Shubh Veda Block 9

By UPSQUARE VENTURES LLP

RG-MH-33413 · RERA P52100080707 · Last updated on MahaRERA portal: 6 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 8 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 completed earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 8 months from the original
0 of 11Construction stages donefurthest along: Excavation, 0%
20 of 32Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

Shubh Veda Block 9 is a Commercial project by UPSQUARE VENTURES LLP in Pune, Maharashtra, registered with MahaRERA as P52100080707 on 26 Jun 2025. Possession is promised by 31 Dec 2028. The completion date has moved by 8 months from the original filing. 12 of the 32 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameShubh Veda Block 9
  • TypeCommercial
  • Location
    • Kalbhor Nagar
    • Akurdi
    • Mawal
    • Pune
    • 411035
  • Pincode411035
  • RERA no.P52100080707
  • ReraGenie IDRG-MH-33413

Builder

  • NameUPSQUARE VENTURES LLP
  • Entity typeOthers
  • GSTIN27AATFR7375Q1ZV
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerAnand Hariram Bansal
  • PartnersAnshul Anand Bhansal, jagmohan Satyanarayan Mittal, Kailash Ramkumar Agarwal, RAJESH Satyanarayan Mittal, Sagar Rameshchand Agarwal, Sagar Rameshchand Agarwal, Sagar Rameshchand Agarwal, Sagar Rameshchand Agarwal, Sagar Rameshchand Agarwal, Sagar Rameshchand Agarwal, Sagar Rameshchand Agarwal, Sagar Rameshchand Agarwal and 4 more
  • PernerKuldeep Devichand Agarwal
  • ParVishal Devichand Agarwal
  • Other registrations3 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredJun 2025First promiseApr 2028Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Jun 2025
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Apr 2028)
  • Buildings1 building record
  • Documents filed80 files

Current status

38%12 of 32 units booked
31.6%Work done, per cost certificate

Figures as on 6 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block-9NA5403232

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Block-9: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Closed/Covered32

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area333 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Jul 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI2042.1
Proposed, not sanctioned2,042 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., SDC Plot No.2, Sector No.29, Ravet, Tal.Haveli, Dist.Pune, Maharashtra.412101
Estimated costRs 8.17 cr
Cost incurredRs 2.58 cr
Work done31.64%
BuildingWingEstimatedIncurred
Block-9NARs 7.35 crRs 2.33 cr
-NARs 81.68 lakhRs 25.84 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSankalp designers
EngineerAkash Appasaheb Bongarde
EngineerMubin Mehmood Shaikh
Chartered AccountantPatel and Sharma
PartnerRole in project
UPSQUARE VENTURES LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA04072501955Apr 2028 → Dec 2028

Reason as filed by the promoterWe would like to inform that a typographical error has been made in the project completion date which was submitted by the consultant. The mentioned date does not align with the originally agreed timeline and appears to be an inadvertent mistake.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 - BLOCK 9 - Q4.pdf6 May 2026
Withdrawal Update Form 2File: FORM 2 - BLOCK 9 - Q4.pdf6 May 2026
Withdrawal Update Form 3File: FORM 3 - BLOCK 9 - Q4.pdf6 May 2026
Withdrawal Update Form 1File: Form1 Block 9- Dec 25.pdf28 Jan 2026
Withdrawal Update Form 2File: Form2 Block 9- Dec 25.pdf28 Jan 2026
Withdrawal Update Form 3File: Form3 Block 9- Dec 25.pdf28 Jan 2026
Withdrawal Update Form 1File: Form1 Block9- Sept 25.pdf29 Nov 2025
Withdrawal Update Form 2File: Form2 Block 9- Sept 25.pdf29 Nov 2025
Withdrawal Update Form 3File: Form3 Block 9- Sept 25.pdf29 Nov 2025
Withdrawal Update Form 1File: FORM 1 - BLOCK 9.pdf14 Jul 2025
Withdrawal Update Form 2File: FORM 2 - BLOCK 9.pdf14 Jul 2025
Withdrawal Update Form 3File: FORM 3 - BLOCK 9.pdf14 Jul 2025
Commencement certificateFile: 00 Up square Commencement-revised.pdf11 Jul 2025
Declaration and undertaking (Annexure A)File: DECLARATION CUM UNDERTAKING.pdf11 Jul 2025
Declaration and undertaking (Annexure A)File: DECLARATION CUM UNDERTAKING.pdf11 Jul 2025
Withdrawal Update Form 1File: FORM 1 - BLOCK 9.pdf11 Jul 2025
Withdrawal Update Form 1File: FORM 1 - BLOCK 9.pdf11 Jul 2025
Withdrawal Update Form 1File: FORM 1 - BLOCK 9.pdf11 Jul 2025
Withdrawal Update Form 1File: FORM 1 - BLOCK 9.pdf11 Jul 2025
Withdrawal Update Form 1File: FORM 1 - BLOCK 9.pdf11 Jul 2025
Withdrawal Update Form 2File: FORM 2 - ENGG CERTIFICATE - BLOCK 9.pdf11 Jul 2025
Withdrawal Update Form 2File: FORM 2 - ENGG CERTIFICATE - BLOCK 9.pdf11 Jul 2025
Withdrawal Update Form 2File: FORM 2 - ENGG CERTIFICATE - BLOCK 9.pdf11 Jul 2025
Withdrawal Update Form 2File: FORM 2 - ENGG CERTIFICATE - BLOCK 9.pdf11 Jul 2025
Withdrawal Update Form 2File: FORM 2 - BLOCK 9.pdf11 Jul 2025
Withdrawal Update Form 3File: FORM 3 - BLOCK 9.pdf11 Jul 2025
Withdrawal Update Form 3File: FORM 3 - BLOCK 9.pdf11 Jul 2025
Withdrawal Update Form 3File: FORM 3 - BLOCK 9.pdf11 Jul 2025
Withdrawal Update Form 3File: FORM 3 - BLOCK 9.pdf11 Jul 2025
Withdrawal Update Form 3File: FORM 3 - BLOCK 9.pdf11 Jul 2025
Other - TechnicalFile: IOD - SHUBH VEDA_11zon Compressed.pdf9 Jun 2025
Other - TechnicalFile: Revised LAND AREA CLARIFICATION - BLOCK 9.pdf9 Jun 2025
Other - TechnicalFile: CC Mail.pdf6 Jun 2025
Other - LegalFile: UPSQUARE CONVEYANCE DEED-26-09-2023-1-13.pdf27 May 2025
Other - LegalFile: Deed of Conveyance_removed 14 onwards.pdf27 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: VISHAL SURESH AGARWAL - ANNEXURE A.pdf27 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: VISHAL DEVICHAND AGARWAL - ANNEXURE A.pdf27 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - BLOCK 9.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGG CERTIFICATE - BLOCK 9.pdf30 Apr 2025
Other - TechnicalFile: DECLARATION NO OF PARKING BLOCK 9.pdf30 Apr 2025
Other - TechnicalFile: DECLARATION CUM UNDERTAKING.pdf30 Apr 2025
Layout approvalFile: HPSC0587_compressed (2)_11zon.pdf25 Apr 2025
Building plan approvalFile: 02 Basement 1_4_11zon.pdf25 Apr 2025
Building plan approvalFile: 10 Block 09 Maz GF 1 _1_11zon.pdf25 Apr 2025
Building plan approvalFile: 11 Block 09 2 3_2_11zon.pdf25 Apr 2025
Copy of the legal title reportFile: Sent_Shubh_Veda_Block9 stamped.pdf25 Apr 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES CONCERNED TO FINANCE.pdf25 Apr 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES CONCERNED TO LEGAL.pdf25 Apr 2025
Copy of Layout Approval (in case of layout)File: HPSC0587_compressed (2)_11zon.pdf25 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 11 Block 09 2 3_2_11zon.pdf25 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 10 Block 09 Maz GF 1 _1_11zon.pdf25 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 02 Basement 1_4_11zon.pdf25 Apr 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCES CONCERNED TO FINANCE.pdf25 Apr 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCES CONCERNED TO LEGAL.pdf25 Apr 2025
Other - TechnicalFile: RERA AUTHORITY LETTER.pdf25 Apr 2025
Other - TechnicalFile: Clarification Regarding Land Area.pdf25 Apr 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report AGREEMENT.pdf25 Apr 2025
PAN CardFile: 02 PAN Card.pdf1 Apr 2025
Proforma of Allotment letterFile: Allotment Letter.pdf1 Apr 2025
Declaration in FORM BFile: FORM B - ON STAMP PAPER.pdf1 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTI BLOCK 9 (1).pdf1 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Up square Commencement.pdf1 Apr 2025
Declaration about Commencement CertificateFile: Declaration about commencement Certificate.pdf1 Apr 2025
CERSAI detailsFile: UNDERTAKING FOR NO CHARGE.pdf1 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A - BANK ACCOUNT DECLARATION.pdf1 Apr 2025
Deviation Report with respect to Allotment letterFile: Deviation Report ALLOTEMENT.pdf1 Apr 2025
Proforma of Agreement for saleFile: Model Agreement For Sale - Do Not Share With Client.pdf1 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: RAJESH MITTAL - ANNEXURE A.pdf1 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: VISHAL SUMERCHAND AGARWAL - ANNEXURE A.pdf1 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: VISHAL DEVICHAND AGARWAL - ANNEXURE A.pdf1 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: UPSQUARE VENTURES LLP - ANNEXURE A.pdf1 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: SURAJ SUMERCHAND AGARWAL - ANNEXURE A.pdf1 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: SAGAR AGARWAL - ANNEXURE A.pdf1 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: KULDEEP AGARWAL - ANNEXURE A.pdf1 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: KAILASH AGARWAL - ANNEXURE A.pdf1 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: JAGMOHAN MITTAL - ANNEXURE A.pdf1 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: ANSHUL BANSAL - ANNEXURE A.pdf1 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: ANAND BANSAL - ANNEXURE A.pdf1 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B - BANK ACCOUNT DECLARATION.pdf1 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE FOR SECURED UNSECURED FINANACE.pdf1 Apr 2025

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SHUBH VEDA Tower E F G and Block 8P52100080358Akurdi, Pune595May 2025OngoingDec 2030Not due yet
Shubh Veda Block 1 2 3 4 5CS No 4663 4664P 4665P Taluka Mawal Village Akurdi Pune 411019142-OngoingApr 2028Apr 2028

How this compares with Pune

38%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 8 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shubh Veda Block 9 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalbhor Nagar13,700+ in Pune

Builder: UPSQUARE VENTURES LLP

UPSQUARE VENTURES LLP has 4 registrations on MahaRERA, including Shubh Veda Block 1,2,3,4,5 and SHUBH VEDA Tower E F G and Block 8. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Shubh Veda Block 9 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shubh Veda Block 9?

The registered promoter entity is UPSQUARE VENTURES LLP, an others as per the filing. Its GSTIN 27AATFR7375Q1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shubh Veda Block 9?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shubh Veda Block 9?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shubh Veda Block 9?

The professionals named in the filing: Architect: Sankalp designers; Engineer: Akash Appasaheb Bongarde; Engineer: Mubin Mehmood Shaikh; Chartered Accountant: Patel and Sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shubh Veda Block 9?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shubh Veda Block 9. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shubh Veda Block 9 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.