ReraGenieLog inGet a buyer report

Home / Browse projects / Ratnagiri, Maharashtra / SHRI SWAMI SAMARTH MAULI

Completed No litigation declared Residential / Group Housing project

SHRI SWAMI SAMARTH MAULI

By SHREE SWAMI SAMARTH ENTERPRISES

RG-MH-12082 · RERA P52800002926 · Last updated on MahaRERA portal: 29 Oct 2021

Source: official MahaRERA filing

Red flags

  • Completion date moved by 39 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Jun 2022Possession promisedregistration recorded completed
1 of 11Construction stages donefurthest along: Basement (if any), 50%
0Complaints at MahaRERAon this registration
Jump to the 31 documents Report an error

SHRI SWAMI SAMARTH MAULI is a Residential / Group Housing project by SHREE SWAMI SAMARTH ENTERPRISES in Ratnagiri, Maharashtra, registered with MahaRERA as P52800002926 on 4 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2022. The completion date has moved by 39 months from the original filing.

At a glance

Project

  • NameSHRI SWAMI SAMARTH MAULI
  • TypeResidential / Group Housing
  • Location
    • Karvanchiwadi
    • Ratnagiri
    • 415612
  • Pincode415612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800002926
  • ReraGenie IDRG-MH-12082

Builder

  • NameSHREE SWAMI SAMARTH ENTERPRISES
  • Entity typePartnership
  • Other registrations6 more →
  • Completed2 of 7
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseMar 2019Revised toJun 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Aug 2017
  • Promised completion30 Jun 2022
  • Revised completionRevised to 30 Jun 2022 (originally 31 Mar 2019)
  • Buildings1 building record
  • Documents filed31 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHRI SWAMI SAMARTH MAULINA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Oct 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 50%.

SHRI SWAMI SAMARTH MAULI: 18% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Oct 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area450 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI540.0
Proposed, not sanctioned540 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHARAD KUNJ OPP GADKARI RANGAYATAN TALAOPALI THANE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShirish Ghorpade
EngineerSandeep S Shetye
Chartered AccountantTilakchandra Shirsat
PartnerRole in project
SHREE SWAMI SAMARTH ENTERPRISES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52800011009Mar 2019 → Dec 2021

Reason as filed by the promoterDUE TO COVID-19 PANDEMACI THE PROJECT GOT DELAYED

EXT52800002514Mar 2019 → Mar 2020

Reason as filed by the promoterMATERIAL & LABOUR SHORTAGE & INADEQUATE SITE CONDITON

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Feb 2021

Documents filed31

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 2017-18-compressed.pdf29 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-19_11zon.pdf29 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-20_11zon.pdf29 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21_11zon.pdf29 Oct 2021
Status of ConveyanceFile: Index 2.pdf20 Oct 2021
Status of ConveyanceFile: Conveynce deed samarth mauli-compressed-compressed.pdf20 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: page1 2019-20-converted.pdf9 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: page 1 2020-21-converted.pdf9 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Rera_Certificate.pdf9 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Rera_Certificate.pdf9 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Rera_Certificate.pdf9 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Rera_Certificate.pdf9 Sep 2021
Declaration about Commencement CertificateFile: DECLARATION OF COMMENCEMENT CERTIFICATE (2).pdf7 Sep 2021
Declaration about Commencement CertificateFile: DECLARATION OF COMMENCEMENT CERTIFICATE (2).pdf7 Sep 2021
Disclosure of sold/ booked inventoryFile: DISCLOSER OF BOOKED AND SOLD INVENTORIES.pdf7 Sep 2021
Architect’s Certificate on Completion of Project (Form 4)File: DocScan_09_06_2021(1).pdf7 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: NA order commencement certificate-744.pdf5 Sep 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: imgtopdf_0509212032025.pdf5 Sep 2021
PAN CardFile: Ssse pancard rera upload.pdf4 Sep 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: samarth mauli OC.pdf23 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECHT CERTIFICATE SSSE.pdf30 Jul 2017
Certificates of CA (Form 3)File: ssse ca certificate-Reduced.pdf29 Jul 2017
Building plan approvalFile: Na order.pdf20 Jul 2017
Layout approvalFile: approved plan.pdf20 Jul 2017
Copy of the legal title reportFile: samartha_Mauli_title_report.pdf20 Jul 2017
Details of encumbrancesFile: encumbrances.pdf20 Jul 2017
Copy of Layout Approval (in case of layout)File: approved plan.pdf20 Jul 2017
Building Plan Approval (IOD)File: Na order.pdf20 Jul 2017
Declaration in FORM BFile: form b.pdf20 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf20 Jul 2017
Proforma of Allotment letterFile: allotment and draft sale.pdf20 Jul 2017

How this compares with Ratnagiri

15%of Ratnagiri projects moved their completion datethis one moved by 39 months
30%of Ratnagiri registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep SHRI SWAMI SAMARTH MAULI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Karvanchiwadi1,100+ in Ratnagiri

2 kmSHRI SWAMI SAMARTH MAULICompleted 9Lapsed / revoked 4Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: SHREE SWAMI SAMARTH ENTERPRISES

SHREE SWAMI SAMARTH ENTERPRISES has 7 registrations on MahaRERA, including SHRI SWAMI SAMARTH MAULI and SWASTIK AANGAN. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if SHRI SWAMI SAMARTH MAULI is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRI SWAMI SAMARTH MAULI?

The registered promoter entity is SHREE SWAMI SAMARTH ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRI SWAMI SAMARTH MAULI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHRI SWAMI SAMARTH MAULI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRI SWAMI SAMARTH MAULI?

The professionals named in the filing: Architect: Shirish Ghorpade; Engineer: Sandeep S Shetye; Chartered Accountant: Tilakchandra Shirsat. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRI SWAMI SAMARTH MAULI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRI SWAMI SAMARTH MAULI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRI SWAMI SAMARTH MAULI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.