Completed No litigation declared Residential / Group Housing project

SHRI GANESH RESIDENCY

By VALLABH RAVINDRA DAMLE

RG-MH-06464 · RERA P52800053346 · Last updated on MahaRERA portal: 17 Oct 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedregistration recorded completed
16 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 90%
5 of 10Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

SHRI GANESH RESIDENCY is a Residential / Group Housing project by VALLABH RAVINDRA DAMLE in Ratnagiri, Maharashtra, registered with MahaRERA as P52800053346 on 27 Oct 2023. The registration is recorded completed; possession was promised by 31 Dec 2028. 5 of the 10 units on this registration are recorded sold or booked, and 16 of 22 construction stages are filed complete.

At a glance

Project

  • NameSHRI GANESH RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • Tilak Ali to Peje wadi
    • Peje Wadi
    • Rahataghar
    • Ratnagiri
    • 415612
  • Pincode415612
  • RERA no.P52800053346
  • ReraGenie IDRG-MH-06464

Builder

  • NameVALLABH RAVINDRA DAMLE
  • Entity typeIndividual

Key dates

this monthRegisteredOct 2023PromisedDec 2028Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Oct 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed64 files

Current status

50%5 of 10 units booked
92.2%Work done, per cost certificate

Figures as on 17 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA53303
WING BNA54707

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

WING A87%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
WING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Closed/Covered7
Open Space27
BuildingClosed/CoveredOpen SpaceTotal
WING A41216
WING B31518

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area600 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Shivaji Rajaram PatilShiralaSangli
Laxmikant Sudhakar MalushteRatnagiri (M Cl)Ratnagiri
Suni Sudhakar MalushteRatnagiri (M Cl)Ratnagiri

Approvals and building plan

Sanctioning authorityRatnagiri Nagar Parishad Ratnagiri
Permissible FSI864.67
Proposed, not sanctioned865 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSubhash Road , Ratnagiri
Estimated costRs 2.58 cr
Cost incurredRs 2.38 cr
Work done92.25%
BuildingWingEstimatedIncurred
WING BNARs 1.78 crRs 1.78 cr
WING ANARs 65.00 lakhRs 60.00 lakh
-NARs 15.00 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMilind R Yadav
EngineerManoj S Joshi
EngineerYatish Ganpat Dorlekar
Chartered AccountantShrikant P Vaidya
Chartered AccountantShrirang P Vaidya
PartnerRole in project
VALLABH RAVINDRA DAMLE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: CC Verification.pdf17 Oct 2025
Occupational CertificateFile: Final OC 2 Wings.pdf25 Sep 2025
Occupational CertificateFile: A wing OC.pdf25 Sep 2025
Withdrawal Update Form 1File: Form 1.pdf12 Sep 2025
Withdrawal Update Form 2File: Form 2.pdf12 Sep 2025
Withdrawal Update Form 3File: Form 3.pdf12 Sep 2025
Form 1File: Form 1.pdf17 Aug 2025
Form 2File: Form 2.pdf17 Aug 2025
Form 3File: Form 3.pdf17 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold-booked.pdf17 Aug 2025
Form 1File: fORM 1.pdf17 Aug 2025
Form 2File: fORM 2.pdf17 Aug 2025
Form 3File: fORM 3.pdf17 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked.pdf17 Aug 2025
Form 2A (FY 2023-2024)File: Form 2A 23-24.pdf17 Aug 2025
Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf17 Aug 2025
Form 5 (FY 2023-2024)File: Form 5 23-24.pdf17 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: fORM 1.pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: fORM 3.pdf9 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: fORM 2.pdf9 May 2025
Disclosure of sold/ booked inventoryFile: sold-booked inventory for rera.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE FOR RERA 31-12-2024.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FOR RERA 31-12-2024.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE FOR RERA 31-12-2024.pdf30 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: quality certificate.pdf14 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf10 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 - converted.pdf10 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf4 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf4 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf4 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf25 Jan 2024
Building plan approvalFile: NA ORDER.pdf11 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: NA ORDER.pdf11 Jan 2024
Declaration about Commencement CertificateFile: declaration.pdf11 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf16 Sep 2023
Proforma of Agreement for saleFile: NEW AFS.pdf16 Sep 2023
Proforma of Allotment letterFile: Allotment.pdf4 Sep 2023
Details of encumbrances concerned to FinanceFile: finance encumbrance.pdf31 Aug 2023
Details of encumbrances concerned to LegalFile: finance encumbrance.pdf31 Aug 2023
CERSAI detailsFile: CERSAI_Search_.pdf31 Aug 2023
Layout approvalFile: PLAN.pdf7 Aug 2023
Building plan approvalFile: permission.pdf7 Aug 2023
PAN CardFile: pan card.pdf7 Aug 2023
Copy of the legal title reportFile: 8A1 1B.pdf7 Aug 2023
Copy of the legal title reportFile: 8A1 1C.pdf7 Aug 2023
Details of encumbrances concerned to FinanceFile: legal encumbrances.pdf7 Aug 2023
Details of encumbrances concerned to LegalFile: legal encumbrances.pdf7 Aug 2023
Copy of Layout Approval (in case of layout)File: PLAN.pdf7 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: permission.pdf7 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: permission.pdf7 Aug 2023
Declaration in FORM BFile: VALLABH DAMLE.pdf7 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf7 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf7 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: discloure of interest.pdf7 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank format.pdf7 Aug 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment.pdf7 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement.pdf7 Aug 2023

How this compares with Ratnagiri

50%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep SHRI GANESH RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Peje Wadi1,100+ in Ratnagiri

Builder: VALLABH RAVINDRA DAMLE

VALLABH RAVINDRA DAMLE has 1 registration on MahaRERA, including SHRI GANESH RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if SHRI GANESH RESIDENCY is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRI GANESH RESIDENCY?

The registered promoter entity is VALLABH RAVINDRA DAMLE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRI GANESH RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHRI GANESH RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRI GANESH RESIDENCY?

The professionals named in the filing: Architect: Milind R Yadav; Engineer: Manoj S Joshi; Engineer: Yatish Ganpat Dorlekar; Chartered Accountant: Shrikant P Vaidya; Chartered Accountant: Shrirang P Vaidya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRI GANESH RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRI GANESH RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRI GANESH RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.