ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Shri Jay-Sukh Co-Op. Hsg. Soc. Ltd.

Completed No litigation declared Residential / Group Housing project

Shri Jay-Sukh Co-Op. Hsg. Soc. Ltd.

By Saisiddhi Builders and Developers

RG-MH-29934 · RERA P51800029448 · Last updated on MahaRERA portal: 11 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

Shri Jay-Sukh Co-Op. Hsg. Soc. Ltd. is a Residential / Group Housing project by Saisiddhi Builders and Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800029448 on 29 May 2021. The registration is recorded completed; possession was promised by 31 Dec 2025.

At a glance

Project

  • NameShri Jay-Sukh Co-Op. Hsg. Soc. Ltd.
  • TypeResidential / Group Housing
  • Location
    • Liberty Garden Road No.3
    • Malad - West
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • RERA no.P51800029448
  • ReraGenie IDRG-MH-29934

Builder

  • NameSaisiddhi Builders and Developers
  • Entity typePartnership
  • PartnersNilesh Laxman Gadekar, Haresh Shantilal Patel

Key dates

this monthRegisteredMay 2021PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 May 2021
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed59 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shri Jay-Sukh Co-Op Hsg Soc LtdNA220000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Shri Jay-Sukh Co-Op Hsg Soc Ltd: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes-

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered28
Open Space2

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area625 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Shri Jay-Sukh Co-Op. Hsg. Soc. Ltd.BorivaliMumbai Suburban

Approvals and building plan

Permissible FSI1849.25
Proposed, not sanctioned766 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchYoginagar, Borivali-West, Mumbai - 400092

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKirti Shah
ArchitectVinayak Despande
EngineerNaresndra Desai
Chartered AccountantS B Rawal Associates
PartnerRole in project
Saisiddhi Builders and Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 May 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Jan 2025

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 2223.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 2324.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 Q2 2324.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY FY 2022-2023 -Q4.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY FY 2023-2024 -Q2.pdf11 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 22-23.pdf11 Feb 2025
Layout approvalFile: Drawing signed for Full FSI-pages-1NEW.PDF10 Feb 2025
Layout approvalFile: Drawing signed for Full FSI-pages-2NEW.PDF10 Feb 2025
Layout approvalFile: Drawing signed for Full FSI-pages-3NEW.PDF10 Feb 2025
Building plan approvalFile: Amendletter_signed for Full FSI.pdf10 Feb 2025
Copy of Layout Approval (in case of layout)File: Drawing signed for Full FSI-pages-2NEW.PDF10 Feb 2025
Copy of Layout Approval (in case of layout)File: Drawing signed for Full FSI-pages-3NEW.PDF10 Feb 2025
Copy of Layout Approval (in case of layout)File: Drawing signed for Full FSI-pages-1NEW.PDF10 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Shri Jay Sukh.pdf10 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Amendletter_signed for Full FSI.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 21-22.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 22-23.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shri Jay_Sukh Q1 23-24.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shri_Jay_Sukh Q2 23-24.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Q1 22-23.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Q2 23-24.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Q1 23-24.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Q4 22-23.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Q2 22-23.pdf5 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A FY 2022-2023.pdf5 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC.pdf28 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory Display in MahaRERA Website.pdf26 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Shri Jay Sukh-8-2-2022.pdf23 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_Shri_Jay_Sukh 1Jun 22.pdf23 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_Shri_Jay_Sukh Q2-2223.pdf23 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE.pdf23 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA CERTIFICATE ENGINEER 8-2-2022.pdf23 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers Certificate-Quarterly.pdf23 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE FORM 2.pdf23 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE FORM 2.pdf23 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: oct 22 to dec-22 Form 3 CA-Quarterly (2).pdf23 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA-Q2 -2223.pdf21 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Quality Engineers Annual FY 2122.pdf1 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA-Quarterly8-2-22.pdf1 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf1 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf1 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: FurtherCC_signed upto 19th floor.pdf12 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: FurtherCC_signed.pdf20 Jan 2022
Building plan approvalFile: Amendletter_signed.pdf12 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: Amendletter_signed.pdf12 Aug 2021
Proforma of Allotment letterFile: Allotment_Letter_Format.pdf22 May 2021
Proforma of Allotment letterFile: Original-RERA AGREEMENT JAI SUKH.pdf22 May 2021
Layout approvalFile: Drawing Plan fnl.pdf21 May 2021
Building plan approvalFile: 2269162_IOD_signed.pdf21 May 2021
PAN CardFile: PAN- JaySukh CHSL.pdf21 May 2021
Copy of the legal title reportFile: Title Certificate FNL.pdf21 May 2021
Details of encumbrancesFile: NO ENCUMBARANCE UNDERTAKING 15-5-2021.pdf21 May 2021
Copy of Layout Approval (in case of layout)File: Drawing Plan fnl.pdf21 May 2021
Building Plan Approval / NA Order for plotted developmentFile: 2269162_IOD_signed.pdf21 May 2021
Commencement Certificates / NA Order for plotted developmentFile: FirstCC_signed.pdf21 May 2021
Declaration in FORM BFile: Form B Promoter FNL.pdf21 May 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_Shri_Jay_Sukh.pdf21 May 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: STATUS OF SOCIETY 15-5-2021.pdf21 May 2021
Status of ConveyanceFile: STATUS OF CONVEYANCE 15-5-2021.pdf21 May 2021

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shri Jay-Sukh Co-Op. Hsg. Soc. Ltd. on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Malad - West6,700+ in Mumbai Suburban

Builder: Saisiddhi Builders and Developers

Saisiddhi Builders and Developers has 1 registration on MahaRERA, including Shri Jay-Sukh Co-Op. Hsg. Soc. Ltd.. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Shri Jay-Sukh Co-Op. Hsg. Soc. Ltd. is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shri Jay-Sukh Co-Op. Hsg. Soc. Ltd.?

The registered promoter entity is Saisiddhi Builders and Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shri Jay-Sukh Co-Op. Hsg. Soc. Ltd.?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shri Jay-Sukh Co-Op. Hsg. Soc. Ltd.?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shri Jay-Sukh Co-Op. Hsg. Soc. Ltd.?

The professionals named in the filing: Architect: Kirti Shah; Architect: Vinayak Despande; Engineer: Naresndra Desai; Chartered Accountant: S B Rawal Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shri Jay-Sukh Co-Op. Hsg. Soc. Ltd.?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shri Jay-Sukh Co-Op. Hsg. Soc. Ltd.. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shri Jay-Sukh Co-Op. Hsg. Soc. Ltd. to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.