ENVOGUE2

By Zenethist Realty LLP

RG-MH-19400 · RERA P52100077680 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
10 of 40Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 50%
303 of 449Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

ENVOGUE2 is a Others project by Zenethist Realty LLP in Pune, Maharashtra, registered with MahaRERA as P52100077680 on 21 Oct 2024. Possession is promised by 31 Dec 2029. 146 of the 449 units on this registration are recorded sold or booked, and 10 of 40 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameENVOGUE2
  • TypeOthers
  • Location
    • Akurdi
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411035
  • Pincode411035
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100077680
  • ReraGenie IDRG-MH-19400

Builder

  • NameZenethist Realty LLP
  • Entity typePartnership
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Oct 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings4 building records
  • Documents filed113 files

Current status

33%146 of 449 units booked
14.2%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing K1NA41361440144
Wing K2NA41361440144
Commercial 02NA1101717
Wing K3NA41361440144

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 40 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 50%.

Wing K127%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)50%
Plinth0%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks12%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing K227%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)50%
Plinth0%
Stilt Floor100%
Slabs of Super Structure12%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks12%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Commercial 0248%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)50%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing K327%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)50%
Plinth0%
Stilt Floor100%
Slabs of Super Structure12%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks12%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1350

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,350
Closed/Covered1,350
BuildingClosed/CoveredTotal
Wing K1236236
Wing K2392392
Commercial 029696
Wing K3626626

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,561 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI66486.23
Proposed, not sanctioned66,486 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch928 MANTRI CENTRE F C ROAD PUNE 411004
Estimated costRs 393.93 cr
Cost incurredRs 55.78 cr
Work done14.16%
BuildingWingEstimatedIncurred
Wing K1NARs 98.48 crRs 11.71 cr
Wing K2NARs 98.48 crRs 21.20 cr
Wing K3NARs 98.48 crRs 22.87 cr
Commercial 02NARs 59.09 cr-
-NARs 39.39 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKIMAYA ASSOCIATES
EngineerPHAROHAJ MAHABRI
EngineerAmol Jambhale
EngineerRajesh Gupta
Chartered AccountantDEO & COMPANY
Chartered AccountantSK Bhageria & Associates
Chartered AccountantDarshan Shah
PartnerRole in project
Zenethist Realty LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12602384Surajsingh Daljitsingh BhadoriyaZenethist Realty LLP23/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.PDF27 Apr 2026
Withdrawal Update Form 2File: FORM 2.PDF27 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf27 Apr 2026
Layout approvalFile: Highlighted Layout.pdf17 Apr 2026
Building plan approvalFile: 2.pdf17 Apr 2026
Building plan approvalFile: 3.pdf17 Apr 2026
Building plan approvalFile: 4.pdf17 Apr 2026
Building plan approvalFile: 5.pdf17 Apr 2026
Building plan approvalFile: 6.pdf17 Apr 2026
Building plan approvalFile: 7.pdf17 Apr 2026
Building plan approvalFile: 8.pdf17 Apr 2026
Building plan approvalFile: 9.pdf17 Apr 2026
Building plan approvalFile: 10.pdf17 Apr 2026
Building plan approvalFile: 11.pdf17 Apr 2026
Building plan approvalFile: 12.pdf17 Apr 2026
Building plan approvalFile: 13.pdf17 Apr 2026
Building plan approvalFile: 14.pdf17 Apr 2026
Building plan approvalFile: 15.pdf17 Apr 2026
Building plan approvalFile: 16.pdf17 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A.PDF17 Apr 2026
Layout approvalFile: Layout.pdf15 Apr 2026
Layout approvalFile: Layout.pdf15 Apr 2026
Withdrawal Update Form 1File: FORM 1 Q3.PDF2 Feb 2026
Withdrawal Update Form 2File: FORM 2 LATEST.PDF2 Feb 2026
Withdrawal Update Form 3File: FORM 3 LATEST_compressed.pdf2 Feb 2026
Withdrawal Update Form 1File: FORM 1 UPDATED.pdf16 Jan 2026
Withdrawal Update Form 2File: FORM 2.PDF16 Jan 2026
Withdrawal Update Form 3File: FORM 3 ENVOGUE2_compressed.pdf16 Jan 2026
Layout approvalFile: Revised Layout Plan.pdf13 Jan 2026
Withdrawal Update Form 1File: ENVOGUE2 FORM 1.PDF6 Jan 2026
Withdrawal Update Form 2File: Envogue2 Form 2.pdf6 Jan 2026
Withdrawal Update Form 3File: Envogue2 Form 3.pdf6 Jan 2026
Form 5 (FY 2024-2025)File: Envogue 2 Form 5 (1).PDF18 Dec 2025
Layout approvalFile: LAYOUT.pdf24 Nov 2025
Building plan approvalFile: 13 OF 16 K3.pdf24 Nov 2025
Building plan approvalFile: 14 OF 16 BUILDING PLAN APPROVAL K3.pdf24 Nov 2025
Layout approvalFile: layout.pdf29 Sep 2025
Building plan approvalFile: 2.pdf29 Sep 2025
Building plan approvalFile: 3.pdf29 Sep 2025
Building plan approvalFile: 4.pdf29 Sep 2025
Building plan approvalFile: 5.pdf29 Sep 2025
Building plan approvalFile: 6.pdf29 Sep 2025
Building plan approvalFile: 7.pdf29 Sep 2025
Building plan approvalFile: 8.pdf29 Sep 2025
Building plan approvalFile: 9.pdf29 Sep 2025
Building plan approvalFile: 10.pdf29 Sep 2025
Building plan approvalFile: 11.pdf29 Sep 2025
Building plan approvalFile: 12 (2).pdf29 Sep 2025
Building plan approvalFile: 13.pdf29 Sep 2025
Building plan approvalFile: 14.pdf29 Sep 2025
Building plan approvalFile: 15.pdf29 Sep 2025
Withdrawal Update Form 1File: ENVOGUE2 FORM 1.PDF29 Sep 2025
Withdrawal Update Form 2File: Envogue2 Form 2.pdf29 Sep 2025
Withdrawal Update Form 3File: Envogue2 Form 3.pdf29 Sep 2025
Withdrawal Update Form 1File: ENVOGUE2 FORM 1.PDF8 Sep 2025
Withdrawal Update Form 2File: ENVOGUE2 FORM 2.pdf8 Sep 2025
Withdrawal Update Form 3File: ENVOGUE2 FORM 3.pdf8 Sep 2025
Withdrawal Update Form 1File: ENVOGUE2 FORM 1.PDF27 Aug 2025
Withdrawal Update Form 2File: ENVOGUE2 FORM 2.pdf27 Aug 2025
Withdrawal Update Form 3File: ENVOGUE2 FORM 3.pdf27 Aug 2025
Withdrawal Update Form 1File: ENVOGUE2 FORM 1.PDF26 Aug 2025
Withdrawal Update Form 1File: ENVOGUE2 FORM 1.PDF26 Aug 2025
Withdrawal Update Form 2File: ENVOGUE2 FORM 2.pdf26 Aug 2025
Withdrawal Update Form 2File: ENVOGUE2 FORM 2.pdf26 Aug 2025
Withdrawal Update Form 3File: ENVOGUE2 FORM 3.pdf26 Aug 2025
Withdrawal Update Form 3File: ENVOGUE2 FORM 3.pdf26 Aug 2025
Form 1File: ENVOGUE2 FORM 1.PDF11 Jul 2025
Form 2File: ENVOGUE2 FORM 2.pdf11 Jul 2025
Form 3File: ENVOGUE2 FORM 3.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: ENVOGUE2 SOLD INVENTORY.PDF11 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ENVOGUE2 FORM 3.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENVOGUE2 FORM 2.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ENVOGUE2 FORM 1.PDF12 Apr 2025
Disclosure of sold/ booked inventoryFile: ENVOGUE2 SOLD INVENTORY.PDF12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF DECLARATION FOR ENVOGUE2 ON RERA.PDF20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ENVOGUE2 FORM 1.PDF19 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY ENVOGUE2.PDF19 Jan 2025
Copy of the legal title reportFile: RERA title certificate DT 11042024.pdf12 Nov 2024
Copy of the legal title reportFile: RERA title certificate DT 11042024.pdf12 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf17 Oct 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
K TOWN PHASE 1P52100028608KIWALE, PuneMar 2021Certificate SignedSep 2025Feb 2025

How this compares with Pune

33%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ENVOGUE2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Akurdi13,700+ in Pune

2 kmENVOGUE2Completed 30Lapsed / revoked 29Other 54Dot size: filed unitsN

Filed coordinates, straight-line distance. 113 registered projects within 2 km.

Builder: Zenethist Realty LLP

Zenethist Realty LLP has 1 registration on MahaRERA, including ENVOGUE2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ENVOGUE2 is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ENVOGUE2?

The registered promoter entity is Zenethist Realty LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ENVOGUE2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ENVOGUE2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ENVOGUE2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ENVOGUE2?

The professionals named in the filing: Architect: KIMAYA ASSOCIATES; Engineer: PHAROHAJ MAHABRI; Engineer: Amol Jambhale; Engineer: Rajesh Gupta; Chartered Accountant: DEO & COMPANY; Chartered Accountant: SK Bhageria & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ENVOGUE2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ENVOGUE2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ENVOGUE2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.