Home / Browse projects / Mumbai Suburban, Maharashtra / SHRISTI RESIDENCY - PHASE 1

Completed No litigation declared Others project

SHRISTI RESIDENCY - PHASE 1

By RANBIR REAL ESTATE AND DEVELOPERS LLP

RG-MH-30659 · RERA P51800031167 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • 37 complaints at MahaRERA
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
27 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 0%
51 of 221Units unsoldnot recorded sold or booked
37Complaints at MahaRERAon this registration
Jump to the 270 documents Report an error

SHRISTI RESIDENCY - PHASE 1 is a Others project by RANBIR REAL ESTATE AND DEVELOPERS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800031167 on 11 Oct 2021. The registration is recorded completed; possession was promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 170 of the 221 units on this registration are recorded sold or booked, and 27 of 33 construction stages are filed complete. 37 complaints are on record with the regulator.

At a glance

Project

  • NameSHRISTI RESIDENCY - PHASE 1
  • TypeOthers
  • Location
    • C.T.S No. 156 (part)
    • 160/A/1 (part) and 162 (part) of Village Majas situate
    • lying and being at Meghwadi
    • Sarvoday Nagar Road
    • Jogeshwari (East)
    • ...
  • Pincode400060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800031167
  • ReraGenie IDRG-MH-30659

Builder

  • NameRANBIR REAL ESTATE AND DEVELOPERS LLP
  • Entity typePartnership
  • PartnersJAIKUMAR GAJANAND GUPTA, SUYASHH JAIKUMAR GUPTA

Key dates

this monthRegisteredOct 2021First promiseDec 2024Revised toDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Oct 2021
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2024)
  • Buildings3 building records
  • Documents filed270 files

Current status

77%170 of 221 units booked
108.6%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHRISTI RESIDENCY - WING ANA191970676
SHRISTI RESIDENCY - WING BNA19071071
SHRISTI RESIDENCY - WING CNA19074074

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 0%.

SHRISTI RESIDENCY - WING A82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SHRISTI RESIDENCY - WING B82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SHRISTI RESIDENCY - WING C82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes5%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes95%
Solid Waste Management And DisposalYes95%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes99%

Parking filed105

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots105
Closed/Covered105
BuildingClosed/CoveredTotal
SHRISTI RESIDENCY - WING A4343
SHRISTI RESIDENCY - WING B3030
SHRISTI RESIDENCY - WING C3232

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,009 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Nov 2025
LandownerVillageDistrict
ADITI CONSTRUCTIONSAndheriMumbai Suburban

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI12967.64
Proposed, not sanctioned12,968 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAHURA CENTRE GROUND FLOOR MAHAKALI CAVES ROAD ANDHERI EAST MUMBAI - 400093
Estimated costRs 63.85 cr
Cost incurredRs 69.32 cr
Work done108.56%
BuildingWingEstimatedIncurred
SHRISTI RESIDENCY - WING ANARs 22.21 crRs 24.20 cr
SHRISTI RESIDENCY - WING CNARs 19.85 crRs 21.64 cr
SHRISTI RESIDENCY - WING BNARs 18.79 crRs 20.49 cr
-NARs 3.00 crRs 2.98 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS. S. Associates.
EngineerACE Project Management Consultant
Chartered AccountantH P GALA & ASSOCIATES
Chartered AccountantBATLIBOI AND PUROHIT CHARTERED ACCOUNTANTS
Chartered AccountantJAGDISH BANSAL & ASSOCIATES
PartnerRole in project
RANBIR REAL ESTATE AND DEVELOPERS LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800025256Dec 2024 → Dec 2025

Reason as filed by the promoterUNFORESEEN CIRCUMSTANCES THE PROJECT WAS NOT ABLE TO GET COMPLETED IN TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENTION TILL 31ST DECEMBER 2025.

EA28112518461Dec 2024 → Dec 2026

Reason as filed by the promoterThe project was delayed due to an unavoidable reason that was beyond our control. Maily the road work process and other work was hampered. We requested the extension as per order 40 and got the extension order from Maharera. We have now submitted the order and requesting to grant us the extension as per order 40. Date of extension requested 31.12.2026

Complaints filed with MahaRERA37

Case no.ComplainantRespondentFiled
CC12600916AMITA HIRIYANNA NAYAKRANBIR REAL ESTATE AND DEVELOPERS LLP19/02/2026
CC12600001Karandeep Singh SethiRANBIR REAL ESTATE AND DEVELOPERS LLP01/01/2026
CC12504616Jaya Sunil ApteRANBIR REAL ESTATE AND DEVELOPERS LLP24/12/2025
CC12600007Sneha DevadigaRANBIR REAL ESTATE AND DEVELOPERS LLP01/01/2026
CC12600027SARITA NAVIN DSOUZARANBIR REAL ESTATE AND DEVELOPERS LLP02/01/2026
CC12600135Karuna Kailas PanchalRANBIR REAL ESTATE AND DEVELOPERS LLP08/01/2026
CC12600147Deepika Pradeep PathakRANBIR REAL ESTATE AND DEVELOPERS LLP09/01/2026
CC12600304Rohan Jagannath RautRANBIR REAL ESTATE AND DEVELOPERS LLP16/01/2026
CC12600760Saurabh Shaileshkumar SalunkheRANBIR REAL ESTATE AND DEVELOPERS LLP10/02/2026
CC12600400Pamela Peter CardozRANBIR REAL ESTATE AND DEVELOPERS LLP21/01/2026
CC12600419Jaspreetsingh H ChandhokRANBIR REAL ESTATE AND DEVELOPERS LLP22/01/2026
CC12600468SACHIN NANDKUMAR NAIKRANBIR REAL ESTATE AND DEVELOPERS LLP26/01/2026
CC12600669Anuja Mahesh RahatwalRANBIR REAL ESTATE AND DEVELOPERS LLP05/02/2026
CC12600757Henry Jerome DsouzaRANBIR REAL ESTATE AND DEVELOPERS LLP10/02/2026
CC12600737Santosh Dhondu PawarRANBIR REAL ESTATE AND DEVELOPERS LLP09/02/2026
CC12600751Swati Subodh BagweRANBIR REAL ESTATE AND DEVELOPERS LLP09/02/2026
CC12600773Dashrath Vasudev BagweRANBIR REAL ESTATE AND DEVELOPERS LLP10/02/2026
CC12600996Vinayak Sahadeo HaryanRANBIR REAL ESTATE AND DEVELOPERS LLP24/02/2026
CC12600870Anjali Mohanlal JainRANBIR REAL ESTATE AND DEVELOPERS LLP16/02/2026
CC12600876Bruna Maria DsouzaRANBIR REAL ESTATE AND DEVELOPERS LLP17/02/2026
CC12600901Bautis Peter FernandesRANBIR REAL ESTATE AND DEVELOPERS LLP19/02/2026
CC12600928Akshata Anil RedekarRANBIR REAL ESTATE AND DEVELOPERS LLP19/02/2026
CC12600931Rajesh Dilip LabdeRANBIR REAL ESTATE AND DEVELOPERS LLP19/02/2026
CC12600946Shailesh Dilip LabdeRANBIR REAL ESTATE AND DEVELOPERS LLP20/02/2026
CC12600959Prashant Sudam AhireRANBIR REAL ESTATE AND DEVELOPERS LLP21/02/2026
CC12601127Shivani Bhikaji GhagRANBIR REAL ESTATE AND DEVELOPERS LLP02/03/2026
CC12601256PREMANAND PANDHARINATH MESTRYRANBIR REAL ESTATE AND DEVELOPERS LLP08/03/2026
CC12601351VISHAL PRADEEP TAMBERANBIR REAL ESTATE AND DEVELOPERS LLP12/03/2026
CC12601297Vimal Dinesh DodhiaRANBIR REAL ESTATE AND DEVELOPERS LLP10/03/2026
CC12601356Maruti Bhau JangamRANBIR REAL ESTATE AND DEVELOPERS LLP12/03/2026
CC12601446Sonali Amit ShikhareRANBIR REAL ESTATE AND DEVELOPERS LLP15/03/2026
CC12601489Manoj Shrikant MahajanRANBIR REAL ESTATE AND DEVELOPERS LLP17/03/2026
CC12601491Prashant Prabhakar BridRANBIR REAL ESTATE AND DEVELOPERS LLP18/03/2026
CC12602381Shantaram Laxman ShindeRANBIR REAL ESTATE AND DEVELOPERS LLP22/04/2026
CC12603141Amol Dashrath ShelarRANBIR REAL ESTATE AND DEVELOPERS LLP26/05/2026
CC12604006Kishorkumar Chandraprakash DuratkarRANBIR REAL ESTATE AND DEVELOPERS LLP27/06/2026
CC12604011Ponsil Kanakraj NadarRANBIR REAL ESTATE AND DEVELOPERS LLP27/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed270

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 270 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Mail from SRA (Verification of OC).pdf29 Jun 2026
Form 2A (FY 2025-2026)File: Shristi Residency Form 2A_FY 2025-26.pdf17 Jun 2026
Form 5 (FY 2024-2025)File: Shristi Residency_Phase-1 Form 5_FY 2024-25.pdf17 Jun 2026
Form 5 (FY 2025-2026)File: Shristi Residency_Phase-1 Form 5_FY 2025-26.pdf17 Jun 2026
Withdrawal Update Form 1File: From 1 ARCHITECT CERTIFICATE 31 Mar 2026.pdf2 Jun 2026
Withdrawal Update Form 2File: Form 2 Engineers Certificate 15 May 2026.pdf2 Jun 2026
Withdrawal Update Form 3File: Form 3 C A Certificate 28 May 2026.pdf2 Jun 2026
Occupational CertificateFile: OCC LETTER 15 May 2026.pdf2 Jun 2026
Withdrawal Update Form 1File: FORM 1 - 31-12-2025.pdf11 Feb 2026
Withdrawal Update Form 2File: FORM 2 - 31-12-2025.pdf11 Feb 2026
Withdrawal Update Form 3File: FORM 3 - 31-12-2025.pdf11 Feb 2026
Withdrawal Update Form 1File: FORM 1 -30-09-2025.pdf28 Nov 2025
Withdrawal Update Form 1File: FORM 1 -30-09-2025.pdf28 Nov 2025
Withdrawal Update Form 2File: FORM 2 - 30-09-2025.pdf28 Nov 2025
Withdrawal Update Form 2File: FORM 2 - 30-09-2025.pdf28 Nov 2025
Withdrawal Update Form 3File: FORM 3 30-09-2025.pdf28 Nov 2025
Withdrawal Update Form 3File: FORM 3 30-09-2025.pdf28 Nov 2025
Form 2A (FY 2023-2024)File: New Form 2A (23-24).pdf17 Sep 2025
Form 2A (FY 2024-2025)File: New Form 2A (24-25).pdf17 Sep 2025
Form 5 (FY 2022-2023)File: FORM 5 - 2022-23.pdf8 Sep 2025
Form 1File: ARCHITECT CERTIFICATE.pdf1 Sep 2025
Form 2File: Engineers Certificate.pdf1 Sep 2025
Form 3File: C A Certificate.pdf1 Sep 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND UNSOLD INVENTORY.pdf1 Sep 2025
Form 1File: FORM 1- 31-03-2025.pdf29 Aug 2025
Form 2File: FORM 2 - 31-03-2025.pdf29 Aug 2025
Form 3File: FORM 3 - 31-03-2025.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY - 31-03-2025.pdf29 Aug 2025
Form 5 (FY 2023-2024)File: FORM 5 - 2023-24.pdf29 Aug 2025
Form 5 (FY 2021-2022)File: FORM 5 - 2021-22.pdf29 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE (6).pdf8 May 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf7 May 2025
Declaration about Commencement CertificateFile: DCC.pdf7 May 2025
Declaration in FORM BFile: Shristi Residency Form B - Feb 25.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf22 Jan 2025
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf29 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf29 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOUSER OF SOLD AND UNSOLD INVENTORY.pdf29 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOUSER OF SOLD AND UNSOLD INVENTORY.pdf29 Nov 2024
Declaration about Commencement CertificateFile: Declaration of Commencement Certificate.pdf29 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annx A(Manoj Kumar Ruia).pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf21 Oct 2024
Declaration about Commencement CertificateFile: Declaration of C C.pdf21 Oct 2024
Building plan approvalFile: Ranbir Real Estate-SRA Revised IOA Dated 24-06-2024.pdf20 Jul 2024
Building plan approvalFile: Ranbir Real Estate-SRA Revised LOI Dated 21-06-2024.pdf20 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Ranbir Real Estate-SRA Revised IOA Dated 24-06-2024.pdf20 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Ranbir Real Estate-SRA Revised LOI Dated 21-06-2024.pdf20 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Ranbir Real Estate-SRA Revised CC Dated 25-06-2024.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf5 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf5 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf5 Jun 2024
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FORM 3.pdf5 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ranbir - ca certificate.pdf12 Feb 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC.pdf10 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTURE CERTIFICATE.pdf10 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf10 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf10 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A OF ALL PARTNERS.pdf10 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: REVISED CA CERTIFICATE.pdf1 Nov 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT C C 30_10_2023.pdf31 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 30_10_2023.pdf31 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE 30_10_2023.pdf31 Oct 2023
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY 30_10_2023.pdf31 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Shristi Residency QA.pdf21 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Shristi Residency FORM 5.pdf21 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA NEW.pdf17 Aug 2023
Declaration about Commencement CertificateFile: Shristi Residency DCC.pdf16 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf16 Aug 2023

How this compares with Mumbai Suburban

77%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHRISTI RESIDENCY - PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JOGESHWARI EAST6,700+ in Mumbai Suburban

2 kmSHRISTI RESIDENCY - PHASCompleted 77Lapsed / revoked 47Other 85Dot size: filed unitsN

Filed coordinates, straight-line distance. 209 registered projects within 2 km.

Builder: RANBIR REAL ESTATE AND DEVELOPERS LLP

RANBIR REAL ESTATE AND DEVELOPERS LLP has 1 registration on MahaRERA, including SHRISTI RESIDENCY - PHASE 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SHRISTI RESIDENCY - PHASE 1 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRISTI RESIDENCY - PHASE 1?

The registered promoter entity is RANBIR REAL ESTATE AND DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRISTI RESIDENCY - PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHRISTI RESIDENCY - PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SHRISTI RESIDENCY - PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRISTI RESIDENCY - PHASE 1?

The professionals named in the filing: Architect: S. S. Associates.; Engineer: ACE Project Management Consultant; Chartered Accountant: H P GALA & ASSOCIATES; Chartered Accountant: BATLIBOI AND PUROHIT CHARTERED ACCOUNTANTS; Chartered Accountant: JAGDISH BANSAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRISTI RESIDENCY - PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRISTI RESIDENCY - PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRISTI RESIDENCY - PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.