ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SHUBHAMKAROTI

Registered No litigation declared Residential / Group Housing project

SHUBHAMKAROTI

By CHAPHALKAR KARANDIKAR DEVELOPERS

RG-MH-18441 · RERA P52100077336 · Last updated on MahaRERA portal: 2 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 80%
25 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

SHUBHAMKAROTI is a Residential / Group Housing project by CHAPHALKAR KARANDIKAR DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100077336 on 9 Aug 2024. Possession is promised by 31 Mar 2027. 17 of the 42 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHUBHAMKAROTI
  • TypeResidential / Group Housing
  • Location
    • Shankarrao Mahajan Path
    • Shivaji Nagar
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411016
  • Pincode411016
  • RERA no.P52100077336
  • ReraGenie IDRG-MH-18441

Builder

  • NameCHAPHALKAR KARANDIKAR DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAOFC8877F2ZS
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersRishikesh Arvind Chaphalkar, GAURAV DNYANDAS CHAPHALKAR, SHRINIVAS DNYANDAS CHAPHALKAR, PUSHKARAJ ARVIND CHAPHALKAR, VIKRAM VILAS KARANDIKAR, TEJAS VILAS KARANDIKAR
  • Other registrations9 more →
  • Completed2 of 10
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects14 →

Key dates

this monthRegisteredAug 2024PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2024
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed62 files

Current status

40%17 of 42 units booked

Figures as on 2 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHUBHAMKAROTINA10742042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 80%.

SHUBHAMKAROTI: 29% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)50%
Plinth80%
Stilt Floor0%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Closed/Covered1
Open Space24

Land and ownership7

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,336 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
LandownerVillageDistrict
RISHIKESH ARVIND CHAPHALKARPune (M Corp.)Pune
GAURAV DNYANDAS CHAPHALKARPune (M Corp.)Pune
SHRINIVAS DNYANDAS CHAPHALKARPune (M Corp.)Pune
PUSHKARAJ ARVIND CHAPHALKARPune (M Corp.)Pune
VIKRAM VILAS KARANDIKARPune (M Corp.)Pune
TEJAS VILAS KARANDIKARPune (M Corp.)Pune
SHUBHAMKAROTI SOCIETYPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI5250.0
Proposed, not sanctioned2,686 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDeccan Gymkhana Pune 411006

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMs GNA Architects
EngineerEr Abhijeet Khade
Chartered AccountantKHIRE KHANDEKAR KIRLOSKAR
Chartered AccountantJPNR & ASSOCIATES
PartnerRole in project
CHAPHALKAR KARANDIKAR DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Shubhamkaroti Q4 March 2026.pdf2 May 2026
Form 2File: Form 2 Shubhamkaroti Q4 March 2026.pdf2 May 2026
Form 3File: FORM 3 Shubhamkaroti Q4 March 2026.pdf2 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Shubhamkaroti Q4 March 2026.pdf2 May 2026
Form 1File: Form 1- Architect Certificate002.pdf7 Feb 2026
Form 2File: Form 2- Engineer Certificate001.pdf7 Feb 2026
Form 3File: Form 3- CA certificate001.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclouser of Sold and unsold inventory001.pdf7 Feb 2026
Form 1File: Form 1- SKT001.pdf6 Nov 2025
Form 2File: Form 2- SKT001.pdf6 Nov 2025
Form 3File: Form 3- SKT001.pdf6 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold inventory.pdf6 Nov 2025
Form 5 (FY 2024-2025)File: Form 5- SKT001.pdf24 Oct 2025
Form 1File: Shubhamkaroti Form 1.pdf4 Aug 2025
Form 2File: Shubhamkroti Form 2 _30062025.pdf4 Aug 2025
Form 3File: Form 3 Skti Q1.pdf4 Aug 2025
Disclosure of Sold and Booked InventoryFile: Shubhamkaroti.pdf4 Aug 2025
Building plan approvalFile: 1-3.pdf23 Feb 2025
Building plan approvalFile: 2-3.pdf23 Feb 2025
Building plan approvalFile: 3-3.pdf23 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: CC 30 JAN2025.pdf23 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 1-3.pdf23 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 2-3.pdf23 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 3-3.pdf23 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shubhamkaroti Q3.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shubhamkaroti Q3.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shubhamkaroti Q3.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory Shubhamkaroti Q3.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHUBHAMKAROTI Q2.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHUBHAMKAROTI Q2.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SHUBHAMKAROTI Q2.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: CKD Shubhamkaroti Disclosure of Inventory Q2 24-25.pdf19 Oct 2024
Proforma of Agreement for saleFile: Shubhamkaroti CHS ATS 31 July 2024.pdf1 Aug 2024
Proforma of Allotment letterFile: Shubhamkaroti Almt Letter 31 July 2024.pdf1 Aug 2024
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate by Developer.pdf10 Jul 2024
CERSAI detailsFile: 11 CERSAI UNDERTAKING BY PROMOTER.pdf10 Jul 2024
CERSAI detailsFile: CERSAI_Search_Report_200313133206_For_Asset_Based_Search_09_07_2024_17_12_29_405.pdf10 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 CA CERTIFICATE.pdf10 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: 17 Declaration Bank Acct by Developer Order No 34.pdf10 Jul 2024
Other - LegalFile: ANNEXURE A.pdf10 Jul 2024
Details of encumbrances concerned to FinanceFile: 3 Non Encumbrances FINANCIAL.pdf22 Jun 2024
Details of encumbrances concerned to FinanceFile: 4 Non Encumbrance LEGAL.pdf22 Jun 2024
Details of encumbrances concerned to LegalFile: 3 Non Encumbrances FINANCIAL.pdf22 Jun 2024
Details of encumbrances concerned to LegalFile: 4 Non Encumbrance LEGAL.pdf22 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 14 Disclosure of Interest in Other Real Estate Organization - SHRINIVAS CHAPHALKAR.pdf22 Jun 2024
Layout approvalFile: 5 Layout Plan.pdf21 Jun 2024
Building plan approvalFile: 6 Building Plan_1.pdf21 Jun 2024
Building plan approvalFile: 6 Building Plan_2.pdf21 Jun 2024
PAN CardFile: 1 PAN CARD.PDF21 Jun 2024
Copy of the legal title reportFile: 2 Legal Title Report FORM A.pdf21 Jun 2024
Copy of Layout Approval (in case of layout)File: 5 Layout Plan.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan_1.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan_2.pdf21 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: 7 Shubhamkaroti CC.pdf21 Jun 2024
Declaration in FORM BFile: FORM B AFFIDAVIT CUM DECLARATION.pdf21 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 14 Disclosure of Interest in Other Real Estate Organization - RISHIKESH CHAPHALKAR.pdf21 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 14 Disclosure of Interest in Other Real Estate Organization - GAURAV CHAPHALKAR.pdf21 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 14 Disclosure of Interest in Other Real Estate Organization - PUSHKARAJ CHAPHALKAR.pdf21 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 14 Disclosure of Interest in Other Real Estate Organization - VIKRAM KARANDIKAR.pdf21 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 14 Disclosure of Interest in Other Real Estate Organization - TEJAS KARANDIKAR.pdf21 Jun 2024
Deviation Report with respect to Allotment letterFile: 18 DEVIATION ALMT.pdf21 Jun 2024
Deviation Report with respect to model copy of AgreementFile: 19 DEVIATION ATS.pdf21 Jun 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ASHOKBAN485A MODEL COLONY SHIVAJINAGAR PUNE 41101630CompletedJun 2023Jun 2023

How this compares with Pune

40%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHUBHAMKAROTI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shivaji Nagar13,700+ in Pune

Builder: CHAPHALKAR KARANDIKAR DEVELOPERS

CHAPHALKAR KARANDIKAR DEVELOPERS has 10 registrations on MahaRERA, including ASHOKBAN and SHASHI APARTMENTS. Its filings disclose 14 earlier MahaRERA projects: declares 8 of 9 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SHUBHAMKAROTI is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHUBHAMKAROTI?

The registered promoter entity is CHAPHALKAR KARANDIKAR DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAOFC8877F2ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHUBHAMKAROTI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHUBHAMKAROTI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHUBHAMKAROTI?

The professionals named in the filing: Architect: Ms GNA Architects; Engineer: Er Abhijeet Khade; Chartered Accountant: KHIRE KHANDEKAR KIRLOSKAR; Chartered Accountant: JPNR & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHUBHAMKAROTI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHUBHAMKAROTI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHUBHAMKAROTI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.