Registration lapsed No litigation declared Residential / Group Housing project

SHUBH SRUSHTI PHASE III

By VINAYAK ENTERPRISES

RG-MH-30588 · RERA P51700032565 · Last updated on MahaRERA portal: 21 Feb 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 17 months past the filed date
  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
May 2025Possession promised17 months past this date
9 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 90%
57 of 210Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

SHUBH SRUSHTI PHASE III is a Residential / Group Housing project by VINAYAK ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700032565 on 11 Jan 2022. Possession was promised by 25 May 2025 and is now 17 months past that date. 153 of the 210 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSHUBH SRUSHTI PHASE III
  • TypeResidential / Group Housing
  • Location
    • KATRAP VILLAGE
    • KATRAP
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700032565
  • ReraGenie IDRG-MH-30588

Builder

  • NameVINAYAK ENTERPRISES
  • Entity typePartnership
  • GSTIN27AAKFV6626M1ZG
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersSURESH NARAYAN PATEL, RAHUL SUDHIR WADNERE, MAYUR NARHARI PATIL, NARAYAN SUDAM PATIL, BHARAT NARAYAN PATEL
  • Other registrations9 more →
  • Completed2 of 10
  • No longer live6 lapsed, de-registered or revoked

Key dates

17 months past promisethis monthRegisteredJan 2022PromisedMay 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on11 Jan 2022
  • Promised completion25 May 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed75 files

Current status

73%153 of 210 units booked
100.0%Work done, per cost certificate

Figures as on 21 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING JNA17151200120
K WINGNA171590090

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.

WING J45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
K WING45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed313

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots313
Closed/Covered2
Open Space311
BuildingClosed/CoveredOpen SpaceTotal
WING J1311312
K WING101

Land and ownership6

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area10,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Aug 2025
LandownerVillageDistrict
KUMUD UDAY BHOIRKalyan-Dombivali (M Corp.)Thane
POONAM AMAR JADHAVThane (M Corp.)Thane
PRAKASH LAXMAN GHORPADEBadlapur (M Cl)Thane
ULHAS LAXMAN GHORPADEBadlapur (M Cl)Thane
UMESH BALWANTRAO PATILBadlapur (M Cl)Thane
VIJAYA KIRAN PATILBHAYANDARThane

Approvals and building plan

Sanctioning authorityKulgoan Badlapur Municipal Council
Permissible FSI10000.0
Proposed, not sanctioned10,000 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKULGAON BADLAPUR
Estimated costRs 41.08 cr
Cost incurredRs 41.08 cr
Work done100.0%
BuildingWingEstimatedIncurred
K WINGNARs 21.91 crRs 21.91 cr
WING JNARs 15.44 crRs 15.44 cr
-NARs 3.73 crRs 3.73 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCHITECTS INC
EngineerS V PATEL & ASSOCIATES
Chartered AccountantGHAISAS & CO
PartnerRole in project
VINAYAK ENTERPRISES-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12603653Swapnil Nilkanth KondraVINAYAK ENTERPRISES13/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: 1 form.pdf21 Feb 2026
Form 2File: 2 form.pdf21 Feb 2026
Form 3File: 3 form.pdf21 Feb 2026
Disclosure of Sold and Booked InventoryFile: 3 form.pdf21 Feb 2026
Form 1File: 1 form.pdf21 Feb 2026
Form 2File: 2 form.pdf21 Feb 2026
Form 3File: 3 form.pdf21 Feb 2026
Disclosure of Sold and Booked InventoryFile: 3 form.pdf21 Feb 2026
Form 1File: 1 form.pdf21 Feb 2026
Form 2File: 2 form.pdf21 Feb 2026
Form 3File: 3 form.pdf21 Feb 2026
Disclosure of Sold and Booked InventoryFile: 3 form.pdf21 Feb 2026
Form 1File: FORM 1 31-12-2022.pdf21 Jan 2026
Form 2File: Form 2 oct-dec 22.pdf21 Jan 2026
Form 3File: Oct - Dec 22.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: Oct - Dec 22.pdf21 Jan 2026
Form 1File: FORM 1 31-03-2023.pdf21 Jan 2026
Form 2File: Form 2 jan-march 23.pdf21 Jan 2026
Form 3File: JAN - March 2023_compressed.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31-03-2023.pdf21 Jan 2026
Form 1File: FORM 1 30-06-2023.pdf21 Jan 2026
Form 2File: Form 2 apr-june 23.pdf21 Jan 2026
Form 3File: Apr-June 2023_compressed.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 30-06-2023.pdf21 Jan 2026
Form 1File: FORM 1 30-09-2023.pdf21 Jan 2026
Form 2File: Form 2 jul-sep 23.pdf21 Jan 2026
Form 3File: Jully - Sept 2023.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 30-09-2023.pdf21 Jan 2026
Form 1File: FORM 1 31-12-2023.pdf21 Jan 2026
Form 2File: Form 2 oct-dec 23.pdf21 Jan 2026
Form 3File: Oct - Dec 2023_compressed.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31-12-2023.pdf21 Jan 2026
Form 1File: FORM 1 31-03-2024.pdf21 Jan 2026
Form 2File: Form 2 jan-march 24.pdf21 Jan 2026
Form 3File: Jan -March 2024.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31-03-2024.pdf21 Jan 2026
Form 1File: FORM 1 30-06-2024.pdf21 Jan 2026
Form 2File: Form 2 apr-june 24.pdf21 Jan 2026
Form 3File: April -June 2024.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 30-06-2024.pdf21 Jan 2026
Form 1File: FORM 1 30-09-2024.pdf21 Jan 2026
Form 2File: Form 2 jul-sep 24.pdf21 Jan 2026
Form 3File: Jully -Sept 24.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 30-09-2024.pdf21 Jan 2026
Form 1File: FORM 1 30-09-2024.pdf21 Jan 2026
Form 2File: Form 2 oct-dec 24.pdf21 Jan 2026
Form 3File: Oct -Dec 24.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31-12-2024.pdf21 Jan 2026
Form 1File: FORM 1 30-09-2024.pdf21 Jan 2026
Form 2File: Form 2 Jan-March 25.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31-03-2025.pdf21 Jan 2026
Form 3File: Jan - March 25_compressed.pdf21 Jan 2026
Withdrawal Update Form 1File: architect certificate.pdf21 Jan 2026
Withdrawal Update Form 2File: Form 2 Jan-March 25.pdf21 Jan 2026
Withdrawal Update Form 3File: Jan - March 25_compressed.pdf21 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf16 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 final.pdf16 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VINAYAK_compressed.pdf16 Nov 2022
Disclosure of sold/ booked inventoryFile: J1 001-3_merged.pdf1 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ilovepdf_merged (4)_compressed.pdf6 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERIFICATE.pdf30 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3-30-04-compressed.pdf30 Apr 2022
CERSAI detailsFile: CREADAI - Guru Developers.pdf8 Jan 2022
Declaration about Commencement CertificateFile: Format-D.pdf28 Dec 2021
Layout approvalFile: blue print_compressed-1-1.pdf2 Sep 2021
Building plan approvalFile: cc j k.pdf2 Sep 2021
PAN CardFile: Vinayak Enterprises Pan.pdf2 Sep 2021
Copy of the legal title reportFile: legal title report.pdf2 Sep 2021
Details of encumbrancesFile: Vinayak Enterprises.pdf2 Sep 2021
Copy of Layout Approval (in case of layout)File: blue print_compressed-1-1.pdf2 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: cc j k.pdf2 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: cc j k.pdf2 Sep 2021
Declaration in FORM BFile: Form B.pdf2 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf2 Sep 2021
Proforma of Allotment letterFile: FLAT SALE AGREEMENT - BLANK - VINAYAK ENTERPRISES.pdf2 Sep 2021

How this compares with Thane

73%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHUBH SRUSHTI PHASE III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KATRAP7,600+ in Thane

2 kmSHUBH SRUSHTI PHASE IIICompleted 207Lapsed / revoked 80Other 131Dot size: filed unitsN

Filed coordinates, straight-line distance. 418 registered projects within 2 km.

Builder: VINAYAK ENTERPRISES

VINAYAK ENTERPRISES has 10 registrations on MahaRERA, including SHUBH SRUSHTI and Golden Plaza. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that SHUBH SRUSHTI PHASE III shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHUBH SRUSHTI PHASE III is delayed beyond 25 May 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHUBH SRUSHTI PHASE III?

The registered promoter entity is VINAYAK ENTERPRISES, a partnership as per the filing. Its GSTIN 27AAKFV6626M1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHUBH SRUSHTI PHASE III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHUBH SRUSHTI PHASE III?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SHUBH SRUSHTI PHASE III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHUBH SRUSHTI PHASE III?

The professionals named in the filing: Architect: ARCHITECTS INC; Engineer: S V PATEL & ASSOCIATES; Chartered Accountant: GHAISAS & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHUBH SRUSHTI PHASE III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHUBH SRUSHTI PHASE III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHUBH SRUSHTI PHASE III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.