ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Shubh Vastu Phase III

Registered No litigation declared Residential / Group Housing project

Shubh Vastu Phase III

By SHUBH HOMES

RG-MH-06160 · RERA P51700052762 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
16 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 90%
98 of 112Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

Shubh Vastu Phase III is a Residential / Group Housing project by SHUBH HOMES in Thane, Maharashtra, registered with MahaRERA as P51700052762 on 22 Sep 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 14 of the 112 units on this registration are recorded sold or booked, and 16 of 22 construction stages are filed complete.

At a glance

Project

  • NameShubh Vastu Phase III
  • TypeResidential / Group Housing
  • Location
    • Survey No 143
    • Hissa No 2A(P)
    • Shirgaon
    • Badlapur
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700052762
  • ReraGenie IDRG-MH-06160

Builder

  • NameSHUBH HOMES
  • Entity typePartnership
  • PartnersBHARAT NARAYAN PATEL, JIGNESH BHARATBHAI SHAH, MUKESH SHAMJI SATRA, SHEKHAR PRABHAKAR PARAB, SUNIL KANAYALAL NIHALANI, SURESH NARAYAN PATEL, VIPUL BHARAT SHAH, LALJI DAMJI SHANKHALA, SHANTILAL SHIVJI PATEL, POOJA KAILASH DESAI, JANARDAN LAHU DAYARE, KAILAS BABAN MHASKAR
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredSep 2023First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Sep 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings2 building records
  • Documents filed56 files

Current status

12%14 of 112 units booked
89.5%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing DNA8756056
Wing ENA8756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 90%.

Wing D81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Wing E81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed134

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots134
Closed/Covered2
Open Space132
BuildingClosed/CoveredOpen SpaceTotal
Wing D16667
Wing E16667

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Devidas Sadashiv PatilBadlapur (M Cl)Thane

Approvals and building plan

Sanctioning authorityKulgaon Badlapur Nagar Parishad
Permissible FSI4520.13
Proposed, not sanctioned4,520 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLOTUS HOUSE SHOP NO 5-12 KATRAP ROAD BADLAPUR EAST
Estimated costRs 14.48 cr
Cost incurredRs 12.96 cr
Work done89.55%
BuildingWingEstimatedIncurred
Wing DNARs 6.60 crRs 6.27 cr
Wing ENARs 6.56 crRs 6.23 cr
-NARs 1.32 crRs 46.06 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchitects Inc
EngineerS V Patel & Associates
Chartered AccountantMukesh Gurnani
Chartered AccountantVRP & Associates
PartnerRole in project
SHUBH HOMES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA08012619364Dec 2025 → Dec 2026

Reason as filed by the promoterThe Promoter respectfully submits that the construction of the Project is substantially completed, with more than 90% of the total construction work already executed. The structural work and all major internal works of the buildings have been fully completed. At present, only certain external development works such as finishing of peripheral areas, internal access roads, landscaping, and amenities-related works are pending. These works are ancillary in nature and do not affect the structural stability or habitability of the Project. Further, the Occupancy Certificate (OC) has not yet been obta

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 31122025 Q3.pdf30 Jun 2026
Withdrawal Update Form 2File: Form 2 31122025 Q3.pdf30 Jun 2026
Withdrawal Update Form 3File: Form 3 Shubh Homes C and D 31122025.pdf30 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A.pdf9 Feb 2026
Withdrawal Update Form 1File: Form 1 31122025 Q3.pdf27 Jan 2026
Withdrawal Update Form 2File: Form 2 31122025 Q3.pdf27 Jan 2026
Withdrawal Update Form 3File: Form 3 Shubh Homes C and D 31122025.pdf27 Jan 2026
Withdrawal Update Form 1File: Architect's Certificate.pdf8 Jan 2026
Withdrawal Update Form 1File: Architect's Certificate.pdf8 Jan 2026
Withdrawal Update Form 2File: Form 2 30092025 Q2.pdf8 Jan 2026
Withdrawal Update Form 2File: Form 2 30092025 Q2.pdf8 Jan 2026
Withdrawal Update Form 3File: Form 3 Shubh Homes C and D 30062025.pdf8 Jan 2026
Withdrawal Update Form 3File: Form 3 Shubh Homes C and D 30092025.pdf8 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 Shubh Homes Phase III.pdf30 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 D and E.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30062024 D and E.pdf23 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30092024 D and E.pdf23 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30062024 D and E.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30092024 D and E.pdf17 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SIgned-Form 5 Shubh Homes phase 3.pdf29 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: IMG-20230914-WA0050.pdf14 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 9 Annexture A-3 Vipul Shah.pdf2 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 10 Annexture A-9 Lalji Shankala.pdf2 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 11 Annexture A-8 Shantilal Patel.pdf2 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Pooja Desai.pdf2 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Mukesh Satra.pdf2 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1339-RERA CERTIFICATE.pdf2 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate.pdf30 Jun 2023
Proforma of Agreement for saleFile: Draft AFS.pdf30 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_11zon.pdf24 Jun 2023
Proforma of Allotment letterFile: Allotment Letter.pdf20 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration Format A.pdf20 Jun 2023
Deviation Report with respect to Allotment letterFile: No Deviation Wrt Allotment Letter.pdf20 Jun 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation Wrt Agreement.pdf20 Jun 2023
Layout approvalFile: Plan Layout.pdf19 Jun 2023
Building plan approvalFile: Floor Plan D.pdf19 Jun 2023
Building plan approvalFile: Floor Plan E.pdf19 Jun 2023
PAN CardFile: Pan Card - Shubh Homes.pdf19 Jun 2023
Copy of the legal title reportFile: Legal Title Report.pdf19 Jun 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance.pdf19 Jun 2023
Details of encumbrances concerned to LegalFile: No Encumbrance.pdf19 Jun 2023
Copy of Layout Approval (in case of layout)File: Plan Layout.pdf19 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Floor Plan D.pdf19 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Floor Plan E.pdf19 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_11zon.pdf19 Jun 2023
Declaration about Commencement CertificateFile: Form D.pdf19 Jun 2023
Declaration in FORM BFile: Form - B Shubh Homes.pdf19 Jun 2023
CERSAI detailsFile: CERSAI_Search_Report_200271888533_For_Asset_Based_Search_19_06_2023_18_06_41_650.pdf19 Jun 2023
CERSAI detailsFile: CERSAI Declaraion.pdf19 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Annexture A-2 Bharat Patel.pdf19 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Annexture A-5 Janardan Dayare.pdf19 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 3 Annexture A-1 Jignesh Shah.pdf19 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 4 Annexture A-4 Kailash Mhaskar.pdf19 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 6 Annexure A Shekhar Parab.pdf19 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 7 Annexture A-7 Sunil Nihalani.pdf19 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 8 Annexture A-6 Suresh Patel.pdf19 Jun 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SHUBH VASTU WING B AND CP51700030393AMBERNATH, Thane227Aug 2021CompletedDec 2025Feb 2025
SHUBH VASTUP51700019303BADLAPUR, Thane-Jan 2019CompletedDec 2022Sep 2022

How this compares with Thane

12%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shubh Vastu Phase III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shirgaon, Badlapur7,600+ in Thane

2 kmShubh Vastu Phase IIICompleted 137Lapsed / revoked 47Other 84Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: SHUBH HOMES

SHUBH HOMES has 3 registrations on MahaRERA, including SHUBH VASTU and SHUBH VASTU WING B AND C. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Shubh Vastu Phase III is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shubh Vastu Phase III?

The registered promoter entity is SHUBH HOMES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shubh Vastu Phase III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shubh Vastu Phase III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shubh Vastu Phase III?

The professionals named in the filing: Architect: Architects Inc; Engineer: S V Patel & Associates; Chartered Accountant: Mukesh Gurnani; Chartered Accountant: VRP & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shubh Vastu Phase III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shubh Vastu Phase III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shubh Vastu Phase III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.