHPANDENagpur (M Corp.)Nagpur
DEEPAK AWANDHENagpur (M Corp.)Nagpur
MANIK GHATENagpur (M Corp.)Nagpur
RAJANI AWANDHENagpur (M Corp.)Nagpur
SUNETRA KADUSKARNagpur (M Corp.)Nagpur
PRADEEP DASNagpur (M Corp.)Nagpur
VIDYUT DASNagpur (M Corp.)Nagpur
SANGEETA DASNagpur (M Corp.)Nagpur
MONA GOELNagpur (M Corp.)Nagpur
ABHIJIT ADGAONKARNagpur (M Corp.)Nagpur
SARAL ADGAONKARNagpur (M Corp.)Nagpur
ANUSHRI PINGLENagpur (M Corp.)Nagpur
VISHAL DESHPANDENagpur (M Corp.)Nagpur
RAKESH PONNUNagpur (M Corp.)Nagpur
GURULAKSHMI VICKRAMNagpur (M Corp.)Nagpur
SUSHIL KUMAR PONNUNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNAGPUR MUNCIPAL CORPORATION
Permissible FSI5284.87
Proposed, not sanctioned5,285 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPRATAP NAGAR BRANCH ,45 VIDYA KUNJ KOTWAL NAGAR, VEER SAVARKAR MARG

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKSHITIJ SHIRKHEDKAR
EngineerSUDESH MALODE
Chartered AccountantCA KARTIK KEJDIWAL
PartnerRole in project
OM BUILDCON-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Feb 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed36

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - TechnicalFile: CA CERTIFICATE SHUBHANGI.pdf2 May 2025
Other - LegalFile: New Microsoft Word Document (3).pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE SHUBHANGI.pdf23 Apr 2025
Other - FinanceFile: Rera Self DECL SIGNED.pdf23 Apr 2025
Declaration in FORM BFile: VISHAKHA PISE.pdf26 Mar 2025
Other - LegalFile: CLARIFICATION.pdf26 Mar 2025
Other - LegalFile: CLARIFICATION1.pdf26 Mar 2025
Declaration about Commencement CertificateFile: COMMENCEMENT CERTIFICATE (1).pdf18 Mar 2025
Other - TechnicalFile: PHOTO-2025-03-05-16-18-36.pdf18 Mar 2025
Proforma of Agreement for saleFile: Agreement to Sell-RERA FORMAT-SEPTEMBER-OM BUILDCON-SHUBHANGI APARTMENT (1).pdf18 Mar 2025
Other - TechnicalFile: DECLAREATION CUM UNDERTAKING.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DocScanner 28-Feb-2025 7-08 pm.pdf28 Feb 2025
Layout approvalFile: SANCTION MAP SHUBHANGI_compressed.pdf21 Feb 2025
Building plan approvalFile: PERMIT SHUBHANGI.pdf21 Feb 2025
PAN CardFile: OM PAN CARD.pdf21 Feb 2025
Copy of the legal title reportFile: Search Report (1)_compressed.pdf21 Feb 2025
Details of encumbrances concerned to FinanceFile: FINANCIAL EMCUMBRANCE.pdf21 Feb 2025
Details of encumbrances concerned to FinanceFile: LEGAL EMCUMBARANCE.pdf21 Feb 2025
Copy of Layout Approval (in case of layout)File: SANCTION MAP SHUBHANGI_compressed.pdf21 Feb 2025
Proforma of Allotment letterFile: Allotment letter_compressed.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shubhangi Heights Form 1.pdf21 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: PERMIT SHUBHANGI.pdf21 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PERMIT SHUBHANGI.pdf21 Feb 2025
CERSAI detailsFile: CERSAI REPORT.pdf21 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf21 Feb 2025
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT.pdf21 Feb 2025
Details of encumbrances concerned to LegalFile: FINANCIAL EMCUMBRANCE.pdf21 Feb 2025
Details of encumbrances concerned to LegalFile: LEGAL EMCUMBARANCE.pdf21 Feb 2025
Deviation Report with respect to model copy of AgreementFile: DEVIATION ATS.pdf21 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE VISHAKHA PISE.pdf21 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE MEHAR.pdf21 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE RAHATE.pdf21 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE RAUT.pdf21 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE TARWANI.pdf21 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B.pdf21 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: SECURED - UNSECURED UNDERTAKING.pdf21 Feb 2025

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHUBHANGI HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHAMLA2,800+ in Nagpur

Builder: OM BUILDCON

OM BUILDCON has 4 registrations on MahaRERA, including AMRUT SMRUTI and RAMRATNA RESIDENCY. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if SHUBHANGI HEIGHTS is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHUBHANGI HEIGHTS?

The registered promoter entity is OM BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHUBHANGI HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHUBHANGI HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHUBHANGI HEIGHTS?

The professionals named in the filing: Architect: KSHITIJ SHIRKHEDKAR; Engineer: SUDESH MALODE; Chartered Accountant: CA KARTIK KEJDIWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHUBHANGI HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHUBHANGI HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHUBHANGI HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.