Home / Browse projects / Pune, Maharashtra / VITTHAL CAPITAL
VITTHAL CAPITAL
RG-MH-09400 · RERA P52100004519 · Last updated on MahaRERA portal: 15 Mar 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VITTHAL CAPITAL is a Residential / Group Housing project by M/S A. V. CORPORATION in Pune, Maharashtra, registered with MahaRERA as P52100004519 on 9 Aug 2017. Possession was promised by 23 Dec 2025 and is now 10 months past that date. The completion date has moved by 24 months from the original filing. 139 of the 175 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameVITTHAL CAPITAL
- TypeResidential / Group Housing
- Location
- CHIKHALI
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 411035
- Pincode411035
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100004519
- ReraGenie IDRG-MH-09400
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on9 Aug 2017
- Promised completion23 Dec 2025
- Revised completionRevised to 23 Dec 2025 (originally 25 Dec 2023)
- Buildings1 building record
- Documents filed149 files
Current status
Figures as on 15 Mar 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VITTHAL CAPITAL | NA | 12 | 12 | 152 | 23 | 175 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.
VITTHAL CAPITAL: 89% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 15 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed344
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership3
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| RAVINDRA GULAB JADHAV | Chikhali Bk. | Pune |
| VIJENDRA MURLIDHAR JADHAV | Pimpri Chinchawad (M Corp.) | Pune |
| HEMANT BALU JADHAV | Chikhali Bk. | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NemdePatil Creatives |
| Engineer | Rathis Group |
| Chartered Accountant | Pratik Navlakha and Associates |
| Partner | Role in project |
|---|---|
| M/S A. V. CORPORATION | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterConstruction work of project is completed, the extension is sought for the, installation of elevators and NOC for the same is obtained, and government procedures in respect of project completion are in progress.
Reason as filed by the promoterThe promoter is constrained to request an extension of the project completion date to 23rd December 2025 due to the incomplete construction work. The extension is essential to enable the promoter to complete the remaining construction activities and fulfill all obligations towards the homebuyers in a timely and systematic manner.
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12600567 | MAHESH RANCHHOD MALI | M/S A. V. CORPORATION | 02/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Apr 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Apr 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed149
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 149 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 3)File: Final Upload.pdf | 15 Mar 2025 |
| Certificates of CA (Form 3)File: Final Upload.pdf | 15 Mar 2025 |
| Other - TechnicalFile: PERT Chart.pdf | 15 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 23-24 Q1.pdf | 12 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q3 (FY 24-25).pdf | 11 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 FY 23-24 Q1_5_11zon.pdf | 10 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 FY 23-24 Q2_6_11zon.pdf | 10 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 FY 23-24 Q3_7_11zon.pdf | 10 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 FY 23-24 Q4_1_11zon.pdf | 10 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 FY 24-25 Q1_2_11zon.pdf | 10 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 FY 24-25 Q2_3_11zon.pdf | 10 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 24-25 Q3.pdf | 10 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 24-25 Q2.pdf | 10 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 24-25 Q1.pdf | 10 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 23-24 Q4.pdf | 10 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 23-24 Q3.pdf | 10 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 23-24 Q2.pdf | 10 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 22-23 Q4.pdf | 10 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 22-23 Q3.pdf | 10 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 22-23 Q2.pdf | 10 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 22-23 Q1.pdf | 10 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 21-22 Q4.pdf | 10 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 21-22 Q3.pdf | 10 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 21-22 Q2.pdf | 10 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 21-22 Q1.pdf | 10 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 20-21.pdf | 10 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 19-20.pdf | 10 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 18-19.pdf | 10 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 17-18.pdf | 10 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: FY 21-22 Q4_8_11zon.pdf | 5 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: FY 22-23 Q1_9_11zon.pdf | 5 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: FY 22-23 Q2_10_11zon.pdf | 5 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: FY 22-23 Q3_11_11zon.pdf | 5 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: FY 22-23 Q4_12_11zon.pdf | 5 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: FY 23-24 Q1_1_11zon.pdf | 5 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: FY 23-24 Q2_2_11zon.pdf | 5 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: FY 23-24 Q3_3_11zon.pdf | 5 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: FY 23-24 Q4_4_11zon.pdf | 5 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: FY 24-25 Q1_5_11zon.pdf | 5 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: FY 24-25 Q2_6_11zon.pdf | 5 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: FY 24-25 Q3_7_11zon.pdf | 5 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (FY 20-21).pdf | 25 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q2 (FY 24-25).pdf | 25 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q1 (FY 24-25).pdf | 25 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q4 (FY 23-24).pdf | 25 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q3 (FY 23-24).pdf | 25 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q2 (FY 23-24).pdf | 25 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q1 (FY 23-24).pdf | 25 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q4 (FY 22-23).pdf | 25 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q3 (FY 22-23).pdf | 25 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q2 (FY 22-23).pdf | 25 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q1 (FY 22-23).pdf | 25 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q4 (FY 21-22).pdf | 25 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q3 (FY 21-22).pdf | 25 Feb 2025 |
| Declaration in FORM BFile: Form B.pdf | 26 Dec 2024 |
| Declaration about Commencement CertificateFile: Declaration Of CC.pdf | 26 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 22-23 Final.pdf | 26 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24 Final.pdf | 26 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24.pdf | 26 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 22-23.pdf | 25 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 23-24.pdf | 25 Apr 2024 |
| Certificates of CA (Form 3)File: Jun 22 Sign_.pdf | 25 Apr 2024 |
| Certificates of CA (Form 3)File: Sept 22 Sign_.pdf | 25 Apr 2024 |
| Certificates of CA (Form 3)File: Dec 22 Sign_.pdf | 25 Apr 2024 |
| Certificates of CA (Form 3)File: March 23 sign_.pdf | 25 Apr 2024 |
| Certificates of CA (Form 3)File: June 23 sign_.pdf | 25 Apr 2024 |
| Certificates of CA (Form 3)File: Sept 23 sign_.pdf | 25 Apr 2024 |
| Certificates of CA (Form 3)File: Dec 23 sign_.pdf | 25 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Vitthal Capital form 5.pdf | 25 Apr 2024 |
| Other - LegalFile: Signed declaration.pdf | 1 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: Legal Encumbrances.pdf | 16 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Legal Encumbrances.pdf | 16 Feb 2023 |
| Declaration about Commencement CertificateFile: Declaration of commencement.pdf | 16 Feb 2023 |
| CERSAI detailsFile: CERSAI REPORT.pdf | 16 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold_compressed (1).pdf | 16 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Diaclosure of Interest.pdf | 16 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank.pdf | 16 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: CA Ankita Bora certificate March 18.pdf | 14 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA certificate March 19.pdf | 14 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA certificate March 20.pdf | 14 Feb 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Vitthal SagaPM1260002500393 | Akurdi, Pune | 18 | Jul 2025 | Ongoing | Dec 2028 | Not due yet |
| VITTHAL LANDMARKP52100027650 | MOSHI PUNE, Pune | - | Dec 2020 | Ongoing | Jun 2028 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 149 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep VITTHAL CAPITAL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHIKHALI13,700+ in Pune
Filed coordinates, straight-line distance. 193 registered projects within 2 km.
YOO PRISTINE
M/S MEGAPILLAR REALTY LLP
ENVOGUE2
Zenethist Realty LLP
ONE PLATINUM
MATRIX DEVELOPERS
Vasant Estella
SHRIKRISHNA WONDER PROPERTIES
MY HOME AKURDI
RAVET LAND DEVELOPERS LLP
V - ONE HEARTLAND
DELTA RESIDENCY LLP
Builder: M/S A. V. CORPORATION
M/S A. V. CORPORATION has 2 registrations on MahaRERA, including VITTHAL CAPITAL and Vitthal Empire Phase-II. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that VITTHAL CAPITAL shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if VITTHAL CAPITAL is delayed beyond 23 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VITTHAL CAPITAL?
The registered promoter entity is M/S A. V. CORPORATION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VITTHAL CAPITAL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against VITTHAL CAPITAL?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for VITTHAL CAPITAL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VITTHAL CAPITAL?
The professionals named in the filing: Architect: NemdePatil Creatives; Engineer: Rathis Group; Chartered Accountant: Pratik Navlakha and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VITTHAL CAPITAL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback