SHRI DATTATRAYA CO. HOUSING SOCIETY LTD
RG-MH-59559 · RERA P52100048893 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 12 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHRI DATTATRAYA CO. HOUSING SOCIETY LTD is a Residential / Group Housing project by ARCHWAY ESTATES DB LLP in Pune, Maharashtra, registered with MahaRERA as P52100048893 on 24 Jan 2023. The registration is recorded completed; possession was promised by 31 Mar 2026. The completion date has moved by 12 months from the original filing. 13 of the 28 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameSHRI DATTATRAYA CO. HOUSING SOCIETY LTD
- TypeResidential / Group Housing
- Location
- ERANDWANE
- Pune (M Corp.)
- Pune City
- Pune
- 411038
- Pincode411038
- RERA no.P52100048893
- ReraGenie IDRG-MH-59559
Builder
- NameARCHWAY ESTATES DB LLP
- Entity typePartnership
- LLPINABB-4282
- GSTIN27ABYFA7558A1Z1
- LLPIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- PartnersDILIP Balkrishna DESHPANDE, PRASANNA PATWARDHAN
- Other registrations2 more →
- Completed1 of 3
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on24 Jan 2023
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 31 Mar 2025)
- Buildings1 building record
- Documents filed80 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHRI DATTATRAYA CO HOUSING SOCIETY LTD | NA | 7 | 7 | 28 | 0 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
SHRI DATTATRAYA CO HOUSING SOCIETY LTD: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed26
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SHRI DATTATRAYA CO. HOUSING SOCIETY LTD | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHRI DATTATRAYA CO HOUSING SOCIETY LTD | NA | Rs 6.53 cr | Rs 6.53 cr |
| - | NA | Rs 29.50 lakh | Rs 29.50 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | CHITALE JOG ASSOCIATES |
| Engineer | KALPAK CONSULTANTS |
| Engineer | MS STRUDCOM CONSULTANTS PVT LTD |
| Chartered Accountant | CHANDORKAR AND LIMAYE |
| Chartered Accountant | A M AWATI & CO AWATI |
| Partner | Role in project |
|---|---|
| ARCHWAY ESTATES DB LLP | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAt the inception of the project, we had estimated that the project would be completed by March 31, 2025. However, after starting the excavation, we encountered substantial hard rock beneath the plot. This discovery significantly slowed the excavation process and necessitated the use of advanced machinery and additional resources. As a result, while we are now nearing the completion stage of the excavation, we need to revise our estimated completion date for the entire project. We request you to consider the new estimated completion date as September 30, 2025. Also Revised Sanction Plan as well
Reason as filed by the promoterElectrical work,sanitary and painting work are pending which will require the extended period to get completed.Fire Fighting equipment installation as well as waterproofing is yet to be completed.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Dec 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed80
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Datta Form 1 31 mar 2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Datta Form 1 31 mar 2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Datta Form 2.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Datta Form 2.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Datta Signed Form 3 31 mar 2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Datta Signed Form 3 31 mar 2026.pdf | 20 Apr 2026 |
| Occupational CertificateFile: DATTA COMPLETION.pdf | 4 Feb 2026 |
| Withdrawal Update Form 1File: datta architect form 1 dec 25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: datta engineer form 2 dec 25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Datta form 3 31Dec2025.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Datta form 1.PDF | 19 Oct 2025 |
| Withdrawal Update Form 2File: Datta Form 2.PDF | 19 Oct 2025 |
| Withdrawal Update Form 3File: Dattatraya Housing society FORM 3.pdf | 19 Oct 2025 |
| Form 5 (FY 2024-2025)File: DB LLP FY 24-25.pdf | 29 Sep 2025 |
| Form 1File: DATTA ARCHITECT FORM 1.PDF | 19 Jul 2025 |
| Form 2File: DATTA ENGINEER FORM 2.PDF | 19 Jul 2025 |
| Form 3File: Datta Signed form 3.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DATTA SALES INVENTORY.PDF | 19 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: QPR DATTA.PDF | 19 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Datta Form 1 mar 25.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Datta Form 3 Signed_.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Datta form 2 mar 25.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Datta inventory.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: archway shri dattatreya form 3_compressed.pdf | 3 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DATTATRYA SOCIETY RERA ARCHITECT FORM 1.pdf | 17 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DATTATRYA SOCIETY RERA ENGINEER FORM 2.pdf | 17 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DATTATRYA SOCIETY RERA SALES INVENTORY.pdf | 17 Jan 2025 |
| Layout approvalFile: Revised layout approval.pdf | 3 Dec 2024 |
| Building plan approvalFile: Revised building approval.pdf | 3 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: Revised layout approval.pdf | 3 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised CC.pdf | 3 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised building approval.pdf | 3 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ARCHWAY ESTATE DB LLP SHRI DATTATRAY_compressed.pdf | 18 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ARCHWAY ESTATE DB LLP SHRI DATTATRAY_compressed.pdf | 18 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: ARCHWAY ESTATE DB LLP FORM 5 SHREE DATTATRAY.pdf | 25 Oct 2024 |
| Declaration in FORM BFile: Datta Form B_compressed.pdf | 26 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dattatrya Society Form 3.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 18 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 18 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Archway Properties DB LLP FORM 3 CERTIFICATE_compressed.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dattatrya Society.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Datta Architect Form 1.pdf | 13 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Datta Engineer FORM 2.pdf | 13 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Datta.pdf | 29 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Datta Form 3 30-9-23.pdf | 30 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Dattatrya FORM 5.pdf | 5 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 21 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 21 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dattatraya Form 3.pdf | 21 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1.pdf | 4 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2.pdf | 4 May 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory sale.pdf | 4 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Form 3 Datta.pdf | 4 May 2023 |
| Declaration in FORM BFile: Form B Affidavit cum declaration.pdf | 19 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 23 Datta Updated Form 3.pdf | 6 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: 3 Datta finance encumbrances updated.pdf | 5 Jan 2023 |
| Details of encumbrances concerned to LegalFile: 3 Datta finance encumbrances updated.pdf | 5 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: 16 No Legal Encumbrances.pdf | 3 Jan 2023 |
| Details of encumbrances concerned to LegalFile: 16 No Legal Encumbrances.pdf | 3 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Archway Estates DB LLP Patwardhan.pdf | 3 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Archway Estates DB LLP Deshpande.pdf | 3 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Archway Estates DB LLP Madkar.pdf | 3 Jan 2023 |
| Proforma of Agreement for saleFile: 12 Agreement for Sale.pdf | 23 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: 22 Deviation report as respect to AFS DATTA.pdf | 23 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: 19 Datta Sold Unsold Inventory updated.pdf | 22 Dec 2022 |
| Layout approvalFile: 7 Revised Plan sanction-01_compressed.pdf | 21 Dec 2022 |
| Building plan approvalFile: 8 Revised Plan Sanction-02_compressed.pdf | 21 Dec 2022 |
| PAN CardFile: 1 Archway Estates DB LLP PAN.pdf | 21 Dec 2022 |
| Copy of the legal title reportFile: 2 Search and Title Report.pdf | 21 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: 7 Revised Plan sanction-01_compressed.pdf | 21 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 8 Revised Plan Sanction-02_compressed.pdf | 21 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 4 Commencement Certificate.pdf | 21 Dec 2022 |
| Declaration about Commencement CertificateFile: 5 Declaration about Commencement.pdf | 21 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13 Form 1 Architect Dattatrya.pdf | 21 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14 Form 2 Engineer Dattatrya.pdf | 21 Dec 2022 |
| CERSAI detailsFile: 18 CERSAI deatils.pdf | 21 Dec 2022 |
| Proforma of Allotment letterFile: 20 Model Allotment letter.pdf | 21 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 17 Declaration about Separate bank account.pdf | 21 Dec 2022 |
| Deviation Report with respect to Allotment letterFile: 21 Deviation Report with respect to Allotment Letter.pdf | 21 Dec 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 80 filed documents as one ZIP, foldered, with a manifest
Keep SHRI DATTATRAYA CO. HOUSING SOCIETY LTD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ERANDWANE13,700+ in Pune
Pratik Nagar Palladio Kothrud Central
Vilas Javdekar Infinitee Developers Pvt. L
NEW FRIENDS
MAJESTIQUE DUROPOLIS PRIVATE LIMITED
SARVATRA CO-OP HSG SOCIETY LTD
Suryakant Kakade
Kshitij Residency
Yash Buildcon
MAYUK
MAYUR CORPORATION
Pune Baner Project-Tower 4 and 5
Goel Ganga Ventures India Private Limited
Builder: ARCHWAY ESTATES DB LLP
ARCHWAY ESTATES DB LLP has 3 registrations on MahaRERA, including SHRI DATTATRAYA CO. HOUSING SOCIETY LTD and Triveni Co-operative Housing Society Ltd PH 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SHRI DATTATRAYA CO. HOUSING SOCIETY LTD is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHRI DATTATRAYA CO. HOUSING SOCIETY LTD?
The registered promoter entity is ARCHWAY ESTATES DB LLP, a partnership as per the filing. Its LLPIN ABB-4282 and GSTIN 27ABYFA7558A1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHRI DATTATRAYA CO. HOUSING SOCIETY LTD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHRI DATTATRAYA CO. HOUSING SOCIETY LTD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHRI DATTATRAYA CO. HOUSING SOCIETY LTD?
The professionals named in the filing: Architect: CHITALE JOG ASSOCIATES; Engineer: KALPAK CONSULTANTS; Engineer: MS STRUDCOM CONSULTANTS PVT LTD; Chartered Accountant: CHANDORKAR AND LIMAYE; Chartered Accountant: A M AWATI & CO AWATI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHRI DATTATRAYA CO. HOUSING SOCIETY LTD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback