Home / Browse projects / Aurangabad, Maharashtra / SHRINIVAS PARK

Registered No litigation declared Residential / Group Housing project

SHRINIVAS PARK

By SHRINIVAS BUILDERS AND DEVELOPERS

RG-MH-84521 · RERA P51500055945 · Last updated on MahaRERA portal: 18 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
9 of 99Construction stages doneacross 9 buildings; furthest along: Basement (if any), 75%
62 of 76Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

SHRINIVAS PARK is a Residential / Group Housing project by SHRINIVAS BUILDERS AND DEVELOPERS in Aurangabad, Maharashtra, registered with MahaRERA as P51500055945 on 2 May 2024. Possession is promised by 31 Dec 2028. 14 of the 76 units on this registration are recorded sold or booked, and 9 of 99 construction stages are filed complete.

At a glance

Project

  • NameSHRINIVAS PARK
  • TypeResidential / Group Housing
  • Location
    • POKHARI
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431115
  • Pincode431115
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500055945
  • ReraGenie IDRG-MH-84521

Builder

  • NameSHRINIVAS BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • Authorised PartnersChandrakant Ambadas Karpe, Ganesh Mainaji Rathod, Pandit Sandu Gunjal
  • PartnersDeepak Devidas Doifode, Pandharinath Sonaji Gadekar, Udaykumar Laxmanrao Ghuge, Yuvraj Tukaram Bari

Key dates

this monthRegisteredMay 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 May 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings9 building records
  • Documents filed96 files

Current status

18%14 of 76 units booked
16.2%Work done, per cost certificate

Figures as on 18 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
F TYPE BUILDINGNA11909
G TYPE BUILDINGNA1112012
H TYPE BUILDINGNA11808
I TYPE BUILDINGNA11404
A TYPE BUILDINGNA11707
B TYPE BUILDINGNA11909
C TYPE BUILDINGNA1110010
D TYPE BUILDINGNA1110010
E TYPE BUILDINGNA11707

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 18 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Basement (if any), at 75%.

F TYPE BUILDING24%
ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)0%
Plinth50%
Stilt Floor25%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
G TYPE BUILDING24%
ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)0%
Plinth50%
Stilt Floor25%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
H TYPE BUILDING24%
ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)0%
Plinth50%
Stilt Floor25%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
I TYPE BUILDING24%
ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)0%
Plinth50%
Stilt Floor25%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A TYPE BUILDING24%
ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)0%
Plinth50%
Stilt Floor25%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B TYPE BUILDING24%
ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)0%
Plinth50%
Stilt Floor25%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C TYPE BUILDING24%
ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)0%
Plinth50%
Stilt Floor25%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D TYPE BUILDING24%
ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)0%
Plinth50%
Stilt Floor25%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E TYPE BUILDING24%
ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)0%
Plinth50%
Stilt Floor25%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed73

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots73
Open Space73
BuildingOpen SpaceTotal
F TYPE BUILDING99
G TYPE BUILDING1212
H TYPE BUILDING77
I TYPE BUILDING22
A TYPE BUILDING88
B TYPE BUILDING99
C TYPE BUILDING88
D TYPE BUILDING1010
E TYPE BUILDING88

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,336 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
GOVIND SHANKAR TUPEAurangabad (M Corp.)Aurangabad

Approvals and building plan

Sanctioning authorityChhatrapati Sambhajinagar Metropolitan Regional Development Authority
Permissible FSI13158.56
Proposed, not sanctioned5,823 sq m
Buildings approved9
Buildings sanctioned9

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMATOSHRI N 9 J 1 PLOT NO 10 TV CENTRE ROAD HUDCO AURANGABAD
Estimated costRs 9.96 cr
Cost incurredRs 1.61 cr
Work done16.2%
BuildingWingEstimatedIncurred
-NARs 2.49 crRs 20.80 lakh
G TYPE BUILDINGNARs 1.16 crRs 21.84 lakh
C TYPE BUILDINGNARs 96.43 lakhRs 18.14 lakh
D TYPE BUILDINGNARs 95.21 lakhRs 17.91 lakh
A TYPE BUILDINGNARs 90.34 lakhRs 17.00 lakh
F TYPE BUILDINGNARs 87.55 lakhRs 16.47 lakh
B TYPE BUILDINGNARs 82.30 lakhRs 15.49 lakh
H TYPE BUILDINGNARs 79.70 lakhRs 15.00 lakh
E TYPE BUILDINGNARs 74.50 lakhRs 14.02 lakh
I TYPE BUILDINGNARs 24.61 lakhRs 4.63 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHANNAJAY DOIFODE DOIFODE
EngineerDHNANJAY DOIFODE
EngineerParmeshwar Gavali
Chartered AccountantSUDARSHAN KARWA & CO
Chartered AccountantSNGP & Company
PartnerRole in project
SHRINIVAS BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 2025-26 Q2.pdf18 May 2026
Withdrawal Update Form 1File: Form 1 2025-26 Q2.pdf18 May 2026
Withdrawal Update Form 1File: Form 1 2024-25 Q3.pdf18 May 2026
Withdrawal Update Form 1File: Form 1 2025-26 Q4.pdf18 May 2026
Withdrawal Update Form 2File: Form 2 2025-26 Q2.pdf18 May 2026
Withdrawal Update Form 2File: Form 2 2025-26 Q2.pdf18 May 2026
Withdrawal Update Form 2File: Form 2 2024-25 Q3.pdf18 May 2026
Withdrawal Update Form 2File: Form 3 2025-26 Q4.pdf18 May 2026
Withdrawal Update Form 3File: Form 3 2025-26 Q2.pdf18 May 2026
Withdrawal Update Form 3File: Form 3 2025-26 Q2.pdf18 May 2026
Withdrawal Update Form 3File: Form 3 2024-25 Q3.pdf18 May 2026
Withdrawal Update Form 3File: Form 3 2025-26 Q4.pdf18 May 2026
Form 1File: Form 1-2024-25-Q1.pdf14 Aug 2025
Form 2File: Form 2-2024-25-Q1.pdf14 Aug 2025
Form 3File: Form 3-2024-25-Q1.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold-2024-25-Q1.pdf14 Aug 2025
Form 1File: Form 1-2024-25-Q2.pdf14 Aug 2025
Form 2File: Form 2-2024-25-Q2.pdf14 Aug 2025
Form 3File: Signed Form 3.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-2024-25-Q2.pdf14 Aug 2025
Form 1File: Form 1-2024-25-Q3.pdf14 Aug 2025
Form 2File: Form 2-2024-25-Q3.pdf14 Aug 2025
Form 3File: Form 3-2024-25-Q3.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: 3 Disclosure of sold-2024-25-Q3.pdf14 Aug 2025
Withdrawal Update Form 1File: Form 1 2025-26 Q1.pdf14 Aug 2025
Withdrawal Update Form 2File: Form 2 2025-26 Q1.pdf14 Aug 2025
Withdrawal Update Form 3File: Form 3 2025-26 Q1.pdf14 Aug 2025
Withdrawal Update Form 1File: Form 1 2025-26 Q1.pdf4 Aug 2025
Withdrawal Update Form 1File: Form 1 2025-26 Q1.pdf4 Aug 2025
Withdrawal Update Form 1File: Form 1 2025-26 Q1.pdf4 Aug 2025
Withdrawal Update Form 2File: Form 2 2025-26 Q1.pdf4 Aug 2025
Withdrawal Update Form 2File: Form 2 2025-26 Q1.pdf4 Aug 2025
Withdrawal Update Form 2File: Form 2 2025-26 Q1.pdf4 Aug 2025
Withdrawal Update Form 3File: Form 3 2025-26 Q1.pdf4 Aug 2025
Withdrawal Update Form 3File: Form 3 2025-26 Q1.pdf4 Aug 2025
Withdrawal Update Form 3File: Form 3 2025-26 Q1.pdf4 Aug 2025
Form 1File: Form 1 2024-25 Q4.pdf26 May 2025
Form 2File: Form 2 2024-25 Q4.pdf26 May 2025
Form 3File: Form 3 2024-25 Q4 Sign.pdf26 May 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 2024-25 Q4.pdf26 May 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf25 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q3.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2024-25 Q3_.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q3.pdf25 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 2024-25 Q3.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed Form 1 Q1.pdf19 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed Form 1 Q2.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Form 2 Q1.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Form 2 Q2.pdf19 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Q1.pdf19 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Q2.pdf19 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest all Partners.pdf19 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of secured unsecured finance.pdf19 Dec 2024
Layout approvalFile: 1 LAYOUT.pdf19 Mar 2024
Building plan approvalFile: 2 A-BUILDING.pdf19 Mar 2024
Building plan approvalFile: 3 B-BUILDING.pdf19 Mar 2024
Building plan approvalFile: 4 C-BUILDING.pdf19 Mar 2024
Building plan approvalFile: 5 D-BUILDING.pdf19 Mar 2024
Building plan approvalFile: 6 E-BUILDING.pdf19 Mar 2024
Building plan approvalFile: 7 F-BUILDING.pdf19 Mar 2024
Building plan approvalFile: 8 G-BUILDING.pdf19 Mar 2024
Building plan approvalFile: 9 H-BUILDING.pdf19 Mar 2024
Building plan approvalFile: 10 I-BUILDING.pdf19 Mar 2024
Copy of Layout Approval (in case of layout)File: 1 LAYOUT.pdf19 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 A-BUILDING.pdf19 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 3 B-BUILDING.pdf19 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 4 C-BUILDING.pdf19 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 D-BUILDING.pdf19 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 E-BUILDING.pdf19 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 7 F-BUILDING.pdf19 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 8 G-BUILDING.pdf19 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 9 H-BUILDING.pdf19 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 10 I-BUILDING.pdf19 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shrinivas Park Form-3 18-Mar-24.pdf19 Mar 2024
PAN CardFile: Shrinivas PAN Card.pdf18 Mar 2024
Copy of the legal title reportFile: Shrinivas Search Report.pdf18 Mar 2024
Details of encumbrances concerned to FinanceFile: NO ENC FIN.pdf14 Mar 2024

How this compares with Aurangabad

18%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep SHRINIVAS PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near POKHARI1,400+ in Aurangabad

2 kmSHRINIVAS PARKCompleted 1Lapsed / revoked 1Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 12 registered projects within 2 km.

Builder: SHRINIVAS BUILDERS AND DEVELOPERS

SHRINIVAS BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including SHRINIVAS PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if SHRINIVAS PARK is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRINIVAS PARK?

The registered promoter entity is SHRINIVAS BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRINIVAS PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHRINIVAS PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRINIVAS PARK?

The professionals named in the filing: Architect: DHANNAJAY DOIFODE DOIFODE; Engineer: DHNANJAY DOIFODE; Engineer: Parmeshwar Gavali; Chartered Accountant: SUDARSHAN KARWA & CO; Chartered Accountant: SNGP & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRINIVAS PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRINIVAS PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRINIVAS PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.