Home / Browse projects / Pune, Maharashtra / Shriyans 3.0
Shriyans 3.0
By SILVER OAK BUILDERS AND DEVELOPERS
RG-MH-58307 · RERA P52100054165 · Last updated on MahaRERA portal: 13 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 15.00 crore secured on the land, in favour of NIDO HOME FINANCE LIMITED
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shriyans 3.0 is a Residential / Group Housing project by SILVER OAK BUILDERS AND DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100054165 on 29 Dec 2023. Possession is promised by 31 Oct 2027.
At a glance
Project
- NameShriyans 3.0
- TypeResidential / Group Housing
- Location
- Punawale
- Mulshi
- Pune
- 411033
- Pincode411033
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100054165
- ReraGenie IDRG-MH-58307
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Dec 2023
- Promised completion31 Oct 2027
- Revised completionNone
- Buildings1 building record
- Documents filed76 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building A | NA | 16 | 14 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 50%.
Building A: 41% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 5% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 13 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 40% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed108
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership7
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Santoshkumar Mahadev Nimbalkar | Pune (CB) | Pune |
| Rajanikant Chandrakant Patange | Sangavi | Pune |
| Rajshri Ranjanikant Patange | Sangavi | Pune |
| Narayan Ramchandra Bankar | Baner | Pune |
| Vaijayanti Narayan Bankar | Baner | Pune |
| Shwetashree Sumit Zagade | Baner | Pune |
| Geetashree Prashant Phulare | Baner | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar Sachin Sutar |
| Engineer | Satish Abasaheb Gagare |
| Chartered Accountant | Phule Wagh & Associates LLP |
| Partner | Role in project |
|---|---|
| SILVER OAK BUILDERS AND DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Jun 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Oct 2027
Documents filed76
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Q1 FY 26-27 Form 1.pdf | 13 Jul 2026 |
| Form 2File: Q1 FY 26-27 Form 2 Shriyans 30 engg.pdf | 13 Jul 2026 |
| Form 3File: Q1 FY 26-27 FORM 3 Chartered Accountant Certificate Shriyans FINAL.pdf | 13 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Q1 FY 26-27 Sold Unsold.pdf | 13 Jul 2026 |
| Form 1File: Q4 FORM 1Architect Certificate.pdf | 25 Apr 2026 |
| Form 2File: Q4 FORM 2 Engineer Certificate.pdf | 25 Apr 2026 |
| Form 3File: Q4 FY 25-26 FORM 3 Chartered Accountant Certificate Shriyans FINAL.pdf | 25 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Q4 Sold Unsold Q4 2025-26.pdf | 25 Apr 2026 |
| Form 1File: Form 1 Architect Certificate 31122025 Q3.pdf | 22 Apr 2026 |
| Form 2File: Form 2 Engineer Certificate Q3.pdf | 22 Apr 2026 |
| Form 3File: Form 3 Chartered Accountant Certificate Shriyans FINAL Q3.pdf | 22 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Decleration of Sold Unsold inventory Q3.pdf | 22 Apr 2026 |
| Form 1File: Form 1 Architect Certificate Q2.pdf | 14 Oct 2025 |
| Form 2File: Form 2 Engineer Certificate Q2.pdf | 14 Oct 2025 |
| Form 3File: Form 3 CA Certificate Q2.pdf | 14 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold inventory Q2.pdf | 14 Oct 2025 |
| Form 1File: Architect Certificate--Q1.pdf | 14 Oct 2025 |
| Form 2File: Engineer certificate.pdf | 14 Oct 2025 |
| Form 3File: Q1 FY 25-26 FORM 3..pdf | 14 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf | 14 Oct 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 FY 24-25 FORM 3 Chartered Accountant Certificate Shriyans FINAL.pdf | 12 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate form 2 Q4.pdf | 12 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate 1.pdf | 30 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate form 2 Q4.pdf | 30 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 24 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 20 Jan 2025 |
| Layout approvalFile: 1.pdf | 14 Jun 2024 |
| Building plan approvalFile: 2.pdf | 14 Jun 2024 |
| Building plan approvalFile: 3.pdf | 14 Jun 2024 |
| Building plan approvalFile: 4.pdf | 14 Jun 2024 |
| Building plan approvalFile: 5.pdf | 14 Jun 2024 |
| Building plan approvalFile: 6.pdf | 14 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: 1.pdf | 14 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2.pdf | 14 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 3.pdf | 14 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4.pdf | 14 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 5.pdf | 14 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 6.pdf | 14 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Com.pdf | 14 Jun 2024 |
| Declaration about Commencement CertificateFile: FORM - D.pdf | 14 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Shriyans.pdf | 13 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - 3.pdf | 12 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: Financial Encumburance Shriyans.pdf | 30 May 2024 |
| Details of encumbrances concerned to LegalFile: Financial Encumburance Shriyans.pdf | 30 May 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrances Index 2.pdf | 21 May 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrances Index 2.pdf | 21 May 2024 |
| Disclosure of sold/ booked inventoryFile: RERA Inventory Certificate - March-24.pdf | 21 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Chartered Accountant Certificate Shriyans FINAL.pdf | 11 Nov 2023 |
| Layout approvalFile: IMG_0079.pdf | 10 Nov 2023 |
| Copy of the legal title reportFile: Format A Final Upload.pdf | 10 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: IMG_0079.pdf | 10 Nov 2023 |
| Declaration about Commencement CertificateFile: Format D.pdf | 10 Nov 2023 |
| Declaration about Commencement CertificateFile: Format D.pdf | 10 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure of Interest in Entities Amol Shelke.pdf | 10 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure of Interest in Entities Nikhil Kadam.pdf | 10 Nov 2023 |
| Proforma of Agreement for saleFile: New AFS Shriyans.pdf | 10 Nov 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation of Agreement for sale.pdf | 10 Nov 2023 |
| Building plan approvalFile: IMG_0080.pdf | 7 Nov 2023 |
| Building plan approvalFile: IMG_0081.pdf | 7 Nov 2023 |
| Building plan approvalFile: IMG_0082.pdf | 7 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: Encumburance Finance.pdf | 7 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: Encumburance Legal.pdf | 7 Nov 2023 |
| Details of encumbrances concerned to LegalFile: Encumburance Finance.pdf | 7 Nov 2023 |
| Details of encumbrances concerned to LegalFile: Encumburance Legal.pdf | 7 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IMG_0080.pdf | 7 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IMG_0081.pdf | 7 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IMG_0082.pdf | 7 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: S041000226_2311071155000.pdf | 7 Nov 2023 |
| CERSAI detailsFile: Undertaking CERSAI.pdf | 7 Nov 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank account Letter.pdf | 27 Oct 2023 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 26 Sep 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report Allotement letter.pdf | 26 Sep 2023 |
| Declaration in FORM BFile: SOBD AFFIDAVIT.pdf | 16 Sep 2023 |
| PAN CardFile: 1 PAN Card.pdf | 8 Sep 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SILVEROAK GREEN VIEW PH - 1 | SR NO 51 | 75 | Completed | Jun 2011 | Jun 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 76 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Shriyans 3.0 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Punawale13,700+ in Pune
Filed coordinates, straight-line distance. 227 registered projects within 2 km.
Construction of 24 LIG, 768 MIG and commercial
Pune Housing & Area Development Board
Kohinoor Avantara
Intofinity Promoters Private Limited
AISHWARYAM INSIGNIA
VIKSAK VINODE INFRATECH LLP
KOHINOOR UPTOWN AVENUE
MOONSTONE REALINFRA PRIVATE LIMITED
LUSH RESIDENCES
LUSH RESIDENCES LLP
RENUKA PANCHATATTVA
Renuka Realty Private Limited
Builder: SILVER OAK BUILDERS AND DEVELOPERS
SILVER OAK BUILDERS AND DEVELOPERS has 2 registrations on MahaRERA, including SILVEROAK GOLD COAST and Shriyans 3.0. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Shriyans 3.0 is delayed beyond 31 Oct 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shriyans 3.0?
The registered promoter entity is SILVER OAK BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shriyans 3.0?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shriyans 3.0?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shriyans 3.0?
The professionals named in the filing: Architect: Ar Sachin Sutar; Engineer: Satish Abasaheb Gagare; Chartered Accountant: Phule Wagh & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shriyans 3.0?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback